STAR Protected

Further tests with lead

I threw photons over the entire endcap in the pt range 6-10 GeV.  Plots below are of reconstructed tower energy in the entire endcap divided by the input energy.

Ivan's Presentation

Speaker : Ivan Koralt ( ODU )


Talk time : 14:00, Duration : 00:20

My recent work.

pp2pp Test Meeting

2009-11-04 14:00
2009-11-04 15:00
US/Eastern
Wednesday, 4 November 2009
510 1-189, at 19:00 (GMT), duration : 01:00

Example of a meeting...

TimeTalkPresenter
14:00Ivan's Presentation ( 00:20 ) 1 fileIvan Koralt (ODU)

pp2pp Meeting

2009-12-30 14:00
2009-12-30 15:00
US/Eastern
Wednesday, 30 December 2009
510 1-189, at 19:00 (GMT), duration : 01:00

Discussion of pp2pp analysis.

Description: pp2pp weekly
Community: Universe
Password: WeeklyElastic


- Meeting URL
http://evo.caltech.edu/evoGate/koala.jnlp?meeting=ete8eavsvaauaDaIIt

- Password: WeeklyElastic
- Phone Bridge ID: 42134  Password: 9771

EVO Phone Bridge Telephone Numbers:

- USA (Caltech, Pasadena, CA) +1 626 395 2112

- USA (BNL, Upton, NY) +1 631 344 6100
 

pp2pp Meeting

2009-12-16 14:00
2009-12-16 15:00
US/Eastern
Wednesday, 16 December 2009
510 1-189, at 19:00 (GMT), duration : 01:00

Discussion of pp2pp analysis.

Description: pp2pp weekly
Community: Universe
Password: WeeklyElastic


- Meeting URL
http://evo.caltech.edu/evoGate/koala.jnlp?meeting=ete8eavsvaauaDaIIt

- Password: WeeklyElastic
- Phone Bridge ID: 42134  Password: 9771

EVO Phone Bridge Telephone Numbers:

- USA (Caltech, Pasadena, CA) +1 626 395 2112

- USA (BNL, Upton, NY) +1 631 344 6100
 

pp2pp Meeting

2009-12-02 14:00
2009-12-02 15:00
US/Eastern
Wednesday, 2 December 2009
510 1-189, at 19:00 (GMT), duration : 01:00

Discussion of pp2pp analysis.

Description: pp2pp weekly
Community: Universe
Password: WeeklyElastic


- Meeting URL
http://evo.caltech.edu/evoGate/koala.jnlp?meeting=ete8eavsvaauaDaIIt

- Password: WeeklyElastic
- Phone Bridge ID: 42134  Password: 9771

EVO Phone Bridge Telephone Numbers:

- USA (Caltech, Pasadena, CA) +1 626 395 2112

- USA (BNL, Upton, NY) +1 631 344 6100
 

CD1 - Corrections to W Section and Figure

pp2pp Meeting

2009-11-18 14:00
2009-11-18 15:00
US/Eastern
Wednesday, 18 November 2009
510 1-189, at 19:00 (GMT), duration : 01:00

Discussion of pp2pp analysis.

We'll have our biweekly meeting Wednesday Nov. 18 at 2 p.m. in 1-189 in Physics. Please use headsets if you are using a laptop to avoid echo. Otherwise please mute when you are not talking, for the same reason. Please post your talks/comments on the Drupal website.

1. Progress report on transport calculation - Todd
 
2. Update from Donika and Ivan
 
3. Other updates - let me know
 

Description: pp2pp weekly
Community: Universe
Password: WeeklyElastic


- Meeting URL
http://evo.caltech.edu/evoGate/koala.jnlp?meeting=ete8eavsvaauaDaIIt

- Password: WeeklyElastic
- Phone Bridge ID: 42134  Password: 9771

EVO Phone Bridge Telephone Numbers:

- USA (Caltech, Pasadena, CA) +1 626 395 2112

- USA (BNL, Upton, NY) +1 631 344 6100
 

TimeTalkPresenter
14:00After Alignment ( 00:20 ) 1 fileKin Yip
14:20RHIC pp2pp Optics Update ( 00:20 ) 1 fileTodd Satogata (BNL)
14:40Acceptance Simulations for Run09 ( 00:20 ) 1 fileDonika Plyku

11/4 Group Meeting Update

1.

Selecting 2005 status table for simulation

Outlined here is the process of selecting the status table to apply for 2005 simulation data.

 

2009-11-03

3 November 2009

Very brief meeting, everyone still working on understanding geometry.

2009.11.03 Jason EEMC geometry: Effect of ELED block change

Monte-Carlo setup:

RHICBOS AL prediction for Transverse Mass

RHICBOS AL prediction for Transverse Mass

2009.11.03 BEMC sampling fraction: with and without LOW_EM option

Monte-Carlo setup:

Time Dependency in BEMC Gains, Piecewise Linear Fit by Day

We are continuing to refine our characterizations of the time-dependence for BEMC gains.

Problems with applying TPC alignment

I ran a test (in SL09e) where I made the alignment of one sector grossly wrong.

Very Preliminary Run6 FPD AN with cuts

The following plots all show RAW cross ratio without polarization corrections.

Run6 FPD Fiducial cut

For all previous FPD analysis, fiducial volume cut of 0.5cell width has been used.

2009.11.02 Jason EEMC geometry: results with and without LOW_EM options

Monte-Carlo setup: