STAR Protected

2009.10.30: Jason EEMC geometry: Jason with ELED block from CVS file

FYI: Alice blog on ELED block study

Monte-Carlo setup:

2005 BEMC status tables

I did a scan over all runs in my runlist to check the BEMC status tables over time.

List of STAR Juniors

Testing changes to cvs geometry file

This page contains work I've done looking at cvs vs. v23 with the extra SMD layers turned off.  Results are presented in reverse chronological order.

revised pp500 embedding request for W paper

Revised embedding request needed for publication of W xSection form run 9.

The request consist of 2 parts.

Embedding structure

Organization, responsibilities, authorities and policies related to Embedding

Due to the increasing demand of the STAR collaboration, associated to the need for redundancy

first scan of run 9 rellumi

 Having finally retrieved all the scaler data out of HPSS, I calculated from boards 6 and 11 relative luminosity R3 from ZDC and BBC coincidences.

vernier scan update for spin pwg

Project Overview

Speaker : F.Videbaek


Talk time : 14:35, Duration : 00:20

Knowledge and assumptions about Dalitz, Non-photonic, and Conversion electrons and their effects on correlations and spectra

This document discusses what you need to know and/or assume about efficiencies for non-photonic, conversion, and Dalitz electrons in order to derive spectra and correlations.

HFT Rehearsal - October 29, 2009 / IST Presentation

FHC cosmic ray test status

preparation to pp500 W-embedding

Section A)-----------------------------

STAR Management Meeting

2009-10-29 11:00
2009-10-29 12:00
Etc/GMT-7
Thursday, 29 October 2009
BNL, 50-Orange Room, at 15:00 (GMT), duration : 01:00

EVO: Title: STAR Management Meeting // Community:  STAR // Password:  star

           Phone Bridge: +1 626 395 2112 (CA) / +1 631 344 6100 (NY) // ID: 39499 // Password: 0952

   Time:  11 AM - 12 PM EDT

 * --===================================================================--*

  Agenda:

1) Run10 preparation - Bill

2) FHC - Flemming

3) Double credits for shifts over Xmas and New Year's day?

4) TBD

* --====================================================================--*

               Brief Summary:

  0) Attendency:

  Notes:

   1) STAR TPC Review (key= star2009),  June 4,5, BNL. Ron Settler (chair). Review report.

   2) NPE Committee, H. Huang (chair) 

   3) STAR TOF Close Out Review, Aug. 10-11. Review report and The Plan.

   4) STAR FMS Review agenda, Sept. 1-2, BNL, P. Jacobs (chair). Review report

              

               Future Meetings:

    1) STAR-DoE HFT CD-1 review, postpond to Nov. 12-13, BNL.

        The rehearsal is scheduled on Thursday and Friday, Oct. 29 and 30th.

    2) STAR Analysis Meeting, Jan. 11-15, 2010, UT Austin

    3) APS April meeting, Feb. 13-17, 2010, Washongton DC.

Physics of HFT

Speaker : N. Xu ( LBNL )


Talk time : 09:00, Duration : 00:20

eta dependence of non-gaussianity

I divided the vernier scan data into five segments by eta rings, 0 corresponding to the highest abs(eta), 4 corresponding to the lowest.

2009-10-27

Minutes 27 October 2009

Q=Question
A=Answer
C=Comment

---------------------------------------------------------------------------------------------

2009.10.27: Jason EEMC geometry: comparison without LOW_EM option

Monte-Carlo setup:

Twist correction notes, pp2009

The twist correction has been detailed in STAR notes and in blog entries (see Eric Hjort and Gene Van Buren's blogs).