STAR Protected

HFT meeting

2009-09-03 09:00
Etc/GMT-5
Thursday, 3 September 2009
room 3-192 Physics, BNL, at 13:00 (GMT), duration : 00:00

 HFT pre-dry run. 

The meeting will have a number of talks that matches those for the CD-1 review of the HFT project. 

In addition there will be discussion on outstanding issues surrounding CDR, other document, cost and schedule.

A real dry-run will be scheduled in about one month; and the review likely in the week of November 9.

TimeTalkPresenter
09:00Project Overview ( 00:45 ) 1 fileFlemming Videbaek (BNL)
09:45Pixel detector ( 00:45 ) 1 fileHoward Wieman (LBL)
10:30Break ( 00:20 ) 0 files
10:50SSD electronics Upgrade ( 00:45 ) 1 fileMicheal LeVine (BNL)
11:35IST sub-system ( 00:45 ) 0 filesBernd Surrow (MIT)
13:30HFT Physics ( 00:45 ) 2 filesNu Xu (LBL)
14:15Global Support Structure, Assembly, and installation ( 00:45 ) 1 fileEric Anderssen (LBL)
15:00Discussion on documents and issues for CD-1 ( 02:00 ) 0 filesAll

New Fits

New Fits for the physics asymmetries,  including transverse, sideways, and cubic correction

Check of material in corrected EEMC geometry

RICH scaler ntuple

WHAT THIS IS

STAR Management Meeting

2009-09-04 11:00
2009-09-04 12:00
Etc/GMT-7
Friday, 4 September 2009
BNL, 50-I-189, at 15:00 (GMT), duration : 01:00

EVO: Title: STAR Management Meeting // Community:  STAR // Password:  star

           Phone Bridge: +1 626 395 2112 (CA) / +1 631 344 6100 (NY) // ID: 1202597 // Password: 0952

   Time:  11 AM - 12 PM EDT

 * --===================================================================--*

  Agenda:

1) MOU - Nu (Committee: Nu, Jamie, Jerome, Hank, +1, +2)

2) Run8 data analysis -Jerome / Bedanga

3) Next Analysis Meeting (UTA) - Nu


* --====================================================================--*

               Brief Summary:

  0) Attendency: Bernd, Bill, Nu, Bedanga, Jamie, Flemming

  1) More on MOU next Thursday. MOU effort combined with Shift, Reviews, and other Decadal Plan related efforts withi STAR.

  2) More on FMS review report next Thursday.

  Notes:

   1) STAR TPC Review (key= star2009),  June 4,5, BNL. Ron Settler (chair). Review report.

   2) NPE Committee, H. Huang (chair) 

   3) STAR TOF Close Out Review, Aug. 10-11. Review report.

  Future Meetings:

    1) STAR FMS Review (draft agenda), Sept. 1-2, BNL, P. Jacobs (chair)

    2) STAR-DoE HFT CD-1 review, postpond to Nov., BNL

    3) STAR Regional meeting: Sept. 25-26, Rio, Brazil

    4) SQM2009: Sept. 27-Oct. 2, Buzios, Brazil

    5) STAR Collaboration meeting, Oct. 5-10, Berkeley

    6) DNP 2009, Oct. 13 - 17, Waikoloa

2009.08.27 fixed EEMC geometry: pre-shower sorted shower shapes & eta-meson comparison

Test of corrected EEMC geometry: shower shapes (bug 1618)

Monte-Carlo setup is desribed he

BSMD Calibration - Changes since MIT/Yesterday's Presentation (Error Analysis)

In this blog, I...

-Will discuss yesterday's presentation, and the error I made in the calculation of the constants.

2009.08.25 Test of corrected EEMC geometry: shower shapes

Test of corrected EEMC geometry (bug 1618)

Monte-Carlo setup is desribed here

PDSF Data transfer notes

 Eric Hjort has extensive notes on the data transfer methods developed for PDSF (http://drupal.star.bnl.gov/STAR/comp/grid/documentation/srm-instructions-for-bulk-file-transfer-to-pdsf).

ROOT-based analysis for the FMS

Speaker : Steven Heppelmann ( PSU )


Talk time : 15:10, Duration : 00:40

Cockcroft-Walton HV system

Speaker : Leonard Eun ( PSU )


Talk time : 11:20, Duration : 00:20

2009.05.12 Variable distributions after LDA at 70% efficiency

Cut optimization with Fisher's LDA classifier

For this post LDA results with Set1 and Set2 has been used

STAR Management Meeting

2009-08-27 11:00
2009-08-27 12:00
Etc/GMT-7
Thursday, 27 August 2009
BNL, 50-Orange Room, at 15:00 (GMT), duration : 01:00

EVO: Title: STAR Management Meeting // Community:  STAR // Password:  star

           Phone Bridge: +1 626 395 2112 (CA) / +1 631 344 6100 (NY) // ID: 923509 // Password: 0952

   Time:  11 AM - 12 PM EDT

 * --===================================================================--*

  Agenda:

1) MOU - Hank and All

2) STAR Regional Meeting at Rio / SQM09 - Olga

3) HF co-convener progress  // BulkCorr co-covener

4) Run8 data analysis -Bedanga

5) Next Analysis Meeting (UTA) - Nu

6) Spin Task Force - Nu


* --====================================================================--*

               Brief Summary:

  0) Attendency: Bedanga, Bernd, Helen, Flemming, Nu, Jamie

  1) MOU: restart the MOU process from the joint effort: management & Council. Form a joint committee.

  2) Regional meeting at Rio: Sept. 25: rehearsal STAR SQM talks 7+2 / Sept. 26: RHIC physics and data analysis discussions

  3) co-convener selection: move on in both HF and BulkCorr PWGs

  4) Run8: (i) h+- issue, unknown sources, distoration; (ii) centrality issue. Need more ideas. Discuss next week.

  5) Analysis meeting: UTA , week of January 11, 2010.

  6_ Spin task force:

 

 

 

  Notes:

   1) STAR TPC Review (key= star2009),  June 4,5, BNL. Ron Settler (chair). Review report.

   2) NPE Committee, H. Huang (chair) 

   3) STAR TOF Close Out Review, Aug. 10-11. Review report.

  Future Meetings:

    1) STAR FMS Review (draft agenda), Sept. 1-2, BNL, P. Jacobs (chair)

    2) STAR-DoE HFT CD-1 review, postpond to Nov., BNL

    3) STAR Regional meeting: Sept. 25-26, Rio, Brazil

    4) SQM2009: Sept. 27-Oct. 2, Buzios, Brazil

    5) STAR Collaboration meeting, Oct. 5-10, Berkeley

    6) DNP 2009, Oct. 13 - 17, Waikoloa

FHC transverse study summary

 

     I used the Zoffset for FHC is 850cm and 948cm.

Linearity Check in fixed ecalgeo.g, take II

Abstract:  The EEMC geometry (ecalgeo.g) has been modified to remove a bug which resulted in approximately 1 radiation length of lead being inserted at the shower-maximum depth.  In this blog entry, the response of the modified geometry to various particles is determined over a range in energy from 0.5 to 200 GeV.  For photons we find that the linearity of the simulated EEMC sampling fraction is good to better than 1% over the range of energies studied.  Electrons above 2 GeV and neutral pions above 7 GeV exhibit similar linearities.

Linearity Check in fixed ecalgeo.g

Abstract:  A bug in the EEMC geometry has been identified.  Lines such as "Material Air isvol=0" have an unexpected (read undocumented) behavior: they create a new materi

STAR Spin Task Force

2009-08-19 13:00
Etc/GMT-5
Wednesday, 19 August 2009
, at 17:00 (GMT), duration : 00:00

 STAR Spin Task Force Meeting

WWW-Page

Material for Meetings


 

2010 meetings:

 

  • April 28, 2010, 01:00-02:00 PM (EST), EVO phone bridge: 631-344-6100 or 626-395-2112
  • EVO-bridge: ID 1852509 / Password 9052 
  • EVO conference - Community STAR: STAR Spin Task Force / Password: starspin
  • Proposed Next face-to-face meeting: Wednesday, April 28, 2010 at BNL
  • Agenda:
    • BUR Run 11/12 : ALL
    • Writing updates: ALL
      • 1 Executive Summary : Bernd (Ernst)
      • 2 Theoretical framework : Ernst (Bernd)
      • 3 RHIC polarized pp performance Stephan (Jim)
      • 4 Gluon Polarization Program
        • Inclusive jets : Carl
        • Di-Jets : Jim / Bernd
        • Photons : Alice
      • 5 W boson Program : Bernd (Ernst)
      • 6 Transverse Spin Program Steve
        • Forward physics: Steve / Akio
        • Mid-rapidity: Renee
        • Lambda polarization: Qinghua
      • 7 Summary and Outlook : Jim / Bernd (Ernst)

 

  • April 14, 2010, 01:00-02:00 PM (EST), EVO phone bridge: 631-344-6100 or 626-395-2112
  • EVO-bridge: ID 1808061 / Password 9052 
  • EVO conference - Community STAR: STAR Spin Task Force / Password: starspin
  • Proposed Next face-to-face meeting: Wednesday, April 28, 2010 at BNL
  • Agenda:
    • BUR Run 11 Discussion : ALL
    • Updates : ALL

 

  • March 24, 2010, 01:00-02:00 PM (EST), EVO phone bridge: 631-344-6100 or 626-395-2112
  • EVO-bridge: ID 1741382 / Password 9052 
  • EVO conference - Community STAR: STAR Spin Task Force / Password: starspin
  • Reminder: Next face-to-face meeting: Sunday, March 28, 2010 at BNL
  • Agenda:
    • BUR Run 11 Discussion : ALL
    • Updates : ALL

  

  • March 10, 2010, 01:00-02:00 PM (EST), EVO phone bridge: 631-344-6100 or 626-395-2112
  • EVO-bridge: ID 1701704 / Password 9052 
  • EVO conference - Community STAR: STAR Spin Task Force / Password: starspin
  • Reminder: Next face-to-face meeting: Sunday, March 28, 2010 at BNL
  • Agenda:

 

  • March 03, 2010, 01:00-02:00 PM (EST), EVO phone bridge: 631-344-6100 or 626-395-2112
  • EVO-bridge: ID 1681240 / Password 9052 
  • EVO conference - Community STAR: STAR Spin Task Force / Password: starspin
  • Reminder: Next face-to-face meeting: Sunday, March 28, 2010 at BNL
  • Agenda:
    • Updates from photon analysis : Alice
    • Updates from transverse spin program : Akio / Steve
    • Posting of final 200GeV / 500 GeV inclusive and di-jet (200 / 500) projections
    • Updates from W projections

 

  • February 22, 2010, EVO phone bridge: 631-344-6100 or 626-395-2112
  • EVO-bridge: 631-344-6100 or 626-395-2112 : ID 1649525 / Password 9052 
  • EVO conference - Community STAR: STAR Spin Task Force / Password: starspin
  • Regular phone bridge: 2261 (09:00AM-10:30AM) / 6363 (10:30AM-06:00PM)
  • Discussion on 300pb-1 trigger rate: Carl
  • Preparation of global analysis input
  • Status of transverse spin program: Short-term / Long-term: Steve
  • Mid-rapidity transverse spin discussion: Renee
  • Outline / Topics / Writing status
    • 1 Executive Summary : Bernd (Ernst)
    • 2 Theoretical framework : Ernst (Bernd)
    • 3 RHIC polarized pp performance Stephan (Jim)
    • 4 Gluon Polarization Program
      • Inclusive jets : Carl
      • Di-Jets : Jim / Bernd
      • Photons : Alice
    • 5 W boson Program : Bernd (Ernst)
    • 6 Transverse Spin Program Steve
      • Forward physics: Steve / Akio
      • Mid-rapidity: Renee
      • Lambda polarization: Qinghua
    • 7 Summary and Outlook : Jim / Bernd (Ernst)

 

  • February 10, 2010, 01:00-02:00 PM (EST), EVO phone bridge: 631-344-6100 or 626-395-2112
  • EVO-bridge: 631-344-6100 or 626-395-2112 : ID 1622043 / Password 9052 
  • EVO conference - Community STAR: STAR Spin Task Force / Password: starspin
  • Reminder: Next face-to-face meeting: Monday, February 22, 2010 at BNL
  • Photon studies : Steve
  • Preparation of globala analysis input
  • Outline / Topics / Writing status

 

  • January 27, 2010, 01:00-02:00 PM (EST), EVO phone bridge: 631-344-6100 or 626-395-2112
  • EVO-bridge: 631-344-6100 or 626-395-2112 : ID 1577019 / Password 9052 
  • EVO conference - Community STAR: STAR Spin Task Force / Password: starspin
  • Deadlines:
    • Spin Task Force Report: April 30, 2010 (Collect Material on chapters: March 15, 2010)
    • BUR Run 11 Submission to S. Vigdor: June 01, 2010
    • PAC Run 11: June 21-22, 2010
    • Decadal Plan Submission to S. Vigdor: August 01, 2010
  • Spin Task Force Report - Location of LATEX Material
  • Chapter assignment
  • Outline / Topics:

2009 meetings:

  • December 16, 2009, 12:00-02:00 PM (EST), EVO phone bridge: 631-344-6100 or 626-395-2112
  • EVO-bridge: 631-344-6100 or 626-395-2112 : ID 1476679 / Password 9052 
  • EVO conference - Community STAR: STAR Spin Task Force / Password: starspin
  • Agenda items: See Email list
  • November 18, 2009, 01:00-02:00 PM (EST), EVO phone bridge: 631-344-6100 or 626-395-2112
  • EVO-bridge: 631-344-6100 or 626-395-2112 : ID 1405682 / Password 9052 
  • EVO conference - Community STAR: STAR Spin Task Force / Password: starspin
  • Talks at LBL Meeting:
  • November 11, 2009, 01:00-02:00 PM (EST), EVO phone bridge: 631-344-6100 or 626-395-2112
  • EVO-bridge: 631-344-6100 or 626-395-2112 : ID 1385027 / Password 9052 
  • EVO conference - Community STAR: STAR Spin Task Force / Password: starspin
    • Future STAR Spin program - RSC Meeting (Delta G / W / Transverse Spin): ALL
  • November 04, 2009, 01:00-02:00 PM (EST), EVO phone bridge: 631-344-6100 or 626-395-2112
  • EVO-bridge: 631-344-6100 or 626-395-2112 : ID 1362864 / Password 9052 
  • EVO conference - Community STAR: STAR Spin Task Force / Password: starspin
    • Run 9 Inclusive Jet ALL projections - Posting of ALL uncertainties vs. pT: Carl
    • Run 9 Inclusive Jets ALL systematics : Carl / Ernst
    • Run 9 Di-Jet projections vs. M: Bernd
    • Future STAR Spin program - RSC Meeting Statement (Delta G / W / Transverse Spin): ALL
  • September 30, 2009, 01:00-02:00 PM (EDT), EVO phone bridge: 631-344-6100 or 626-395-2112
  • EVO-bridge: 631-344-6100 or 626-395-2112 : ID 1265989 / Password 9052 
  • EVO conference - Community STAR: STAR Spin Task Force / Password: starspin
    • Run 9 Inclusive Jet ALL projections : Carl
    • Run 11 - DAQ / Trigger constraints : Carl
    • Task list : Jim
    • Collaboration talk, Tuesday, October 06, 2009 ("Update from Spin Task Force") : Ernst/ALL
  • September 16, 2009, 01:00-02:00 PM (EDT), phone 617-452-5208
    • Status of grid preparations and discussions with Werner : Bernd
    • Run 11 Transverse Spin program (Status and Plans on Projections / Simulations) : Akio / Steve
    • Discussion on AL Projections : ALL
    • Discussion on ALL Projections (Hadrons / Jets) based on Run 9 data: ALL
  • August 19, 2009, 01:00-02:00 PM (EDT), phone 617-452-2163
    • Organizational matters:
      • Meeting times : ALL
      • Additional STAR Collaborators : ALL
    • Physics:
    • AOB

 

TimeTalkPresenter
12:00Run 11 Transverse Spin program ( 00:20 ) 1 file
12:20Transverse Running ( 00:20 ) 0 files
12:40DeltaG_STAR.pdf ( 00:20 ) 1 file

Photon analysis links

Photon reconstruction and analysis focus group

Photon presentations

Photon presentations

Photon literature and references

Photon literature and references