STAR Protected
Run - 10 Plans from Light Flavour Spectra PWG
Updated on Wed, 2009-10-07 06:28. Originally created by bedanga on 2009-09-05 22:05.Reference
Speaker : Lijuan Ruan ( BNL )
Talk time : 14:30, Duration : 00:20
Report from Light Flavour Spectra PWG
Updated on Wed, 2009-10-07 07:11. Originally created by bedanga on 2009-09-05 21:38.Reference
Speaker : Lijuan Ruan ( BNL )
Talk time : 09:00, Duration : 00:30
STAR Management Meeting
BNL, 50-Orange Room, at 15:00 (GMT), duration : 01:00
EVO: Title: STAR Management Meeting // Community: STAR // Password: star
Phone Bridge: +1 626 395 2112 (CA) / +1 631 344 6100 (NY) // ID: 923521 // Password: 0952
Time: 11 AM - 12 PM EDT
* --===================================================================--*
Agenda:
1) MOU - Nu (Committee: Nu, Jamie, Jerome, Hank, Renee, Subhasis)
2) Run8 data analysis -Jerome / Bedanga
3) BulkCorr / HF PWG conveners
* --====================================================================--*
Brief Summary: 0) Attendency: Bernd, Bill, Jerome, Flemming, Nu, Bedanga, Olga, Helen.
1) WAH activities: (i) TPC supporting structures worked! (ii) ShowerMAx fues are changed/tested.
2) MOU task force: nothing happened since last Friday. Will start the process this week, - Nu
3) Run8 data process, h+/h- differences: before run8, charged hadrons are averaged, h=(h+ + h-)/2; Waiting for run9 preliminary results (in two weeks); possible workshop focused on the issues; precising calibration procedure(s), automake the process;
4) Conveners
5) STC: a message to the management from Nu
6) Olga - phi-meson issue: discuss next Thursday, needs a summary document
7) Olga - shift sign up: training requirements, ... Shift sign up starts early Oct. for 20 weeks.
Notes:
1) STAR TPC Review (key= star2009), June 4,5, BNL. Ron Settler (chair). Review report.
2) NPE Committee, H. Huang (chair)
3) STAR TOF Close Out Review, Aug. 10-11. Review report.
Future Meetings:
1) STAR FMS Review (draft agenda), Sept. 1-2, BNL, P. Jacobs (chair)
2) STAR-DoE HFT CD-1 review, postpond to Nov., BNL
3) STAR Regional meeting: Sept. 25-26, Rio, Brazil
4) SQM2009: Sept. 27-Oct. 2, Buzios, Brazil
5) STAR Collaboration meeting, Oct. 5-10, Berkeley
6) DNP 2009, Oct. 13 - 17, Waikoloa
7) APS April meeting, Feb. 13-17, 2010, Washongton DC. (abstract deadline: Oct. 23, 2009)
2009.09.04 Test of corrected EEMC geometry: SVT, slow-simulator on/off, pre-shower migration
Test of corrected EEMC geometry: shower shapes (bug 1618)
Monte-Carlo setup:
First look at TPC slewing
Calibrating padrow-by-padrow T0s showed evidence of dependence of T0s on anode HV: the padrows under anode section 7-6 (padrows 22-29) showed a shift of 15-20 ns for a reduction in voltage fr
09 Sep
September 2009 posts
Pixel detector
Reference
Speaker : Howard Wieman ( LBL )
Talk time : 09:45, Duration : 00:45
Pixel detector sub-system:
mechanical and electric
Project Overview
Reference
Speaker : Flemming Videbaek ( BNL )
Talk time : 09:00, Duration : 00:45
Introduction to meeting;
Version 0 of CD-1 review talk
HFT meeting
room 3-192 Physics, BNL, at 13:00 (GMT), duration : 00:00
HFT pre-dry run.
The meeting will have a number of talks that matches those for the CD-1 review of the HFT project.
In addition there will be discussion on outstanding issues surrounding CDR, other document, cost and schedule.
A real dry-run will be scheduled in about one month; and the review likely in the week of November 9.
Time | Talk | Presenter |
---|---|---|
09:00 | Project Overview ( 00:45 ) 1 file | Flemming Videbaek (BNL) |
09:45 | Pixel detector ( 00:45 ) 1 file | Howard Wieman (LBL) |
10:30 | Break ( 00:20 ) 0 files | |
10:50 | SSD electronics Upgrade ( 00:45 ) 1 file | Micheal LeVine (BNL) |
11:35 | IST sub-system ( 00:45 ) 0 files | Bernd Surrow (MIT) |
13:30 | HFT Physics ( 00:45 ) 2 files | Nu Xu (LBL) |
14:15 | Global Support Structure, Assembly, and installation ( 00:45 ) 1 file | Eric Anderssen (LBL) |
15:00 | Discussion on documents and issues for CD-1 ( 02:00 ) 0 files | All |
New Fits
New Fits for the physics asymmetries, including transverse, sideways, and cubic correction
STAR Management Meeting
BNL, 50-I-189, at 15:00 (GMT), duration : 01:00
EVO: Title: STAR Management Meeting // Community: STAR // Password: star
Phone Bridge: +1 626 395 2112 (CA) / +1 631 344 6100 (NY) // ID: 1202597 // Password: 0952
Time: 11 AM - 12 PM EDT
* --===================================================================--*
Agenda:
1) MOU - Nu (Committee: Nu, Jamie, Jerome, Hank, +1, +2)
2) Run8 data analysis -Jerome / Bedanga
3) Next Analysis Meeting (UTA) - Nu
* --====================================================================--*
Brief Summary:0) Attendency: Bernd, Bill, Nu, Bedanga, Jamie, Flemming
1) More on MOU next Thursday. MOU effort combined with Shift, Reviews, and other Decadal Plan related efforts withi STAR.
2) More on FMS review report next Thursday.
Notes:
1) STAR TPC Review (key= star2009), June 4,5, BNL. Ron Settler (chair). Review report.
2) NPE Committee, H. Huang (chair)
3) STAR TOF Close Out Review, Aug. 10-11. Review report.
Future Meetings:
1) STAR FMS Review (draft agenda), Sept. 1-2, BNL, P. Jacobs (chair)
2) STAR-DoE HFT CD-1 review, postpond to Nov., BNL
3) STAR Regional meeting: Sept. 25-26, Rio, Brazil
4) SQM2009: Sept. 27-Oct. 2, Buzios, Brazil
5) STAR Collaboration meeting, Oct. 5-10, Berkeley
6) DNP 2009, Oct. 13 - 17, Waikoloa
BSMD Calibration - Changes since MIT/Yesterday's Presentation (Error Analysis)
In this blog, I...
-Will discuss yesterday's presentation, and the error I made in the calculation of the constants.