STAR Protected
Pixel subsystem
Updated on Mon, 2009-10-05 00:28 by wieman. Originally created by videbaks on 2009-10-02 19:15.Reference
Speaker : H. Wieman
Talk time : 10:30, Duration : 00:30
Physics of HFT
Updated on Mon, 2009-10-05 11:04 by hgritter. Originally created by videbaks on 2009-10-02 19:13.Reference
Speaker : Nu Xu
Talk time : 08:45, Duration : 00:45
Project Overview
Updated on Mon, 2009-10-05 10:15. Originally created by videbaks on 2009-10-02 19:12.Reference
Speaker : F. Videbaek ( BNL )
Talk time : 09:30, Duration : 00:45
DB access: write data
// Initialize db manager
StDbManager* mgr = StDbManager::Instance();
StDbConfigNode* node = mgr->initConfig("Calibrations_[subsystem_name]");
DB access: read data
// this will be in chain
St_db_Maker *dbMk=new St_db_Maker("db", "MySQL:StarDb", "$STAR/StarDb");
dbMk->SetDebug();
dbMk->SetDateTime(20090301,0); // event or run start time
Update 2+1 paper status
Updated on Fri, 2009-10-09 13:24 by kkauder. Originally created by putschke on 2009-10-01 09:11.Reference
Speaker : Kolja
Talk time : 16:45, Duration : 00:30
2009-09-29
Meeting Agenda:
1) roundtable: updates/progress?
-> redux EEMC geometry, decoder, tests - all
D0 Signal Update-Comparison of HPSS and NFS files
Analysis of HPSS and NFS files for D0 signal
iSCSI SAN Speed Test Results
The hardware used for testing is as follows:
-iSCSI SAN:
Search for QCD Critical Point: High Moment of Event by Event Multiplicity Distribution
Updated on Mon, 2009-11-30 00:58 by luoxf. Originally created by dongx on 2009-09-28 18:14.Reference
Speaker : Xiaofeng Luo ( LBNL/USTC )
Talk time : 11:40, Duration : 00:20
FHC cosmic ray test
Updated on Tue, 2009-10-06 22:01 by xuanli. Originally created by dongx on 2009-09-28 18:11.Reference
Speaker : Xuan Li ( Shandong Univ. )
Talk time : 10:10, Duration : 00:20
STAR Management Meeting
EVO: Title: STAR Management Meeting // Community: STAR // Password: star // Phone Bridge: +1 626 395 2112 (CA) / +1 631 344 6100 (NY) // ID: 1269411 // Password: 0952, at 15:00 (GMT), duration : 01:00
Time: 11 AM - 12 PM EDT
* --===================================================================--*
Agenda:
1) STAR Collaboration preparation - Bedanga
2) Run10 shift and QA board - Olga
* --====================================================================--*
Brief Summary:
0) Attendency:
1)
Notes:
1) STAR TPC Review (key= star2009), June 4,5, BNL. Ron Settler (chair). Review report.
2) NPE Committee, H. Huang (chair)
3) STAR TOF Close Out Review, Aug. 10-11. Review report and The Plan.
4) STAR FMS Review agenda, Sept. 1-2, BNL, P. Jacobs (chair). Review report
Future Meetings:
1) SQM2009: Sept. 27-Oct. 2, Buzios, Brazil
2) STAR Collaboration meeting, Oct. 5-10, Berkeley
3) DNP 2009, Oct. 13 - 17, Waikoloa
4) STAR-DoE HFT CD-1 review, postpond to Nov., BNL
5) APS April meeting, Feb. 13-17, 2010, Washongton DC. (abstract deadline: Oct. 23, 2009)