STAR Protected
Discussion
Updated on Tue, 2010-03-09 08:38. Originally created by dunlop on 2010-03-08 15:14.Time | Talk | Presenter |
---|---|---|
10:00 | Overview of eRHIC and MeRHIC proposal Status ( 00:30 ) 1 file | T. Ullrich |
10:30 | Overview of key polarized ep measurements and detector needs: ( 00:30 ) 1 file | E. Sichtermann |
11:00 | Key measurements in eA at an eSTAR ( 00:30 ) 1 file | T. Ullrich |
11:30 | Detector concepts for MeRHIC and implications for eSTAR ( 00:30 ) 1 file | M. Lamont |
12:00 | Some thoughts on detector requirements ( 00:30 ) 1 file | B. Surrow |
12:30 | Kinematics and implications for physics reach ( 00:30 ) 2 files | J. Dunlop |
14:00 | New calorimetric technology for eRHIC ( 00:30 ) 2 files | O. Tsai |
14:30 | From pp2pp to diffractive measurement in eSTAR ( 00:30 ) 1 file | J.H. Lee |
15:00 | FL and the statistics/rates needed to make the measurement ( 00:30 ) 1 file | R. Debbe |
STAR Decadal Plan Discussion I: eRHIC, meRHIC
Updated on Wed, 2010-03-10 08:00 by jeromel. Originally created by dunlop on 2010-03-08 15:13. 2010-03-09 10:00
2010-03-09 17:00
America/New York
from Tuesday, 9 March 2010 to Tuesday, 9 March 2010
3-192
3-192
Conference organizing committee information :
Nu Xu, Carl Gagliardi
Conference duration: 1 day
Discussion of STAR in the time of meRHIC and eRHIC
»
Run6T FPD Efficiency Corrections
Run6T FPD Efficiency Corrections - Under Construction!
Run6T FPD Energy Scale Correction Update
Run6T FPD Energy Scale Correction Update
TPC Sector Alignment QA
The TPC sector alignment (SA) 2009 calibration was performed using low luminosity data, which reduces distortions from pile-up tracks and space charge accumulation.
Paper proposal - W Asymmetry PRL paper - Run 9
Title: Measurement of the parity violating longitudinal single-spin asymmetry for $W^{\pm}$&nbs
Documentation- storage and control
Reference
Talk time : 14:00, Duration : 00:30
Adept, web server, control documents
Overflow if need be
Reference
Talk time : 10:30, Duration : 00:30
HFT management
Reference
Talk time : 09:00, Duration : 01:30
HFT bi-monthly- day 2
2010-03-11
America/New York
Thursday, 11 March 2010
2-84 BNL, at 14:00 (GMT), duration : 00:00
2-84 BNL, at 14:00 (GMT), duration : 00:00
Time | Talk | Presenter |
---|---|---|
09:00 | HFT management ( 01:30 ) 1 file | |
10:30 | Overflow if need be ( 00:30 ) 2 files | |
11:00 | Integration - interface specifications ( 01:00 ) 4 files | |
13:30 | Grounding plans ( 00:30 ) 0 files | |
14:00 | Documentation- storage and control ( 00:30 ) 4 files | |
14:30 | preparation for TDR, WBS and near term plans ( 00:30 ) 0 files |
D.Beavis
Reference
Speaker : Beampipe - Safety ( BNL )
Talk time : 15:20, Duration : 00:30
BREAK
Reference
Talk time : 15:00, Duration : 00:20
IDS and integration
Reference
Speaker : E.Anderssen ( LBNL )
Talk time : 14:30, Duration : 00:30
SSD upgrade
Reference
Speaker : M.LeVine ( BNL )
Talk time : 13:45, Duration : 00:45
LUNCH
Reference
Talk time : 12:15, Duration : 01:30
IST status
Reference
Speaker : Gerrit J. van Nieuwenhuizen II ( MIT )
Talk time : 11:30, Duration : 00:45