STAR Protected

2010-03-11

Meeting 11 March 2010

Simulation
--------------------

Will: One of last things on list was timestamps.  He can try to generate some.

High pT Workshop Talk

HighpT conference presentation

 see .pdf file

STAR Management Meeting

2010-03-11 11:00
2010-03-11 12:00
America/New York
Thursday, 11 March 2010
BNL, 50-I-189, at 16:00 (GMT), duration : 01:00

EVO: Title: STAR Management Meeting // Community:  STAR // Password:  star

           Phone Bridge: +1 626 395 2112 (CA) / +1 631 344 6100 (NY) // ID: 39499 // Password: 0952

   Time:  11 AM - 12 PM EDT

 *--===================================================================--*

I. Agenda:

1) Run10 status - Bill

2) FMS and Relted Issues - Nu

3) Coll. Mtg Preparation - Jamie

4) BUR11 (BES II, U+U, 500GeV pp) - Nu

*--===================================================================--*

II. Brief Summary and/or Action Items:

            0) Attendency

 

III. Note:

► RHIC Planning Meeting Website

Charge for New Decadal Plan, Steve Vigdor, Dec. 17, 2009

► STAR NPE Committee, H. Huang (chair), April 2008

► STAR FMS Review: Sept. 1-2, BNL. P. Jacobs (chair). Review Report

*--===================================================================--*

IV. Future Meetings and Reviews:

APS April Meeting: Feb. 13-17, 2010, Washongton DC

STAR Collaboration Meeting: March 26 - 31, 2010, BNL. Chair: J. Dunlop

RHIC and AGS User's Annual Meeting: June 7-11, 2010, BNL

► STAR Analysis Meeting: June 15-18, 2010, UCLA. Chair: H. Huang

► RHIC PAC Meeting: June 21-23, 2010, BNL

► RHIC Science and Technology Review: June 28-30, 2010, BNL

Spin2010: Sept. 27 - Oct. 2, 2010, Juelich, Germany

DNP2010: Nov. 3-6, 2010, Santa Fe, NM

Analysis Tasks

Speaker : Wlodek


Talk time : 14:00, Duration : 00:20

Minutes HF meeting 9/March/2010

2010/03/09 Meeting Minutes 

8:2010/3/MARCH Updated HF priority list

9.MARCH. 2010

J/Psi pp2006 request switched with J/Psi AuAu2007 and moved to highest priority.

Embedding Instructions

All QA is stored on RCF: afs/rhic.bnl.gov/star/doc_protected/www/embedding

DRUPAL page to monitor timing for embedding:

http://drupal.star.bnl.gov/starsimstats/

STAR EIC Meeting - Talk on Detector Requirements

INPC 2010 abstract

 .pdf file attached

BHT_coin stability vs JP1

 Below are two plots showing the ratio of JP1 events to BHT3_coin events per run (the horizontal axis is run number, zero suppressed and with gaps removed).

FL and the statistics/rates needed to make the measurement

Speaker : R. Debbe


Talk time : 15:00, Duration : 00:30

From pp2pp to diffractive measurement in eSTAR

Speaker : J.H. Lee


Talk time : 14:30, Duration : 00:30

New calorimetric technology for eRHIC

Speaker : O. Tsai


Talk time : 14:00, Duration : 00:30

Kinematics and implications for physics reach

Speaker : J. Dunlop


Talk time : 12:30, Duration : 00:30

Some thoughts on detector requirements

Speaker : B. Surrow


Talk time : 12:00, Duration : 00:30

Detector concepts for MeRHIC and implications for eSTAR

Speaker : M. Lamont


Talk time : 11:30, Duration : 00:30

Key measurements in eA at an eSTAR

Speaker : T. Ullrich


Talk time : 11:00, Duration : 00:30

Overview of key polarized ep measurements and detector needs:

Speaker : E. Sichtermann


Talk time : 10:30, Duration : 00:30

Overview of eRHIC and MeRHIC proposal Status

Speaker : T. Ullrich


Talk time : 10:00, Duration : 00:30