STAR Protected
Tracking distributions for L2W data and W MC samples
Tracking distributions for L2W data and W MC samples
Detector studies 4
As in pp run number 9070006 data event display plots, there's hot tower issue.
STAR Management Meeting
BNL, 50-I-189, at 15:00 (GMT), duration : 01:00
EVO: Title: STAR Management Meeting // Community: STAR // Password: star
Phone Bridge: +1 626 395 2112 (CA) / +1 631 344 6100 (NY) // ID: 39499 // Password: 0952
Time: 11 AM - 12 PM EDT
*--===================================================================--*
I. Agenda:
1) Run10 status - Bill
2) Trigger status for 62 GeV collisions - Zhangbu
3) FMS issues - Nu
4) Nu's talk at the collaboration meeting: (i) at the Collaboration, pdf file (ii) at the Council meeting pdf file
*--===================================================================--*
II. Brief Summary and/or Action Items:
0) Attendency: Bill, Zhangbu, Jamie, Jerome, Flemming, Bedanga, Nu
III. Note:
► RHIC Planning Meeting Website
► Charge for New Decadal Plan, Steve Vigdor, Dec. 17, 2009
► STAR NPE Committee, H. Huang (chair), April 2008
► STAR FMS Review: Sept. 1-2, BNL. P. Jacobs (chair). Review Report
*--===================================================================--*
IV. Future Meetings and Reviews:
► STAR Collaboration Meeting: March 26 - 31, 2010, BNL. Chair: J. Dunlop
► RHIC and AGS User's Annual Meeting: June 7-11, 2010, BNL
► STAR Analysis Meeting: June 15-18, 2010, UCLA. Chair: H. Huang
► RHIC PAC Meeting: June 21-23, 2010, BNL
► RHIC Science and Technology Review: June 28-30, 2010, BNL
► Spin2010: Sept. 27 - Oct. 2, 2010, Juelich, Germany
► DNP2010: Nov. 3-6, 2010, Santa Fe, NM
BSMD Calibration Update 3/23 (Further updated, see below)
The big question for the calibration right now is whether or not to use the mean to characterize each p slice, and if not, what to use instead. Closely related to this question is the questio
Radial OmegaTau (OmegaTauR) Calibration
Using lasers on the west end of the TPC, where there is no shorted ring, we have introduced distortions in the electric field by two methods: 1) adding extra resistance to the IFC resistor chain, a
Azimuthal (r*phi) OmegaTau Tensor Component Calibration
Using lasers on the west end of the TPC, where there is no shorted ring, we have introduced distortions in the electric field by two methods: 1) adding extra resistance to the IFC resistor chain, a
2009 200 GeV SpinDb (full MuDst)
Run list for spinDb deterimination in ~rfatemi/forTJ/FinishedRuns2009 goes from 10111030 - 10180034
Files located at /star/intitutions/uky/rfatemi/2009Bxing/
Detector study 3
I put the event display which shows the energy deposited in the EEMC tower to project on the EEMC SMD strips.
Condor installation on online Linux pool
Preparation questions for Condor installation:
1. What machine will be the central manager?
Dijet Filter Performance
I created a dijet Filter using the StMCFilter framework. The filter classifies events into 3 categories: signal, could reconstruct as signal, background.
Speeding up DB access using SSD or Memory
This blog will contain a collection of information on IO tests for speeeding up database access using SSD drives or Ram based disk. A few background information will be provided.
HFTrequirements
BNL , at 13:00 (GMT), duration : 00:00
The morning session is in room 2-78 for 9-1 and 2-95 from 1-5
The requirements meeting for the inner structures of the HFT/IST is scheduled for March 24 a Brookhaven, the day before the
FGT meeting also at BNL. The main point of the meeting is to work on the requirements, and move towards a final document that describes
requirements for the Cone structures, services etc.I enclose here the suggestions from Eric what this meeting should entail.
As you can see it is primarily a working meeting geared towards a specific outcome.
Pre-meeting documents (pulled out from e-mail information). Docs may be added to page later.
Electric:
PXL:
(LGR)
1. preliminary connectivity documentation.
preliminary examples/templates can be found at:
http://rnc.lbl.gov/hft/hardware/docs/PXL_connectivity_description_nc_v1.2.pdf
http://rnc.lbl.gov/hft/hardware/docs/PXL_connectivity_prototype.xls
2. Preliminary grounding documentation.
This should include the grounding plan for the subsystem including a
signal, power, power return and ground paths.
IST (Gerrit)
Overview diagram of IST grounding
SSD, (H.Matis)
See the attached file Cable_Plant_V5.pdf
FGT:
http://www.iucf.indiana.edu/~gvisser/star/fgt/STAR_FGT_Electrical_Connections_and_Grounding_Scheme (.docx)
http://www.iucf.indiana.edu/~gvisser/star/fgt/STAR_FGT_Electrical_Connections_and_Grounding_Scheme (pdf)
Mechanical:
IDS
requirements spreadsheet http://web.mit.edu/jason_b/Public/STAR/STAR_IDS_Interfaces_FGT.xls (Jason B.)
EVO information
Description: requirements meeting
Community: STAR
Password: STAR_HFT
Meeting Access Information:
- Meeting URL
http://evo.caltech.edu/evoGate/koala.jnlp?meeting=MaMDMt222nDaDu9e9sDI9a
- Password: STAR_HFT
- Phone Bridge
ID: 1736375
Password: 6311
Eastern Daylight Time (-0400)
Start 2010-03-24 08:30
End 2010-03-24 17:30
- USA (BNL, Upton, NY)
+1 631 344 6100
Time | Talk | Presenter |
---|---|---|
09:00 | Discussion on mechanics ( 01:30 ) 0 files | |
10:30 | Disscussion on Electrical Specs ( 01:30 ) 11 files |