STAR Protected

FST group meeting

2020-02-03 09:00
America/New York
Monday, 3 February 2020
remote meeting, at 14:00 (GMT), duration : 00:00
 
TimeTalkPresenter
09:00Mechanical structure ( 00:20 ) 1 fileYi Yang/Han-Sheng Li
09:20Tracking Studies ( 00:20 ) 0 filesKrishan Gopalishan Gopal, Daniel Brandenburg
09:40Prototype module in STAR in Run20 ( 00:20 ) 1 fileall

FST group meeting

2020-02-10 09:00
America/New York
Monday, 10 February 2020
remote meeting, at 14:00 (GMT), duration : 00:00
TimeTalkPresenter
09:00Mechanical structure ( 00:20 ) 0 filesYi Yang/Han-Sheng Li
09:40Module Assembly at Fermilab ( 00:20 ) 2 filesZhenyu Ye

FST group meeting

2020-01-20 09:00
America/New York
Monday, 20 January 2020
https://bluejeans.com/101020434 , at 14:00 (GMT), duration : 00:00
 
TimeTalkPresenter
09:00UIC test stand ( 00:20 ) 1 fileXu Sun, Andres Aguilar

FST group meeting

2020-01-13 09:30
America/New York
Monday, 13 January 2020
remote meeting, at 14:30 (GMT), duration : 00:00
 weekly FST meeting.
Usual agenda includes status from each sub activity
- mechanical
- silicon
- readout system
- simulations, including geometry

For Monday discusion
a) in beam testing for this run?
    -- Please see attached document that was circulated early last week.
    -- discuss pros and cons.
b) requirements document


Phone Dial-in
+1.408.740.7256 (US (San Jose))
+1.408.317.9253 (US (Primary, San Jose))
(Global Numbers)



Room System
199.48.152.152 or bjn.vc

Meeting ID: 578 618 187
Moderator Passcode: 6253 (should not be needed)

Update [01.09.2020] -- Unfolding Run 9 pp Data Using Response Matrices Made With Different DCA Cuts

Following up on the previous post:

matching ratio

The matching ratios are averaged over all runs in one day. Before day 353 in some of the runs eTOF was not included, so the ratio is lower.

time resolution

inverse beta vs momentum

global hit position

eTOF run-by-run QA

Run-by-run QA for Run20

STAR endcap TOF/CBM TOF meeting

2020-01-30 10:15
2020-01-30 12:15
America/New York
Thursday, 30 January 2020
The meeting is scheduled on Bluejeans: https://bluejeans.com/303776107, at 15:15 (GMT), duration : 02:00

STAR endcap TOF/CBM TOF meeting

2020-01-16 10:15
2020-01-16 12:15
America/New York
Thursday, 16 January 2020
The meeting is scheduled on Bluejeans: https://bluejeans.com/303776107, at 15:15 (GMT), duration : 02:00
TimeTalkPresenter
10:15Efficiency in FXT ( 00:20 ) 1 filePhilipp Weidenkaff

STAR endcap TOF/CBM TOF meeting

2020-01-23 10:15
2020-01-23 12:15
America/New York
Thursday, 23 January 2020
The meeting is scheduled on Bluejeans: https://bluejeans.com/303776107, at 15:15 (GMT), duration : 02:00

STAR endcap TOF/CBM TOF meeting

2020-01-09 10:15
2020-01-09 12:15
America/New York
Thursday, 9 January 2020
The meeting is scheduled on Bluejeans: https://bluejeans.com/303776107, at 15:15 (GMT), duration : 02:00
TimeTalkPresenter
10:15Fixed Target matching ratio ( 00:20 ) 1 filePhilipp Weidenkaff

STAR endcap TOF/CBM TOF meeting

2020-01-02 10:15
2020-01-02 12:15
America/New York
Thursday, 2 January 2020
The meeting is scheduled on Bluejeans: https://bluejeans.com/303776107, at 15:15 (GMT), duration : 02:00

Run12 p+p jet mass measurement paper page

Title:
First measurements of the invariant jet mass in p+p collisions at \sqrt{s} = 200 GeV at STAR

Abstract:

Update [01.02.2020] -- Track Pt in Run 9 pp Data and Embedding

Following up on the previous post:

STAR HF jets

 

aps abstract

 

Update [12.29.2019] -- Event Pt in Run 9 pp Data and Embedding

We've been trying to assess how big of an effect feed-down from secondary vertices have on our analysis.  Some of our previous efforts can be found here: