STAR Protected

GPC Paper Review - pp Elastic Scattering at 510 GeV

  Measurement of Elastic Cross Section in Proton--Proton Collisions at $\sqrt{s} = 510$~GeV with the STAR Detector at RHIC

October 27

  • RAW to MuDst production
    • pp500_production_2017 (physics)
      375471 files have been converted out of 654286
      Around 58% Completion

Guidances for STAR presentations

 This blog documents guidances, including requirements and suggesti

TPC weekly

2020-11-18 15:00
America/New York
Wednesday, 18 November 2020
remote only, at 20:00 (GMT), duration : 00:00
The Bluejean connection
Title:  STAR TPC Weekly
Description: Weekly TPC meeting for the STAR Collaboration
Community: STAR


agenda:
- hardware 
  hardware progress
- software
 update on 3He effeciency; Yue Hang
https://drupal.star.bnl.gov/STAR/system/files/he34embedding3rdnew_1.pdf

minutes

TPC meeting Nov 18, 2020

 

-hardware

 Alexei and Nicolai another test round on adding SF4 to P10 at outer sector in clean room. Had to use +65V to get same gain as P10. Still some issues if this is ok. And will do another set of measurements in 2 weeks or so

Also working to get laser system back into shape.

Tim is installing gating grid drivers. Flemming confirmed that David is involved in get the SC for GG up and running. We should contact him for progress.

 

-software

Presentation by Yue on further check on the 3He, 4He efficiency and issues.

Presentation is linked on meeting web page.

Presented nicely where the consequences show us where there are differences splittracks, 3He vs. protons. There is still no understanding how the change in pedestal should affects stuff.

 

Discussion on run-19 alignment. Irakli has done a bit more work; he and Yuri are having discussion. Yuri shows some preliminary work documenting the different mass splitting depending on library version and corrections applied.

 

No meeting on Wed 25 just before thanksgiving.

 

Xin would like to have an updated report at next S&C meeting (not 25 either)




Phone Dial-in
+1.408.740.7256 (US (San Jose))
+1.888.240.2560 (US Toll Free)
+1.408.317.9253 (US (Primary, San Jose))

Meeting ID: 628 045 566

Direct link: https://bnl.bluejeans.com/628045566

TPC weekly

2020-11-11 15:00
America/New York
Wednesday, 11 November 2020
remote only, at 20:00 (GMT), duration : 00:00

TPC weekly

2020-11-04 15:00
America/New York
Wednesday, 4 November 2020
remote only, at 20:00 (GMT), duration : 00:00
Hardware repairs (Tonko, Scheetz)
Power cables should be crimped (100' and pigtails) as many are bad. El group looking for help
Gating Grid Drivers will be replacd Tim has to maake nesc fixes, should be installed in about 2 weeks
Repairs of RDO and FEE continuing

AL working on optical parts for laser, installing NMR for Mag field calibration, looking at response with outer sector in clean room
added SF4 gas. Nicolai wll come to BNL again next week?


Preliminary report from Yuri on  difference between online and offline cluster 
https://drupal.star.bnl.gov/STAR/system/files/FCF_online_offline.pdf


3He effeciency  https://drupal.star.bnl.gov/STAR/system/files/he34embedding.pdf




TPC weekly

2020-10-28 15:00
America/New York
Wednesday, 28 October 2020
remote only, at 19:00 (GMT), duration : 00:00
The Bluejean connection
Title:  STAR TPC Weekly
Description: Weekly TPC meeting for the STAR Collaboration
Community: STAR

Phone Dial-in
+1.408.740.7256 (US (San Jose))
+1.888.240.2560 (US Toll Free)
+1.408.317.9253 (US (Primary, San Jose))

Meeting ID: 628 045 566

Direct link: https://bnl.bluejeans.com/628045566

TPC weekly

2020-10-21 15:00
America/New York
Wednesday, 21 October 2020
remote only, at 19:00 (GMT), duration : 00:00
 The Bluejean connection

Title:  STAR TPC Weekly
Description: Weekly TPC meeting for the STAR Collaboration
Community: STAR

Phone Dial-in
+1.408.740.7256 (US (San Jose))
+1.888.240.2560 (US Toll Free)
+1.408.317.9253 (US (Primary, San Jose))

Meeting ID: 628 045 566

Direct link: https://bnl.bluejeans.com/628045566 
TimeTalkPresenter
15:00Run-19 Alignment Mistery ( 00:20 ) 0 filesIrakli

October 20

  • RAW to MuDst production
    • pp500_production_2017 (physics)
      325989 files have been converted out of 654286
      Around 55% Completion

DNP preliminary plots - isobar Rcp and pt spectra

 

TPC group meetings 2020-

Provide minutes or link to minutes of meetings held.




October 13

  • RAW to MuDst production
    • pp500_production_2017 (physics)
      325989 files have been converted out of 654286

Hard Probes 2020 Preliminary Plots; Underlying Event

 

Cold QCD/ Spin PWG Meeting

2020-10-21 19:00
America/New York
Wednesday, 21 October 2020
https://drupal.star.bnl.gov/STAR/pwg/spin/weekly-pwg-meetings, at 23:00 (GMT), duration : 00:00

Cold QCD/ Spin PWG Meeting

2020-10-14 19:00
America/New York
Wednesday, 14 October 2020
https://drupal.star.bnl.gov/STAR/pwg/spin/weekly-pwg-meetings, at 23:00 (GMT), duration : 00:00

Cold QCD/ Spin PWG Meeting

2020-10-07 19:00
America/New York
Wednesday, 7 October 2020
https://drupal.star.bnl.gov/STAR/pwg/spin/weekly-pwg-meetings, at 23:00 (GMT), duration : 00:00

Run14 Au+Au and Run12 pp: differential jet shape measurement vs EP - Paper Page

Title:
Jet shape measurement with respect to the event plane in \sNN = 200 GeV Au+Au collisions in STAR

Abstract:

Run14 Au+Au: jet-hadron correlations relative to the event plane - Paper Page

Title:
Jet-hadron correlations with respect to the event plane in \sNN = 200 GeV Au+Au collisions in STAR

Abstract:

October 6

  • RAW to MuDst production
    • pp500_production_2017 (physics)
      306645 files have been converted out of 654286

October