STAR Protected

UPC J/psi in dAu 200 GeV paper proposal

Title:
Probing the gluonic structure in Deuteron using d+Au ultra-peripheral collisions

PAs: 

TPC weekly

2021-01-13 15:00
America/New York
Wednesday, 13 January 2021
virtual , at 20:00 (GMT), duration : 00:00
 Weekly meeting
- agenda

Hardware status
Readiness and startup for Run2021 
Software update


MinutesTPC meeting January 13, 2021

 

Hardware status:

 

HV systems ok. GG drivers fixed/swapped modules and the noisy channels reported earlier is gone. Laser ok.  Will work on gas systems, ongoing plan to have Ar flowing by next mid-week, getting blue sheet by Mon 25.

Methan gas flow starting with shifts on Tuesday 26 at 8 am.

 

Alexei mentioned Jeff had asked for some positions of laser – will forward e-mail to Yuri.

 

Gene has requested sets of run with GMT trigger that was created for run20, but where commissioning was not complete. A software (trigger code had a flaw, but is now fixed).

The MTD will be available for the startup phase, and for possible other physics runs like O+O should they happen.

 

Yuri brought up that it will be very useful to have about 3 days of FF cosmics. He was requested to come with a specific goal for tracks/triggers that we can forward to ops group.

Q: When did we last have FF cosmic data?

 

Gene reminded us that DB should be initialized for this run. Will ask Irakli if he had scripts from last year to do this and get hold of them.

 

Flemming mentioned that Star ops mgt and star mgt will like to have a review for TPC focused on calibrations and tracking. As Gene pointed out this has not been done in about a decade. It will be an internal STAR committee chaired by Zhangbu.

 

Yuri informed us that there was an error in his calculations (code, not formulae) and that the

Results presented last week on asymmetric corrections are wrong. They are symmetric in East/West, Thus the issues on the alignments and calibrations still stands as un-resolved.

 

Gene has started a study of looking at residuals in low-luminosity 19.6 Gev runs and see a split between inner and outer. Seems related to padrow40 correction i.e static distortion due to the gridleak wall. Gene will present results at a later stage of the study.

 

 



zoom info
Flemming Videbaek is inviting you to a scheduled ZoomGov meeting.
 
Topic: TPC weekly
Time: Jan 13, 2021 03:00 PM Eastern Time (US and Canada)
 
Join ZoomGov Meeting
https://bnl.zoomgov.com/j/16131885652?pwd=TjQ1eTMwN085NXNtdnhOZEZhRk1SQT09
 
Meeting ID: 161 3188 5652
Passcode: 743219
One tap mobile
+16692545252,,16131885652#,,,,,,0#,,743219# US (San Jose)
+16468287666,,16131885652#,,,,,,0#,,743219# US (New York)
 
Dial by your location
        +1 669 254 5252 US (San Jose)
        +1 646 828 7666 US (New York)
        +1 551 285 1373 US
        +1 669 216 1590 US (San Jose)
Meeting ID: 161 3188 5652
Passcode: 743219
Find your local number: https://bnl.zoomgov.com/u/abeN7YSxFu
 
Join by SIP
16131885652@sip.zoomgov.com
 
Join by H.323
161.199.138.10 (US West)
161.199.136.10 (US East)
Meeting ID: 161 3188 5652
Passcode: 743219
 
 

January 12

  • RAW to MuDst production
    • pp500_production_2017 (physics)
      392608 files have been converted out of 654286
      Around 60% Completion

SpaceCharge EastWest Symmetry

This is meant to provide a simple document for understanding through basic principles of electromagnetism how the TPC SpaceCharge distortion is symmetric on the east and west sides of the TPC.

TPC QA 2021

This blog is intended to maintain a log of issues that will be identified as the
run progresses. For initial start the process will be as for run20 and 19. See earlier QA blog page

K* Rho00 results comparison 200 GeV Run-11

 We will compare the K* analysis step by step:

Our codes at:

/gpfs01/star/pwg/subhash/Public/Kstar_Comparison

January 5

  • RAW to MuDst production
    • pp500_production_2017 (physics)
      392608 files have been converted out of 654286
      Around 60% Completion

January

 

2021

 

TPC weekly

2021-01-06 15:00
America/New York
Wednesday, 6 January 2021
virtual , at 20:00 (GMT), duration : 00:00
 agenda
-- hardware
-- software



 
 
Topic: TPC weekly
Time: Jan 6, 2021 03:00 PM Eastern Time (US and Canada)
 
Join ZoomGov Meeting
https://bnl.zoomgov.com/j/16131885652?pwd=TjQ1eTMwN085NXNtdnhOZEZhRk1SQT09
 
Meeting ID: 161 3188 5652
Passcode: 743219
One tap mobile
+16692545252,,16131885652#,,,,,,0#,,743219# US (San Jose)
+16468287666,,16131885652#,,,,,,0#,,743219# US (New York)
 
Dial by your location
        +1 669 254 5252 US (San Jose)
        +1 646 828 7666 US (New York)
        +1 551 285 1373 US
        +1 669 216 1590 US (San Jose)
Meeting ID: 161 3188 5652
Passcode: 743219
Find your local number: https://bnl.zoomgov.com/u/abeN7YSxFu
 
Join by SIP
16131885652@sip.zoomgov.com
 
Join by H.323
161.199.138.10 (US West)
161.199.136.10 (US East)
Meeting ID: 161 3188 5652
Passcode: 743219
 
 
TimeTalkPresenter
15:00TPC Distortions (progress report) ( 00:20 ) 1 fileYuri Fisyak
15:20Alignment Update ( 00:20 ) 1 fileIrakli

2020

Meetings 2020

Bluejeans "STAR cold QCD / spin PWG meeting"

December 29

  • RAW to MuDst production
    • pp500_production_2017 (physics)
      391054 files have been converted out of 654286
      Around 60% Completion

December 22

  • RAW to MuDst production
    • pp500_production_2017 (physics)
      389582 files have been converted out of 654286
      Around 60% Completion

FST QC meeting

2020-12-23 09:00
America/New York
Wednesday, 23 December 2020
virtual , at 14:00 (GMT), duration : 00:00
 

Internal review of QC process and current status

 

Recommendation from review

 

An internal review of the procedures and implementation of the QC plans and documentation should be performed after the first 10% of the production is complete before further expensive and sparse parts (sensors and asics!) are committed.

 

The brief review should present

 

1)     Demonstrate implementation of e-log

Take 2 cases

a)     One of the prototype that was populated and tested (03,/04) Try to grade it with the current requirements as we know they were successfully populated and running

 

b)  Take of the currently produced modules that were send to UIC (9-12) and show the grading

 

2)     Present a summary of grading for the 09- now modules for each of the sub-grading quantities  (outer, inner, different fastnesses, DR). Explain how the weighted grading is done.

 

3)     Present  what went wrong with the rejected ones (overflow glue,..) and what that implies for further production

 

Charge to review:

 

Is the QC documentation sufficient?

Does the QC documentation in the assembly document (V3) reflect what is done now?

Should the summary contain some of the sub grading?

Is there a need for any change in procedures, or QC measures?

 

.

 

 



 
 
Topic: FST - QC meeting
Time: Dec 23, 2020 09:00 AM Eastern Time (US and Canada)
 
Join ZoomGov Meeting
https://bnl.zoomgov.com/j/16131885652?pwd=TjQ1eTMwN085NXNtdnhOZEZhRk1SQT09
 
Meeting ID: 161 3188 5652
Passcode: 743219
One tap mobile
+16692545252,,16131885652#,,,,,,0#,,743219# US (San Jose)
+16468287666,,16131885652#,,,,,,0#,,743219# US (New York)
 
Dial by your location
        +1 669 254 5252 US (San Jose)
        +1 646 828 7666 US (New York)
Meeting ID: 161 3188 5652
Passcode: 743219
Find your local number: https://bnl.zoomgov.com/u/abeN7YSxFu
 
Join by SIP
16131885652@sip.zoomgov.com
 
Join by H.323
161.199.138.10 (US West)
161.199.136.10 (US East)
Meeting ID: 161 3188 5652
Passcode: 743219
 
 

Published Paper Material

 

Journal Review

 Here is the material form the PLB review 

1. Nov. 7 replies and draft changes

Replies to Collaboration Review Comments

 

GPC Review

 Below are two presentation to the GPC.

Paper Draft

Short description of changes
  1. In V1 Fig. 6 was added
  2. In V2 Fig. 6 and 7 reduced in size 

Analysis Note

Added section on z-vertex efficiency in V1

In V3 updated tables in the Appendix, also Fig. 21 updated.