STAR Protected
Online to HPSS Network topology test
Networking upgraded the network reinforcing the online to offline (HPSS) path with a layer 3 structure made of Arista's switches.
Minutes for HF PWG meeting on 2014/7/10
1. We discussed the HF priorities for the data production before QM 2015.
minutes for HF PWG meeting 07/17/14
1) Breif discussion for the data production priorities for QM15, encourage people to put in more suggestions or comments to the HF list.
2012 EEMC Pion Longitudinal Asymmetry (Statistical Projection)
Here, I estimate the statistical uncertainties for a 2012 510 GeV inclusive π0 ALL measurement. For this estimate I have selected the following triggers:
TPC Calibration Run 12 UU with st_centralpro (pass 1): bbcx+bbcbb
The TPC calibration was done (using the current 2014 Calib_SC_GL.C macro) on Run12 UU using first just the st_centralpro stream, and then the st_centralpro + st_physics steream.
STAR Management Meeting
2014-07-17 10:50
2014-07-17 13:00
America/New York
Thursday, 17 July 2014
SeeVogh ID: 100 4432 (BNL RM#1-189), at 14:50 (GMT), duration : 02:10
SeeVogh ID: 100 4432 (BNL RM#1-189), at 14:50 (GMT), duration : 02:10
1) FMS pre-shower status and plan (Oleg Eyster)
2) HFT pre-CD4 review planning status (Flemming)
https://drupal.star.bnl.gov/STAR/future/proposals/hft-project/opa-review-july-31-2014
3) collaboration related meetings
October 2-3 upgrade workshop (UIC)
November 3-7 collaboration meeting (BNL or UC Davis or?)
4) stories:
W paper, run14
5) other items
EEMC Cal-07-16-2014
SMD strip cut: thrMipSmdE=0.4/1000, emptyStripCount=10, offCenter=0.8
Tower cuts: RelTwEne>0.5 && RelTwEne<2
2013 W embedding update
I. Period one - (before HFT intallation)
The embedding request page