STAR Protected
Instruction for HFT simulation
This instruction is a guidance of HFT simulation using STAR Geant and software.
Sti Geometry Check with SL14g - July 23, 2014
I tested the Sti HFT geometry again the SL14g library done on July 22, 2014. Please see the results below. Please refer to the earlier posts for preceeding studies.
Samhain and Beltane notes
Several configuration options to consider right away, some coming with costs...
--enable-suidcheck :
STAR Management Meeting
SeeVogh ID: 100 4432 (BNL RM#1-189), at 14:50 (GMT), duration : 02:10
1) Roman Pot Upgrade status report (Wlodek)
https://drupal.star.bnl.gov/STAR/blog/videbaks/progress-reports-run-15-upgrades
2) discussions/responses to ALD's requests
3) production/topic priority from PWGC
4) upgrade and collaboration meetings
Upgrade workshop October 2-3, Chicago
Collaboration meeting, November 3-8, BNL
5) new collaboration institutions, requests
https://drupal.star.bnl.gov/STAR/system/files/Info_to_join_STAR_letter_Yi_Yang.docx
6) Other items
Thanks!
Zhangbu
Run 12 UU GridLeak vs. Sector
EEMC Cal-07-23-2014
Recalibrate the SMD gains, compare to the final SMD gains get from database:
HFT dry run
2-219, at 17:00 (GMT), duration : 00:00
Thursday and Friday Connection will be by phone bridge
Tlaks will not nesc be given in order
Time | Talk | Presenter |
---|---|---|
12:00 | HFT status and overview ( 00:20 ) 2 files | F.Videbæk |
12:20 | Cost and Schedule ( 00:20 ) 2 files | Sarah Morgan |
12:40 | PXL status, requirements and deliverables ( 00:20 ) 3 files | Leo Greiner |
13:00 | IST status, requirements and deliverables ( 00:20 ) 2 files | Zhenyu Ye |
13:20 | SSD status requirements and deliverables ( 00:20 ) 2 files | J.Thomas |
13:40 | Transition to ops, lessons leraned and Contingency expenditure ( 00:20 ) 1 file | F.Videbaek + all |
14:00 | Project Closeout report ( 00:20 ) 1 file |
2013 - Barrel Noise Investigation
Testing/Setting up the Macro
Run - 13072016
MuDst file - st_physics_13072016_raw_5020004.MuDst.root
Underlying Event For Run 9 pp500
The Run 6 pp 200 GeV Underlying Event Anaylsis can be found at the following:
https://drupal.star.bnl.gov/STAR/files/APS_WEBB_UE_0.pdf
PWGC Meeting
, at 15:00 (GMT), duration : 01:30
1) BUR 15/16: final PAC report was released two weeks ago and can be found at the following link
---- SeeVogh details ----
Description: PWGC conveners' weekly meeting
Community: STAR
Password: starpwgc
Meeting type: Open Meeting (Round Table)
Meeting Access Information:
- Meeting URL
SeeVogh R.N.
http://research.seevogh.com/join?meeting=3D3D3D3D3DMaMDMt222uDvD89D9iDI9a
EVO International
http://evo.caltech.edu/evoNext/koala.jnlp?meeting=3D3D3D3D3DMaMDMt222uDvD8
9D9iDI9a
- Password: starpwgc
- Phone Bridge
ID: 100 3600
Password: 8682
SeeVogh Research Network Phone Bridge Telephone Numbers:
---------------
- USA (Caltech, Pasadena, CA)
+1 626 395 2112
- USA (BNL, Upton, NY)
+1 631 344 6100
- Skype (tm) (World-wide)
evo.phone
See:
http://evo.caltech.edu/evoGate/Documentation/extclient/skype/skype.html
EEMC Cal-07-21-2014
Compare the tower gain with 2006 final tower gain from database:
Set only adc cuts on pre & postshower.
STAR-BNL local meeting on spectrum analysis (bi-weekly)
Transverse Spin Asymmetries in Run12 pp200
--------------[Relative Luminosity]----------------------------------------------------------------