IST sensor, readout, cooling

Speaker : Gerrit J van Nieuwenhuizen ( MIT )


Talk time : 10:50, Duration : 00:30

pixel mechanical and cooling

Speaker : Howard Wieman


Talk time : 10:20, Duration : 00:30

Pixel - sensor and readout

Speaker : Leo Greiner


Talk time : 09:50, Duration : 00:30

Mechanical structure

Speaker : Jason


Talk time : 09:20, Duration : 00:30

project overview

Speaker : F.Videbaek ( BNL )


Talk time : 09:00, Duration : 00:20

03 correlated, small ADC spikes in BSMD (Jan)

Under:

Study of small ADC spikes in BSMD 

Input:

AOB

Speaker : All ( All )


Talk time : 12:50, Duration : 00:10

Previous You do not have access to view this node list.

No bug of he week for now. Will resume next week.

TPC Alignement in Year7

Speaker : Hao Qiu ( IMPCAS )


Talk time : 12:35, Duration : 00:15

TPC alignement in Year9

Speaker : Na Li ( IOPP )


Talk time : 12:20, Duration : 00:15

DCA resolution in Run7 (Silicon)

Speaker : Jonathan Bouchet ( KSU )


Talk time : 12:00, Duration : 00:20

Software and Computing phone meeting

2009-05-13 12:00
2009-05-13 13:30
Etc/GMT-5
Wednesday, 13 May 2009
1-189, HighSpeed conference bridge, at 16:00 (GMT), duration : 01:30
TimeTalkPresenter
12:00DCA resolution in Run7 (Silicon) ( 00:20 ) 1 fileJonathan Bouchet (KSU)
12:20TPC alignement in Year9 ( 00:15 ) 1 fileNa Li (IOPP)
12:35TPC Alignement in Year7 ( 00:15 ) 0 filesHao Qiu (IMPCAS)
12:50AOB ( 00:10 ) 0 filesAll (All)

02 offline QA of BSMD pp 500, ver1 (Willie+Jan)

Under:

 BSMD QA algorithm and results for pp 500, tune optimized for high energy  energy response

Update on D0 Analysis(Embedded Data)-modification of dEdx cut in MuKpi

A study and modification of the dEdx cut used in the MuKpi macro+sigmaDca Analysis

BSMD status cuts and parameters

Status bit summary for BSMD status table for pp500, 2009 data (EDIT: final as of 06/08/09). 

2009.05.31 CIPANP 2009 photon-jet presentation

CIPANP 2009 presentation on photon-jet study

Title:
"Photon-jet coincidence measurements
in polarized pp collisions at sqrt{s}=200GeV

STAR Management Meeting

2009-05-14 11:00
2009-05-14 12:00
Etc/GMT-7
Thursday, 14 May 2009
BNL, 50-Orange Room, at 15:00 (GMT), duration : 01:00

EVO: Title: STAR Management Meeting // Community:  STAR // Password:  star

           Phone Bridge: +1 626 395 2112 (CA) / +1 631 344 6100 (NY) // ID: 923352 // Password: 0952

   Time:  11am - 12noon EDT

 * --===================================================================--*

  Agenda:

    1)    Run9 Status: Bill / Bernd
    2)    BUR status:  Jamie

    3)   pp2pp commissioning

    4)    AOB

* --====================================================================--*

               Brief Summary:

  1) Attending: Berdanga, Bernd, Bill, Helen, Jerome, Nu

  2) Run9 Status: FoM ~ 0.4 pb-1, long way to go to reach the target 6.5pb-1

  3) BUR 10-11:  (i) Run10: Au+Au collisions, 200 GeV (10 weeks) and BES (12 weeks at 39, 27, 17.3 11.5 7.7, 5 GeV). Spin PWG will

      provide their inputs on Spin program to Jamie by the end of the week;

      (ii) Run 11: 200 GeV logitudinally polarized p+p to finish up the Delta_g program and 200 GeV U+U commissioning.

  4) pp2pp commissioning: small progress has been made. Dr. Dima Svirida will come to BNL again for two weeks at the end of June.

      Last Tuesday, STAR has requested one week pp2pp run at the end of June.

  5) Analysis meeting at MIT: (i) Program committee: Jim (chair), Bernd, Jan, Matt (MIT), Xin (HF, Junior), Jun (LFS), Lanny (JetCorr) plus 
      Bedanga, Jamie and Nu.

      Helen will lead the topical discussion on the Ridge measurement.

  Notes:

   1) TPC Committee, Ron Settler (chair), review due June 4,5.

   2) NPE Committee, H. Huang (chair) 

  Meetings:

    1) CPOD2009: June 8-12, 2009, BNL

    2) BNL PAC: June 15-16, 2009, BNL

    3) STAR Regional meeting: June 29-30, 2009, Dubna, Russia

    4) STAR Analysis meeting, July 7-11, 2009, MIT, Boston

    5) BNL Science and Technology Review, July 22-24, BNL

    6) STAR Regional meeting: Sept. 25-26, Rio, Brazil

    7) SQM2009: Sept. 27-Oct. 2, Buzios, Brazil

    8) STAR Collaboration meeting, Oct. 5-10, Berkeley

    9) DNP 2009, Oct. 13 - 17, Waikoloa

 

2009.08.24 Test of corrected EEMC geometry

Test of corrected EEMC geometry (bug 1618)

Monte-Carlo setup:

05 May

May 2009 posts

 

TPC hits by padrow

(This entry is meant as additional input in a thread on Run 9 TPC studies/QA.)

PPV performance pp 500 GeV low luminosity 2009 - Postive Rank

Code is at:

/star/u/rjreed/PPV2009/Eval500GeV02/

compiled in stardev