Analysis of RealAuAu Data with SiliconHits and SigmaDca cuts
Updated on Sun, 2009-05-24 15:01. Originally created by jai2006 on 2009-05-18 12:19.A D0 signal is studied with cuts on SiliconHits and SigmaDca in Embedded and Real Data
MINUTES
Updated on Mon, 2009-05-18 17:01 by chajecki. Originally created by margetis on 2009-05-18 11:47.Reference
Talk time : 19:33, Duration : 00:20
NEWS from the TC meeting :
1) Tentative date for CDR draft to S. Vigdor mid-July
2) Studies of gravitational sagging and support cone of HFT
just a test
Updated on Mon, 2009-05-18 18:27. Originally created by chajecki on 2009-05-18 10:34.AuAu@19.6GeV : QA of old (P02ge) vs new (P07id) production - ref. mult.
TPC Central Membrane Tracks
Updated on Mon, 2009-05-18 10:53. Originally created by gdwebb on 2009-05-17 22:30.There have been concerns about tracks crossing the central membrane. Whether or not there were any primary tracks, which cross the CM. Also, interests about the t0 and its accuracy.
LLWI proceedings
Updated on Mon, 2009-05-18 09:49 by testadmin. Originally created by krus on 2009-05-16 14:53.Comments to SPIN PWG BUR Draft
Updated on Mon, 2009-05-18 10:54 by testadmin. Originally created by surrow on 2009-05-16 08:53.Comments to SPIN PWG BUR Draft
(Response to J. Sowinski's draft from 05/15/09)
BTOW pedestals with and without beam
Updated on Fri, 2009-06-12 12:23. Originally created by ogrebeny on 2009-05-16 02:28.Here I compare the tower pedestals measured:
1. Without beam, through slow control;
2. With beam, with L2ped algorithm in run 10135070.
RSC Meeting presentation on STAR status, May 15, 2009
Updated on Fri, 2009-05-15 11:19. Originally created by surrow on 2009-05-15 11:19.RSC Meeting presentation on STAR status, May 15, 2009
STAR Management Meeting
BNL, 50-Orange Room, at 15:00 (GMT), duration : 01:00
EVO: Title: STAR Management Meeting // Community: STAR // Password: star
Phone Bridge: +1 626 395 2112 (CA) / +1 631 344 6100 (NY) // ID: 923363 // Password: 0952
Time: 11am - 12noon EDT
* --===================================================================--*
Agenda:
1) Run9 Status: Bill / Bernd
2) BUR status: Jamie
3) MTD proposal: Nu
4) JetCorr new co-convener: Nu
* --====================================================================--*
Brief Summary:
1) Attending:
2)
Notes:
1) STAR TPC Review Committee, Ron Settler (chair), review due June 4,5.
2) NPE Committee, H. Huang (chair)
Upcoming Meetings:
1) CPOD2009: June 8-12, 2009, BNL
2) BNL PAC: June 15-16, 2009, BNL
3) STAR Regional meeting: June 29-30, 2009, Dubna, Russia
4) STAR Analysis meeting, July 7-11, 2009, MIT, Boston
5) BNL Science and Technology Review, July 22-24, BNL
6) STAR Regional meeting: Sept. 25-26, Rio, Brazil
7) SQM2009: Sept. 27-Oct. 2, Buzios, Brazil
8) STAR Collaboration meeting, Oct. 5-10, Berkeley
9) DNP 2009, Oct. 13 - 17, Waikoloa
News from the TC face-to-face meeting yesterday
Updated on Thu, 2009-05-14 19:51. Originally created by margetis on 2009-05-14 19:35.Reference
Speaker : Spiros
Talk time : 13:30, Duration : 00:20
http://drupal.star.bnl.gov/STAR/event/2009/05/14/hft-hardware-meeting-phone-conference
for a list of all talks including Software.
HFT Software
Updated on Thu, 2009-05-14 19:33. Originally created by margetis on 2009-05-14 19:33.510-4867333, at 17:30 (GMT), duration : 00:00
Agenda
Time | Talk | Presenter |
---|---|---|
13:30 | News from the TC face-to-face meeting yesterday ( 00:20 ) 1 file | Spiros |
19:33 | MINUTES ( 00:20 ) 0 files |
CNI P-Carbon Polarimeters 500GeV polarization profile rough show
CNI P-Carbon Polarimeters 500GeV Polarization Profile
Pileup in pp500 BeamLine constraint
Updated on Thu, 2009-05-14 15:51. Originally created by genevb on 2009-05-14 14:38.When attempting a Run 9: pp500 Low Luminosity Fill, I got a glimpse of how big an issue pileup was going to be.
UCM discussions 09W19
Updated on Thu, 2009-05-14 13:00. Originally created by testadmin on 2009-05-14 13:00.1-189, internal, at 18:00 (GMT), duration : 01:00
Current Status of UCM infrastructure @ STAR
Reference
Speaker : Valeri Fine ( BNL )
Talk time : 14:00, Duration : 00:20
Run10-11BURspindrafts
Use this page to hold drafts for Run 10-11 BUR written during May of 2009
Document preparations
Speaker : F.Videbaek, H.G,Ritter
Talk time : 15:00, Duration : 02:00
project management- discussion on actions and responsibilities for
Radiation Evaluation progress
Speaker : Howard Matis ( LBL )
Talk time : 13:30, Duration : 00:30
Software, progress and plans
Speaker : Spiros Margetis
Talk time : 11:50, Duration : 00:30
SSD layout, electronics, and cooling update
Speaker : Howard Matis ( LBL )
Talk time : 11:20, Duration : 00:30