Drupal upgrade, status and plan forward

Speaker : Zbigniew Chajecki ( OSU )


Talk time : 12:00, Duration : 00:15

Current status:

upgrade of STAR Drupal to v.6.10 - status

Software and Computing phone meeting

2009-04-29 12:00
2009-04-29 13:00
Etc/GMT-5
Wednesday, 29 April 2009
1-189, HighSpeed conference bridge, at 16:00 (GMT), duration : 01:00
TimeTalkPresenter
12:00Drupal upgrade, status and plan forward ( 00:15 ) 0 filesZbigniew Chajecki (OSU)
12:15Update on the early/prompt hits ( 00:20 ) 0 filesPibero Djawotho (TAMU)
12:35Vertex finding update for d+Au 200 GeV ( 00:20 ) 2 filesAnthony Timmins (WSU)
12:55AOB ( 00:10 ) 0 filesAll (All)

upgrade of STAR Drupal to v.6.10 - status

We performed a test upgrade of our STAR drupal to v6.10 (from 5.2).

2009.04.28 LDA plus SMD analysis with pre-shower sorting

Cut optimization with Fisher's LDA classifier

ROOT implementation for LDA:

2009 APS Talk

 .pdf files attached

 

APS April Meeting Hadron A_LL talk

Find APS April Meeting Hadron A_LL talk attached

APS April Meeting W Talk

Find APS April Meeting W talk attached

DELETE - Run 9 BSMD Status Update 4 (4/27)

Under:

After further investigations -- specifically looking at strips that had a significant secondary peak, entirely separated from the main peak, with a max of ~40, which were not being caught by my cut

Crate systematic for 2006

Summary

An analysis of the crate variations results in a crate systematic of 0.9%. This increases the total calibration uncertainty to 1.6%.

Detailed Explanation:

A survey of lower energy p+p data and their

 Document prepared for the Beam Energy Scan focus group. (run-10 BUR)

 Document date March 2009

WaferConfiguration Table

 In the possibility to rerun year 7 data, an improvement of SSD data can be added.

STAR Regional Collaboration Meetings

Underlying Event APS Talk

Underlying Event APS Talk

DELETE - Run 9 BSMD Status Update 3 (4/24)

Under:

After looking more closely at the crate 1 channels I was forced to make serious revisions to status bit 2 from the previous update.  The new status bit 2 test is as follows:

CHEP 2009 Paper Drafts

Here is v03 of my conference proceedings.

Run 9 Spin QA

A. Regarding possible "Spin QA" of Run 9 200 GeV ... attached is a draft (all I could find) of the plots and procedures we had for Run 6 as an example.

Run 9 JP Rate Test

Run 9 JP Rate Test

Final Run 9 500 GeV BSMD Status - Willie Leight

Under:

BSMD Pedestals and Status for Run 9 pp 500 Data (June 2009, uploaded to offline DB)

The BSMD status analysis for the 500 GeV data proceeds as follows:

Anymore?


Talk time : 13:20, Duration : 00:20

Results of preliminary placement of BLM

Speaker : Howard M.


Talk time : 13:00, Duration : 00:20