STAR Protected
Run 9 200GeV Dijet Cross Section VPD Luminosity First Look
First look at the feasability of using the VPD as an absolute luminosity monitor for the 2009 dijet cross section measurement ...
S&C Meeting, March 19, 2014
HFT Code Readiness
* Some of the code is in HFT development area offline/hft - Common base for C&S and HFT groups - Instructions how to u
PYTHIA studies for direct photon measurement at forward rapidity
Comparison of PYTHIA Tune(100) with NLO calculations (Vogelsang 2007) at forward rapidities and center-of-mass energies of 200 and 500 GeV.
SiPM front end
Some documentation for 15-channel SiPM front-end is in the files attached.
Resistors in the preamps are different from the schematic and can be found in
STAR collaboration meeting at FIAS
Updated on Fri, 2014-05-09 10:17. Originally created by rexwg on 2014-03-13 18:56.Frankfurt
The main focus is on QM rehearsal.
Sector-to-Sector Alignment Check
Both global and local figures are listed. Name with "L" suffix is for local and "G" is for global.
Message Studies Phase 2 Presentation
Here is the presentation for STAR message studies phase 2.
runQA for run13w P14ia production
This is a summary of run QA for run13w P14ia production.
Run14 - (TPC Track - HFT Hit) Matching Studies
The following studies are based on the data processed on March 10.
1) Cosmic data with reversed full field magnetic field. Run # 15040032
Speeding up the IST readout
Today we installed new firmware to speed up the IST readout. See attachment for some details. IST will be able to run 1074 Hz @ 4 timebins now, further improvement is possible I think.