Management Meeting

2017-10-13 10:00
America/New York
Friday, 13 October 2017
, at 14:00 (GMT), duration : 00:00

Meeting starts 10am BNL Time - BlueJeans Conference ID : 160455989

Agenda:
  1. Summer shutdown progress
  2. Production and Calibration status
  3. Cold QCD workforce needs
  4. Isobar switching committee
  5. Analysis meeting
  6. Newletter
  7. AOB

Management Meeting

2017-10-20 10:00
America/New York
Friday, 20 October 2017
, at 14:00 (GMT), duration : 00:00
Meeting starts 10am BNL Time - BlueJeans Conference ID : 160455989

Agenda:
  1. Summer shutdown progress
  2. Production and Calibration status - especially 53 GeV
  3. EPD and other upgrades
  4. Analysis meeting
  5. DNP - any issues?
  6. STC -new members before QM 
  7. New convener LFS-UPC
  8. Review article
  9. AOB

Management Meeting

2017-10-27 10:00
America/New York
Friday, 27 October 2017
BlueJeans ID : 160455989, at 14:00 (GMT), duration : 00:00
 Agenda: 

1) Detector status 

    iTPC+eTOF/EPD commissioning way before the run starts? 
    Maybe in January/February for a week?

2) Analysis Meeting preparation 

3) Collaboration meeting plan 
    LBL? 

4) calibration (run 17) and production status 

5) dN/dx status and plan 

6) other items 

Management Meeting

2017-11-03 10:00
America/New York
Friday, 3 November 2017
, at 14:00 (GMT), duration : 00:00

PID efficiency

For the particle identification efficiency study, we tried two methods to select the "pure" sample.

Editorial Board Meeting

2017-09-01 11:30
2017-09-01 13:00
America/New York
Friday, 1 September 2017
https://bluejeans.com/883580682/9067, at 15:30 (GMT), duration : 01:30
  --- Editorial Board Agenda  September 1, 2017 ---
  1. Welcome & Organizational matters
  2. Review & feedback on list of active GPCs
  3. Discussion on status of selected GPCs 
    • >12 months in GPC w/o Collaboration Review: #211, #216, #219, #225, #227
    • >6 months in GPC w/o Collaboration Review: -
    • >3 months after Collaboration Review w/o Journal Submission: -
    • >6 months after Journal Submission: #226, #235
  4. PWGC topics:
    • Upcoming analysis meeting
    • Search for volunteer checking BEMC status/calibration table, picoDst code maintainer, and embedding deputy
  5. AOB

 

 

Click on the following link for the  BlueJeans Connection Details for PWGC and Editorial Board Meetings

 

AOB


Talk time : 17:00, Duration : 00:20

Realized that it is fairly straightforward to convert from ROOT geometry to AgML. 

Stv RK / Sti -G3

Speaker : Victor


Talk time : 16:40, Duration : 00:20

Optimization

Speaker : Dmitri


Talk time : 16:20, Duration : 00:20

Tracking Optimization Studies

HFT Embedding / Misalignment


Talk time : 16:00, Duration : 00:20
  • Short update on misalignment

S&C Offline Software

2017-08-24 16:00
America/New York
Thursday, 24 August 2017
1-189, SRN, at 20:00 (GMT), duration : 00:00
SRN ID: 1096183

EVO Phone Bridge Telephone Numbers:
---------------
- USA (BNL, Upton, NY)
+1 631 344 6100

- USA (Caltech, Pasadena, CA)
+1 626 395 2112
TimeTalkPresenter
16:00HFT Embedding / Misalignment ( 00:20 ) 0 files
16:20Optimization ( 00:20 ) 0 filesDmitri
16:40Stv RK / Sti -G3 ( 00:20 ) 0 filesVictor
17:00AOB ( 00:20 ) 0 files

HF-PWG minutes 2017/08/24

1) Tuning Lc cuts with Run14 AuAu 200 GeV - Sooraj Radhakrishnan

Lc spectra

Unfolding introduction

  •  iu-local-meeting_2017_09_14_v2.pdf : I set tau = s_k instead of tau = s_k^2, plots are fixed in iu-local-meeting_2017_09_14_v2_fixed.pdf

Minor Miscellaneous Clean-Ups of A_LL Data

NOTE: bXings 78 and 79 will REMAIN in the A_LL analysis; these bunches are only different because they are the only two which collide *only* at STAR but not also at PHENIX; thus th

Run12 pp500 simulation dijet tree study

 

Run 15 Jet Analyses Update

 

Flow decorrelation updates

 

BulkCorr meeting 23 Aug 17

PXL slow simulator chain update

Speaker : Xin Dong


Talk time : 11:50, Duration : 00:20