Sort by:[Date]

test

 

Run 21 EPD Calibrations for Days 158 to 163

NOTE: This starts at 17.3 GeV and switches to 3.85 GeV FXT during day 158.

energy loss study

 

CF PWG Meeting 7/8/2021

 

uploaded comments

 

ICFNP2021 abstract

 

Run21 EPD 'Live' Calibration day 164-170

Here are my results of calibrating the EPD over days 164-170 of run21.

dAu performance

 

Analysis Note for 7.2GeV hypernuclei lifetime measurement

 

sTGC leak current test

 Excel of test result:
Leak_Current_test

Test result slides :