Sort by:[Date]

PWG QA for 19.6 GeV picoDst

quick QA for the 2019 official 19.6GeV production

 

First Look at the HCal MIP peak for production_FF_dAu_200GeV_2021 data set

 

First Look at the HCal MIP peak for production_FF_dAu_200GeV_2021 data set

 

EPD Centrality in OO

Looking at the minimum bias OO data from 2021, using the quantiles of the distributions to select centrality, Jordan made the follow plots:

Status of the express production of Run XXI

 The express production of Run XXI data on HLT farm has been completed. The HLT disk has been released for the Run XXI calibration.

Influence of nuclear deformation to v2/v3 in isobar

 

SQM draft proceeding

20210727_QPT_PXi_CF_200GeV(China)

 

v2 analysis of ɸ-mesons at √sNN = 7.7 GeV in Au+Au collisions in run-21