Sort by:[Date]

LPV search in central U+U collisions

 This is the work of BNL Summer Student Paul Glenn working with Hui Wang and Paul Sorensen.

EEMC Cal Run9-07-29-2014

 Preliminary Pre&PostShower analysis:

Using the SMD I get before, as well as the ideal tower gain, I try to calibrate the pre & post shower with SMD & Tower cuts.

FPS TUFF CCA JUL 29 2014

 

-- Layout in progress ~ 25% complete.

-- Updated power input conditioning.

- Mainly the 6v DC in
- Changed 5A ferrite to 10A.

Run-11 Transverse Jets: Additional Embedding

I have supplemented the existing embedding sample with more statistics at lower partonic pT.

IFF 2D binning

 

Diffraction 2014 Abstract

A PDF form of the abstract is attached.

Diffraction 2014 Abstract V2

 

FPS TUFF CCA JUL 28 2014

 

- Corrected pinout for ACDL M50L 500E opto coupler

- Modified attenuator for A/D buffer circuit

- corrected pinout for DB15 power pins

FPS TUFF CCA JUL 28 2014

 

- Corrected pinout for ACDL M50L 500E opto coupler

- Modified attenuator for A/D buffer circuit

- corrected pinout for DB15 power pins

FPS meeting, July 28, 2014

Radiation damage test

Order/delivery status

Design

Construction 1st quadrant

Electronics status

Cable status