- My blog
- Post new blog entry
- Top bloggers
- Recent posts
Sort by:[Date]
LPV search in central U+U collisions
This is the work of BNL Summer Student Paul Glenn working with Hui Wang and Paul Sorensen.
EEMC Cal Run9-07-29-2014
Preliminary Pre&PostShower analysis:
Using the SMD I get before, as well as the ideal tower gain, I try to calibrate the pre & post shower with SMD & Tower cuts.
FPS TUFF CCA JUL 29 2014
Updated on Tue, 2014-07-29 19:21. Originally created by protected on 2014-07-29 19:21.
-- Layout in progress ~ 25% complete.
-- Updated power input conditioning.
- Mainly the 6v DC in
- Changed 5A ferrite to 10A.
Run-11 Transverse Jets: Additional Embedding
I have supplemented the existing embedding sample with more statistics at lower partonic pT.
FPS TUFF CCA JUL 28 2014
- Corrected pinout for ACDL M50L 500E opto coupler
- Modified attenuator for A/D buffer circuit
- corrected pinout for DB15 power pins
FPS TUFF CCA JUL 28 2014
Updated on Mon, 2014-07-28 16:47. Originally created by protected on 2014-07-28 16:47.
- Corrected pinout for ACDL M50L 500E opto coupler
- Modified attenuator for A/D buffer circuit
- corrected pinout for DB15 power pins
FPS meeting, July 28, 2014
Radiation damage test
Order/delivery status
Design
Construction 1st quadrant
Electronics status
Cable status
Order/delivery status
Design
Construction 1st quadrant
Electronics status
Cable status