Sort by:[Date]

EEMC PostShower Studies

Run XIII pp 500p2 (days 127-161) dE/dx. The first look.

 I have checked dE/dx results for the Part 2 (days 127-161)  of Run XIII pp 510 data with calibration constrants obtained in  Part 1 (days 074-126).

Some simple tests of the efficiency results for finding direct gamma cross sections

In the attachment

August 8th W meeting , embedding QA + data by zdcx

 Embedding done expect for 34 runs with more daq files.  Have a glance at the QA sample at the attached slides. 

PIDed Rcp Run14 AuAu14.6 GeV

 attached

Det_efficiency

Aug. 14, 2014

IST sensor efficiency
(empty sensors are excluded, bad ones are not rejected)

Run-11 Transverse Jets: Trigger Bias

Follow-up Notes (August 12, 2014)

After some discussions offline, I thought it useful to post some follow-up notes.

Sti vs Geant Energy Loss - 2

Energy losses as seen by Geant and Sti. This is for a single slice at z=-7 cm

Run-11 Transverse Jets: Update to Spin-PWG (August 7, 2014)

 

SPIN PWG W Run 13 Analysis Status Update