SubSystems

eTOF Proposal

Under:

 A proposal to install CBM TOF detectors on the east pole tip for BES-II



Older material

Under:

 

****Some links from 2011 tracking review:

Tracking Focus Work

Under:

 Meetings [newer on top]

VPD

 Vertex Position Detector (VPD)

Procedural Notes and Run Operations

Paper review - A_NN and A_SS

A_NN, A_SS GPC paper review link (PP2PP subsystem webpage):

Detector package information

Under:
Detector package information

Silicon performance (cluster data)

Under:
Silicon performance

Photomultipliers data

Under:
ADC and TAC distributions

DAQ-expert materials

Under:
 DAQ-expert materials

Racks schemes

Under:
 

Operation instructions



Trigger

Under:
 Trigger

Photographs of crates

Under:

Run 15 preparation

Under:

2009 setup (Phase I)

Under:
 

Pictures

Under:
 

Data analysis

Under:

Technical information

Under:
 

Software

Under:
Software

Map of connections

Under:
Click on a chosen scheme to enlarge.