STAR Protected
Trigger Emulator/Simulator Test for Trigger ID 137641
Trigger Emulator/Simulator Test for Trigger ID 137641
Abstract: We evaluate the L2 gamma trigger simulator in the StTriggerUtilities package. To validate the trigger simulator, we compare the decisions made by the simulation software to the online trigger decision using an independently triggered event sample, i.e. events which satisfied either the EJP, BJP or dijet triggers.
Working Documents
A page to keep working documents of the Strangeness Group
1. A Beam Use Request sent to the Spokesman on 29th January 2008 - doc and pdf formats below
EMC Triggered 2-particle Correlation Studies
Speaker : Lee Barnby (for Essam Elhalhuli)
Talk time : 12:20, Duration : 00:10
Update on auto-correlations in Cu+Cu
Speaker : Rene Bellwied
Talk time : 11:50, Duration : 00:30
QM Poster Preview
Speaker : Dhevan Gangadharan ( UCLA )
Talk time : 11:30, Duration : 00:20
QM Talk Rehearsal & Discussion
Speaker : Xiaobin Wang ( Tsinghua )
Talk time : 10:00, Duration : 01:30
ReneeFatemi-FGT-HN-Uploads
bad dog!
2008-02-01
The council meeting will be held in India.
c) high-energy-Filter (Jan)
L2-high-energy-Algo ( 100% accept)
L2-high-ene-algo (does not abort)
Site popular content
Popular content Today
Software & Computing | 35364 |
FTS Fast Sim | 24886 |
BulkCorr | 21542 |
STAR Protected | 21153 |
Correlations and Fluctuations | 15929 |
All time popular
Software & Computing | 454308 |
... create a cross-reference to another page | 141649 |
TCP parameters, Linux kernel | 137455 |
General information | 132575 |
Di-electron spectrum at mid-rapidity in $p+p$ collisions at $\sqrt{s} = 200$ GeV | 124475 |
oolatex and tex4ht | 104543 |
SSH connection stability | 92632 |
Production | 89600 |
Software Infrastructure | 86474 |
Weekly PWG Meetings | 84899 |
Working Group Members | 79279 |
STAR Future & Upgrade | 77365 |
BulkCorr | 64374 |
STAR Protected | 58594 |
cdev'06 code
Machinery used to archive (and monitor) cdev info in the STAR online Db
QM Talk "System size dependence of di-hadron correlations with identified strange particles..." - review of 1st draft
Reference
Speaker : Christine Nattrass ( Yale )
Talk time : 00:00, Duration : 00:25
Attached ppt file is now the one from the link Christine sent around before the meeting. I had previously attached preview which she had earlier sent to Jun and I.
FGT-HN Upload contributions
balewski | |||
---|---|---|---|
1 | Miro_PCBoard.pdf | PDF 54.29 KB | May 15 2009 18:07:57. |
2 | Miro-apv_brd_pcb.pdf | PDF 176.16 KB | May 15 2009 18:15:13. |
3 | 2008-10-FGT-DNPv1.pdf | PDF 5.25 MB | May 15 2009 18:14:40. |
gvisser | |||
---|---|---|---|
1 | Slides from Miro, for FGT phone meeting, friday 2/8/2008 | PDF 349.33 KB | May 15 2009 18:08:17. |
2 | FGT & SSD electrical services materials budget - PRELIMINARY | VND.MS-EXCEL 21 KB | May 15 2009 18:04:45. |
3 | First quote for aluminum-based cable for ALL FGT SERVICES - MAX 7.24mm OD - technical details may be changed still | PDF 36.83 KB | May 15 2009 18:07:39. |
4 | [from Doug] Draka # HTC-50-1-1, 5kVdc cable (CERN spec) | PDF 79.46 KB | May 15 2009 18:11:46. |
miro | |||
---|---|---|---|
1 | M_brd Quote Proto.pdf | PDF 32.24 KB | May 15 2009 18:08:05. |
2 | apv_board_doc.pdf | PDF 67.31 KB | May 15 2009 18:22:36. |
3 | apv_board_pcb.pdf | PDF 112.81 KB | May 15 2009 18:17:32. |
4 | sig_board_doc.pdf | PDF 49.27 KB | May 15 2009 18:22:38. |
5 | sig_board_pcb.pdf | PDF 53.45 KB | May 15 2009 18:06:49. |
6 | mechtest_pcb.pdf | PDF 38.23 KB | May 15 2009 18:07:01. |
7 | mechtest_doc.pdf | PDF 86.36 KB | May 15 2009 18:03:40. |
8 | mechtest_quote.pdf | PDF 62.77 KB | May 15 2009 18:03:29. |
9 | mechtrim_pcb.pdf | PDF 107.18 KB | May 15 2009 18:11:34. |
10 | pwr_board_pcb.pdf | PDF 34.17 KB | May 15 2009 18:06:57. |
pagebs | |||
---|---|---|---|
1 | VertexPosition_mit0001_33_4000evts.jpg | JPEG 43.64 KB | May 15 2009 18:06:30. |
2 | OPcountsQCD.png | PNG 13.65 KB | May 15 2009 18:15:29. |
3 | OPcountsW.png | PNG 17.83 KB | May 15 2009 18:04:16. |
4 | ETspectrumQCD.png | PNG 16.2 KB | May 15 2009 18:08:59. |
5 | ETspectrumW.png | PNG 17.87 KB | May 15 2009 18:15:36. |
6 | IsoET01.png | PNG 13.64 KB | May 15 2009 18:12:55. |
7 | IsoET07.png | PNG 13.88 KB | May 15 2009 18:14:05. |
8 | TrigEToverIsoET01.png | PNG 16.89 KB | May 15 2009 18:05:31. |
9 | TrigEToverIsoET07.png | PNG 17.61 KB | May 15 2009 18:10:40. |
10 | TrigOverIso01.png | PNG 16.4 KB | May 15 2009 18:07:03. |
11 | TrigOverIso026.png | PNG 15.03 KB | May 15 2009 18:21:17. |
12 | TrigOverIso07.png | PNG 16.88 KB | May 15 2009 18:21:22. |
13 | geantAccessSample.txt | PLAIN 916 bytes | May 15 2009 18:07:02. |
14 | setC3detectedSpectra.png | PNG 12.8 KB | May 15 2009 18:04:35. |
15 | setC3thrownSpectra.png | PNG 13.45 KB | May 15 2009 18:21:19. |
16 | Abstract10-08V1.0.pdf | PDF 18.53 KB | May 15 2009 18:04:45. |
17 | v4.0_FinalSpectra.png | PNG 13.65 KB | May 15 2009 18:17:35. |
18 | Abstract10-08V1.3.pdf | PDF 19.61 KB | May 15 2009 18:04:19. |
rfatemi | |||
---|---|---|---|
1 | Bogary_Mush.jpg | JPEG 481.46 KB | May 15 2009 18:15:35. |
wwjacobs | |||
---|---|---|---|
1 | eemc_trigger_patches_annotated.pdf | PDF 988.89 KB | May 15 2009 18:04:16. |
2 | BPMT_BPRS 003.jpg | JPEG 1.04 MB | May 15 2009 18:06:51. |
3 | eemc_swingarm.pdf | PDF 61.82 KB | May 15 2009 18:03:46. |
wzhang | |||
---|---|---|---|
1 | Sunset.jpg | JPEG 69.52 KB | May 15 2009 18:04:49. |
2 | disk123.gif | GIF 19.86 KB | June 08 2009 14:04:09. |
3 | backFgtHit.gif | GIF 30.89 KB | June 08 2009 14:06:15. |
Children pages below contain FGT-HN uploads from individual users.
New users: please follow this instruction.
Warning: never remove uploaded attachments - it would mess up automatic # on the summary page for any subsequent uploads. Instead upload revised attachment.
HFT CD0- final dry rehearsal
BNL , at 05:00 (GMT), duration : 00:00
Talks should be uploaded, and modified here ahead of the meeting.
Time | Talk | Presenter |
---|---|---|
00:00 | Introduction ( 00:30 ) 1 file | T.Hallman |
00:30 | Physics Motivation ( 00:50 ) 1 file | N.Xu |
01:40 | HFT performance ( 00:30 ) 1 file | J.Thomas |
02:30 | Project Overview ( 00:20 ) 1 file | H.G.Ritter |
02:50 | IST ( 00:30 ) 2 files | B.Surrow |
03:20 | PIXEL ( 00:40 ) 1 file | H.Wieman |
04:00 | HFT Mechanical ( 00:40 ) 0 files | E.Anderssen |
04:40 | Cost & Schedule ( 00:30 ) 0 files | S.Morgan |
05:10 | Summary ( 00:10 ) 0 files | F.Videbaek |
- « first
- ‹ previous
- 1
- 2
- 3