STAR Protected

Isobar meeting 07/26/2022

 

Isobar meeting 07/26/2022

 

Run-by-run QA algrithom - version 2

# Run-by-run QA script developed for STAR BES-II run-by-run QA

# authors (c) C.Y. Tsang, Y. Hu, P. Tribedy 2022-07-19

WPCF fig.1

 

Balance Functions preliminary plots for WPCF

          Preliminary plots  WPCF 2022

Open Tasks

Open EToF-Tasks:

Observation of an anti-hypernuclei {}^{4}_{#bar{#lambda}}#bar{H} at RHIC

Observation of an Antimatter Hypernucleus with Atomic Mass Number of 4

Centrality check

 

Centrality check

 

Run19 19.6GeV Au-Au Embedding Request Yiding Han

 

0607_dielectron_meeting

 

0607_dielectron_meeting

 

0607_dielectron_meeting

 

SQM plenary STAR talk

June 1

  • Main Production
    • production_isobar_2018 (st_mtd) 
      66250 files have been submitted out of 66274

June

 

Presentation 6/1/2022

 

May 25

 

  • Main Production
    • production_isobar_2018 (st_mtd) 
      55951 files have been submitted out of 66274
      Around 85% submission
       
  • Calibration production  
    •  
       
  • MuDst to PicoDst conversion 
    • pp500_production_2017 (physics) SL21d
      222335 files have been converted out of 651818
      Around 34% completed (Expected to be completed within 75~90 days) 
       
    • UU_production_2012 (physics) P12id with SL22a
      Going to start today
       
  • Pushing files  
    • trgsetupname=pp200_production_2012, production=P12id, library=SL21d
      HPSS: done   DD: done
    • trgsetupname=production_isobar_2018, production=P21id, library=SL21d, sname2~st_hf 
      HPSS: done.   DD: done
    • trgsetupname=production_isobar_2018, production=P22ia, library=SL22a, sname2~st_upc 
      HPSS: done.   DD: done

May 18

 

  • Main Production
    • production_isobar_2018 (st_mtd) 
      26392 files have been submitted out of 66274

Pion femtoscopy at 3 GeV

Here is my results on femtoscopy