4.59GeV FXT Space Charge
Updated on Wed, 2019-07-10 14:03. Originally created by bkimel on 2019-07-10 14:03.Run 15 BEMC Calibration: Systematics Studies
Updated on Mon, 2020-01-06 14:41. Originally created by nlukow on 2019-07-10 12:23.Some updates from yesterday's meeting.
Run 19 EMC Timing
Updated on Wed, 2019-07-10 10:26. Originally created by tinglin on 2019-07-10 10:25. Run 20191009
Some An Invesigations
Updated on Thu, 2019-07-11 08:30. Originally created by bsumma on 2019-07-10 10:25.Paper Proposal - A_N
Updated on Thu, 2019-07-11 08:29. Originally created by bsumma on 2019-07-10 10:20.Link to overall analysis compilation:
https://www.star.bnl.gov/protected/spin/bsumma/TSSAR15paper/AnalysisNoteLinks.pdf
Updated Reference material with fill list / count:
AOB
Updated on Wed, 2019-07-10 17:34 by testadmin. Originally created by jeromel on 2019-07-10 09:18.Speaker : All ( All )
Talk time : 12:40, Duration : 00:20
- ITD has changed the Network registration procedure
- If you are a BNL user, you could use your PeopleSoft login to register
- If you are NOT&nbs
Offline software updates
Updated on Wed, 2019-07-10 10:35 by jwebb. Originally created by jeromel on 2019-07-10 09:17.Speaker : Jason Webb ( BNL )
Talk time : 12:20, Duration : 00:20
AuAu@27GeV full production QA
Updated on Wed, 2019-07-24 15:58. Originally created by lxy1122 on 2019-07-10 09:16.Attached is the QA plots for the AuAu@27GeV full production. The red lines on the run by run QA plots are Ave+/-5 \sigma.
Embedding status and updates
Updated on Wed, 2019-07-10 10:36 by zhux. Originally created by jeromel on 2019-07-10 09:15.Speaker : Xianglei Zhu ( TSINGHUA )
Talk time : 12:00, Duration : 00:20
Software and Computing Meeting
Updated on Wed, 2019-07-10 09:13 by testadmin. Originally created by jeromel on 2019-07-10 09:13. 2019-07-10 12:00
2019-07-10 13:00
America/New York
Wednesday, 10 July 2019
1-189, BlueJean, at 16:00 (GMT), duration : 01:00
1-189, BlueJean, at 16:00 (GMT), duration : 01:00
Time | Talk | Presenter |
---|---|---|
12:00 | Embedding status and updates ( 00:20 ) 1 file | Xianglei Zhu (TSINGHUA) |
12:20 | Offline software updates ( 00:20 ) 1 file | Jason Webb (BNL) |
12:40 | AOB ( 00:20 ) 0 files | All (All) |
Bulkcorr_0710_isobar_QA
Updated on Tue, 2019-07-09 23:59. Originally created by chunjian on 2019-07-09 23:59.
Run18 isobar 200GeV data QA, correlator reproduction
Updated on Wed, 2019-07-10 08:27. Originally created by fengyich on 2019-07-09 20:37.
Run15 pp200 Transverse -- Jet Meeting 2019-07-10
Updated on Sun, 2019-07-14 18:00. Originally created by tinglin on 2019-07-09 18:04.2015 pp200 Transverse embedding estimation
sTGC manual (run19 200GeV)
Updated on Thu, 2019-07-11 17:57. Originally created by iupsal on 2019-07-09 16:39.v1 uploaded 07/09
v2 uploaded 07/10, changed voltages to 1450 Full HV and 450 for standby.
TOF_MTD_ETOF_Shutdown_status
Updated on Tue, 2019-07-09 15:24. Originally created by zye20 on 2019-07-09 15:22.
TPC Meeting
Updated on Thu, 2019-07-11 08:40. Originally created by iraklic on 2019-07-09 13:10. 2019-07-10 15:00
2019-07-10 15:00
America/New York
Wednesday, 10 July 2019
1-189, at 19:00 (GMT), duration : 00:00
1-189, at 19:00 (GMT), duration : 00:00
FXT 2019 : 4.59 GeV [Fast Reconstruction]

There seem to be no difference in the primary vertex position with and without the Space Charge correction for this case.
Meeting Location - BNL Room 1-189
The Bluejean connection
Title: STAR TPC Weekly
Description: Weekly TPC meeting for the STAR Collaboration
Community: STAR
Phone Dial-in
+1.408.740.7256 (US (San Jose))
+1.888.240.2560 (US Toll Free)
+1.408.317.9253 (US (Primary, San Jose))
Meeting ID: 276 827 050
Direct link: https://bnl.bluejeans.com/276827050
Time | Talk | Presenter |
---|---|---|
15:00 | 4.59GeV FXT Space Charge ( 00:20 ) 1 file | Benjamin Kimelman |
SL19c FMS QA
Updated on Tue, 2019-07-09 13:05. Originally created by mkelsey on 2019-07-09 13:05.Pre-production FMS QA with SL19c
RUN15pp200trans intermediate calibration results
Updated on Tue, 2019-07-09 10:46. Originally created by ckimstar on 2019-07-09 10:46.- 8 of 9 subgroups were calibrated at least once by a full calibration
- Cell by Cell mass distribution can be provided if there's request