D0 v1 paper: PRL referee comments and replies 2nd round

 

BNL ME report contribution

Edits:

The results have just been accepted for publication in
Phys. Rev. D. 

SDU DeCorr Discussion 2019

Goal
AuAu
- 200 GeV with BBC (Maowu)
- Fix 54 GeV (Maowu)
   - Check detector effect with BBC

Krakow council meeting

 Here I post the minutes from the council meeting at Krakow. They are of particular interest due to the
post meeting development on the ;proposed change to bylaws' send around on 9/9

Inclusive jets and dijets run13 final

 

Replies to GPC

 

STAR PWGC Meeting

2019-09-27 09:30
America/New York
Friday, 27 September 2019
https://bluejeans.com/883580682/9067, at 13:30 (GMT), duration : 00:00
1) Embedding status - Xianglei
2) Status of QM2019 analyses and challenges - all

STAR PWGC Meeting

2019-09-20 09:30
America/New York
Friday, 20 September 2019
https://bluejeans.com/883580682/9067, at 13:30 (GMT), duration : 00:00
1) PWGC preview

Tittle : Observation of Ds± enhancement in Au+Au collisions at √sNN = 200 GeV

PWG: HF
PAs : Xiaolong Chen, Xin Dong, Chuan Fu, Huanzhong Huang, Md Nasim, Shusu Shi, Yifei Zhang, Long Zhou 
Targeted Journal : PRL
Presentation: https://drupal.star.bnl.gov/STAR/system/files/PWGC_Preview_Ds_v2.pdf
Webpage: https://www.star.bnl.gov/protected/heavy/fuchuan/Ds_paper_documents/webpage_Ds/
Analysis note: N/A
Paper draft: N/A

- Brief introduction from the PWG conveners (5’)  [Convener]
- Paper proposal (15')  [Chuan]
- Open discussions (35')
- Summary from the conveners' panel (5’)

2)
 PWGC meeting time

Quark Matter 2019 Accepted Presentations

Weekly Meeting (Sep. 9)

- ZZ: question on meeting
- Xiaoxuan: Dipi0 updates

Updates on dielectron analysis with Run18 27GeV AuAu

Speaker : Zaochen Ye


Talk time : 10:00, Duration : 00:20

Dielectron_Run18_27GeV_AuAu_ZaochenYe_20190909

FMS Run 17 Run QA Summary for FPS and FPOST

Summary Slides for my work on QA runs from Run 17 for FPS and FPOST

abstract

 

Presentation and proceeding of Ds analysis

 

Closeout

Closed Session

 

Speaker : Committee


Talk time : 11:55, Duration : 01:35

Q&A

readiness of the fast offline software to determine the operational performance of the detector

 

Speaker : Florian Seck


Talk time : 11:05, Duration : 00:30

Q&A

plans for commissioning eToF with and without beam

 

Speaker : Ingo Deppner


Talk time : 10:15, Duration : 00:30