Tong's QM2019 preliminary plots
Updated on Mon, 2019-11-04 07:27. Originally created by tongliu on 2019-11-02 04:31.
Update on iTPC aging in Run XIX
Updated on Fri, 2019-11-01 10:43. Originally created by fisyak on 2019-11-01 10:43.I have reported last May about observing aging effect in iTPC in Run XIX
https://drupal.star.bnl.gov/STAR/blog/fisyak/itpc-aging
poster
Updated on Fri, 2019-11-01 09:27. Originally created by sesumi on 2019-11-01 09:27.Speaker : Haojie Xu
Talk time : 18:15, Duration : 00:01
Run 17 face-to-face calibration meeting
Updated on Mon, 2019-11-25 09:40 by veprbl. Originally created by eca on 2019-11-01 04:58. 2019-11-25 08:30
America/New York
Monday, 25 November 2019
, at 13:30 (GMT), duration : 00:00
, at 13:30 (GMT), duration : 00:00
Agenda:
Room at BNL: 1-224
* "historical summary" of the issues
- what was seen originally by Dima and Jinlong Dima
- h+/- ratio its dependence on triggers, time-dependence, production version, ……. Jae
* what was done for the TPC calibration Matt and Gene
- details on the original calibration what was accounted for how
* what has been done to identify the underlying effect Jae, Matt and Gene
- what has been changed in the calibration and why
* brain storming what needs to be still studied all
- what causes have been eliminated
- are all the observations internally consistent
- why do we see this issue in run-17 but not run-13
- what do we want to do to fix the problem
- h+/- ratio its dependence on triggers, time-dependence, production version, ……. Jae
* what was done for the TPC calibration Matt and Gene
- details on the original calibration what was accounted for how
* what has been done to identify the underlying effect Jae, Matt and Gene
- what has been changed in the calibration and why
* brain storming what needs to be still studied all
- what causes have been eliminated
- are all the observations internally consistent
- why do we see this issue in run-17 but not run-13
- what do we want to do to fix the problem
Room at BNL: 1-224
Meeting URL
Meeting ID
412 467 530
Want to dial in from a phone?
Dial one of the following numbers:
+1.408.740.7256 (US (San Jose))
+1.408.317.9253 (US (Primary, San Jose))
(see all numbers - https://www.bluejeans.com/premium-numbers)
Enter the meeting ID and passcode followed by #
Connecting from a room system?
Dial: bjn.vc or 199.48.152.152 and enter your meeting ID & passcode
Time | Talk | Presenter |
---|---|---|
08:30 | History of my study ( 00:30 ) 2 files | Dmitry Kalinkin |
09:00 | Run 17 EMC calibration ( 00:20 ) 0 files | Jae Nam |
10:20 | TPC SC and GL Calibration Run 17 (pp 510) ( 01:00 ) 1 file | Matt Posik |
11:20 | Problems in run15 ( 00:20 ) 0 files | Carl Gagliardi |
dca check for 27- and 39 GeV
Updated on Fri, 2019-11-01 02:32. Originally created by hexh on 2019-11-01 02:32.191101-Design files of outer hybrids (v2.3)
Updated on Sun, 2019-11-10 22:20. Originally created by jndong on 2019-10-31 20:32.Modification: Address connection for the te
Hybrid, T-board and Inner Signal Cable
Updated on Wed, 2019-10-30 19:31. Originally created by yezhenyu on 2019-10-30 19:19.Speaker : Jianing Dong, Mike Capotosto, Gerard Visser
Talk time : 09:20, Duration : 00:20
Teststand at BNL
Updated on Thu, 2019-10-31 01:20 by ptribedy. Originally created by yezhenyu on 2019-10-30 19:19.Speaker : Prithwish Tribedy, Yu Hu
Talk time : 09:50, Duration : 00:10
Mechanical Structure
Updated on Wed, 2019-10-30 19:19. Originally created by yezhenyu on 2019-10-30 19:19.Speaker : Yi Yang, Han-sheng Li
Talk time : 09:00, Duration : 00:30
STAR Forward Silicon Tracker Meeting
Updated on Wed, 2019-10-30 19:19. Originally created by yezhenyu on 2019-10-30 19:19. 2019-11-07 09:00
2019-11-07 10:30
America/New York
Thursday, 7 November 2019
https://bluejeans.com/101020434 , at 14:00 (GMT), duration : 01:30
https://bluejeans.com/101020434 , at 14:00 (GMT), duration : 01:30
Time | Talk | Presenter |
---|---|---|
09:00 | Hybrid, T-board, and Inner Signal Cable ( 00:20 ) 0 files | Jianing Dong, Mike Capotosto, Gerard Visser |
09:20 | Mechanical Structure ( 00:20 ) 0 files | Yi Yang, Han-sheng Li |
09:40 | Module Assembly at Fermilab ( 00:20 ) 3 files | Zhenyu Ye |
10:00 | BNL Test Stand ( 00:20 ) 0 files | Prithwish Tribedy, Yu Hu |
10:20 | Simulation ( 00:20 ) 0 files | Te-Chuan Huang, Krishan Gopal |
BNL Test Stand
Updated on Tue, 2019-11-05 20:20. Originally created by yezhenyu on 2019-10-30 19:19.Speaker : Prithwish Tribedy, Yu Hu
Talk time : 10:00, Duration : 00:20
Module Assembly at Fermilab
Updated on Thu, 2019-11-07 03:43. Originally created by yezhenyu on 2019-10-30 19:19.Speaker : Zhenyu Ye
Talk time : 09:40, Duration : 00:20
Hybrid, T-board, and Inner Signal Cable
Updated on Tue, 2019-11-05 20:17. Originally created by yezhenyu on 2019-10-30 19:19.Speaker : Jianing Dong, Mike Capotosto, Gerard Visser
Talk time : 09:00, Duration : 00:20
Mechanical Structure
Updated on Tue, 2019-11-05 20:17. Originally created by yezhenyu on 2019-10-30 19:19.Speaker : Yi Yang, Han-sheng Li
Talk time : 09:20, Duration : 00:20
Simulation
Updated on Wed, 2019-10-30 19:19. Originally created by yezhenyu on 2019-10-30 19:19.Speaker : Te-Chuan Huang, Krishan Gopal
Talk time : 10:00, Duration : 00:20
Module Assembly at Fermilab
Updated on Thu, 2019-10-31 12:43. Originally created by yezhenyu on 2019-10-30 19:19.Speaker : Zhenyu Ye
Talk time : 09:40, Duration : 00:10
STAR Forward Silicon Tracker Meeting
Updated on Wed, 2019-10-30 19:19. Originally created by yezhenyu on 2019-10-30 19:19. 2019-10-31 09:00
2019-10-31 10:30
America/New York
Thursday, 31 October 2019
https://bluejeans.com/101020434 , at 13:00 (GMT), duration : 01:30
https://bluejeans.com/101020434 , at 13:00 (GMT), duration : 01:30
Time | Talk | Presenter |
---|---|---|
09:00 | Mechanical Structure ( 00:30 ) 0 files | Yi Yang, Han-sheng Li |
09:20 | Hybrid, T-board and Inner Signal Cable ( 00:20 ) 0 files | Jianing Dong, Mike Capotosto, Gerard Visser |
09:40 | Module Assembly at Fermilab ( 00:10 ) 2 files | Zhenyu Ye |
09:50 | Teststand at BNL ( 00:10 ) 1 file | Prithwish Tribedy, Yu Hu |
10:00 | Simulation ( 00:20 ) 0 files | Te-Chuan Huang, Krishan Gopal |
FXT acceptance
Updated on Wed, 2019-10-30 13:37. Originally created by bkimel on 2019-10-30 13:37.Calibration Status
Updated on Thu, 2019-10-31 14:12. Originally created by genevb on 2019-10-30 09:14.Speaker : G. Van Buren ( BNL )
Talk time : 12:00, Duration : 00:20
- Run 18
- FXT TPC T0: while the new T0s brought the east and west halves together, there was an error in the correction for the collision time with respect to th