FCV PWG report
Updated on Thu, 2021-01-07 13:30 by sesumi. Originally created by marr on 2020-12-30 21:17.my slide is here (https://drupal.star.bnl.gov/STAR/system/files/FCV_analysis_2021Jan08_esumi.pdf).
Reference
Speaker : ShinIchi Esumi
Talk time : 10:00, Duration : 00:20
Cold QCD PWG report
Updated on Fri, 2021-01-08 03:37 by zurek. Originally created by marr on 2020-12-30 21:17.https://drupal.star.bnl.gov/STAR/system/files/ColdQCDSummary_MZurek210108.pdf
Reference
Speaker : Maria Zurek
Talk time : 09:40, Duration : 00:20
JetCorr PWG report
Updated on Fri, 2021-01-08 08:49 by elayavalli. Originally created by marr on 2020-12-30 21:16.
Reference
Speaker : Raghav Elayavalli
Talk time : 09:20, Duration : 00:20
HF PWG analysis highlight: Jpsi RpA with MTD
Updated on Thu, 2021-01-07 18:08. Originally created by marr on 2020-12-30 21:15.
Reference
Speaker : Rongrong Ma
Talk time : 09:00, Duration : 00:20
STAR Preliminary Request
Updated on Wed, 2020-12-30 19:43. Originally created by jdb on 2020-12-30 19:43.Reference
Speaker : Daniel Brandenburg
Talk time : 10:00, Duration : 00:20
light nuclei d, t he3, he4 v1 and v2 from s_NN=3GeV Au+Au collisions
Updated on Tue, 2020-12-29 20:58. Originally created by hexh on 2020-12-29 19:46.
Tracking Efficiency Uncertainty meeting
https://bnl.zoomgov.com/j/1607035037?pwd=WDVqaEdwa0RtTEM5a1VvZ24yU2gwdz09, at 15:00 (GMT), duration : 01:00
More study of Nonflow subtraction
Updated on Wed, 2020-12-23 09:07. Originally created by slhuang on 2020-12-22 17:42.
2PC flow update
Updated on Tue, 2020-12-22 13:42. Originally created by mstefaniak on 2020-12-22 13:42.
FST QC meeting
virtual , at 14:00 (GMT), duration : 00:00
Internal review of QC process and current status
Recommendation from review
An internal review of the procedures and implementation of the QC plans and documentation should be performed after the first 10% of the production is complete before further expensive and sparse parts (sensors and asics!) are committed.
The brief review should present
1) Demonstrate implementation of e-log
Take 2 cases
a) One of the prototype that was populated and tested (03,/04) Try to grade it with the current requirements as we know they were successfully populated and running
b) Take of the currently produced modules that were send to UIC (9-12) and show the grading
2) Present a summary of grading for the 09- now modules for each of the sub-grading quantities (outer, inner, different fastnesses, DR). Explain how the weighted grading is done.
3) Present what went wrong with the rejected ones (overflow glue,..) and what that implies for further production
Charge to review:
Is the QC documentation sufficient?
Does the QC documentation in the assembly document (V3) reflect what is done now?
Should the summary contain some of the sub grading?
Is there a need for any change in procedures, or QC measures?
.
Update on proton feed-down correction in Au+Au collision for BES - I
Updated on Mon, 2020-12-21 09:23. Originally created by dingwei on 2020-12-21 09:16.Reference
Speaker : Dingwei Zhang ( CCNU )
Talk time : 11:00, Duration : 00:20
Proton feed-down analysis note for BES-I
Updated on Mon, 2021-02-01 09:41. Originally created by dingwei on 2020-12-21 05:42.
Strange hadrons to pion ratios
Updated on Mon, 2020-12-21 04:26. Originally created by yhuang on 2020-12-21 04:20.Reference
Speaker : Yan Huang ( Tsinghua University )
Talk time : 10:40, Duration : 00:20
He4L energy loss correction at 3.0GeV FXT
Updated on Mon, 2020-12-21 01:41. Originally created by shaoth on 2020-12-21 01:41.Hypernuclei Lifetime Analysis sNN=3GeV
Updated on Mon, 2020-12-21 00:32. Originally created by yhleung2 on 2020-12-21 00:32.Reference
Speaker : Yue Hang Leung ( Lawrence Berkeley National Laboratory )
Talk time : 10:00, Duration : 00:20
Integration
Updated on Thu, 2020-12-17 20:49. Originally created by yezhenyu on 2020-12-17 20:49.Speaker : Rahul Sharma, Felix Archampong ( BNL )
Talk time : 09:00, Duration : 00:20
Follow-up on action items
Updated on Sun, 2020-12-20 09:55. Originally created by yezhenyu on 2020-12-17 20:49.Speaker : all
Talk time : 08:30, Duration : 00:15
************* From Dec 14 *************
Production status:
Hybrids (80): done
Integration test
Updated on Thu, 2020-12-17 20:49. Originally created by yezhenyu on 2020-12-17 20:49.Reference
Talk time : 00:00, Duration : 00:00