pi- K- at Run 20 3.9 GeV
Updated on Wed, 2025-06-11 21:28. Originally created by xgn1992 on 2025-06-11 21:28.pi- K- at Run 20 3.5 GeV
Updated on Wed, 2025-06-11 21:24. Originally created by xgn1992 on 2025-06-11 21:24.Particles: pi-, K-
Energy (Year): 3.5 (2020)
production_5p75GeV_fixedTarget_2020
Production Tag: P24iy
Library : SL24c
List of bad runs 20355020, 20355021, 21044023, 21045024, 21045025, 21044027, 21044035, 21045004
Trigger ID 720000
Vertex : -198 cm < Vz < 202 cm, Vr < 2 cm
Flat Pt [0, 3.5] GeV, flat eta [-2.6, 0.1], flat phi [0, 2pi]
Statistics : 500k each particle
5% refmult particles embedded
Request ID | 20252402 |
Priority: EC | 0 |
Priority: pwg | Normal |
Status | New |
Physics Working Group | LFS-UPC |
Requested by | xgn1992 |
Contact email(s) | xieguannanpp@gmail.com, liubingchen@mails.ccnu.edu.cn |
Contact phone(s) | |
PWG email(s) | star-lfsupc-l@lists.bnl.gov |
Assigned Deputy: | Not assigned |
Assigned Helper: | Not assigned |
File lookup |
Particle | Alpha |
Particle settings | dalitz |
Particles per event | 1 |
Vertex Z, cm | -30 < Vertex < 30 |
Gaussian sigma in X,Y,Z (cm), if applicable | 0, 0, 0 |
Vertex offset: x, mm | 0 |
Vertex offset: y, mm | 0 |
Φ (phi), radian | 0 < Φ < 6.29 |
η (eta) | -0.5 < η < 0.5 |
Pt, GeV | 0 < Pt < 30 |
pi- K- at Run 19 3.2 GeV
Updated on Wed, 2025-06-11 21:15. Originally created by xgn1992 on 2025-06-11 21:15.Particles: pi-, K-
Dataset 3.2 GeV (2019)
production_4p59GeV_fixedTarget _2019
Production/Library Tag P24iy
Library : SL24c
List of bad runs 20180005, 20180006, 20180019, 20180025, 20181016, 20182034, 20183001, 20183013, 20183014, 20183019
Trigger ID 680001
Vertex : -198 cm < Vz < 202 cm, Vr < 2 cm
Flat Pt [0, 3.5] GeV, flat eta [-2.6, 0.1], flat phi [0, 2pi]
Statistics : 500k each particle
5% refmult particles embedded
Request ID | 20252401 |
Priority: EC | 0 |
Priority: pwg | High |
Status | New |
Physics Working Group | LFS-UPC |
Requested by | xgn1992 |
Contact email(s) | xgn1992@mail.ustc.edu.cn, liubingchen@mails.ccnu.edu.cn |
Contact phone(s) | |
PWG email(s) | star-lfsupc-l@lists.bnl.gov |
Assigned Deputy: | Not assigned |
Assigned Helper: | Not assigned |
File lookup |
Particle | Alpha |
Particle settings | dalitz |
Particles per event | 1 |
Vertex Z, cm | -30 < Vertex < 30 |
Gaussian sigma in X,Y,Z (cm), if applicable | 0, 0, 0 |
Vertex offset: x, mm | 0 |
Vertex offset: y, mm | 0 |
Φ (phi), radian | 0 < Φ < 6.29 |
η (eta) | -0.5 < η < 0.5 |
Pt, GeV | 0 < Pt < 30 |
Measurements of D0 and D∗ production in p+p collisions at 510 GeV in STAR (at CTU-Yale Workshop)
Updated on Wed, 2025-06-11 18:15. Originally created by palsp on 2025-06-11 18:15.
Mass difference TPC Calibration
Updated on Thu, 2025-06-12 14:38. Originally created by educkwort on 2025-06-11 15:11.for ease of copy-paste:
EPD TAC Offset
Updated on Wed, 2025-06-11 12:45. Originally created by rjreed on 2025-06-11 12:45.Mike tried to take a run with the trigger bbcmb (online.star.bnl.gov/RunLog/) for the tacoffset determination. More so than the timing scan, thi
fcme update: C3p/V2p ratio, request for preliminary plots
Updated on Fri, 2025-06-13 13:27. Originally created by fengyich on 2025-06-11 07:54.
Prague workshop
Updated on Wed, 2025-06-11 04:58. Originally created by imooney on 2025-06-11 04:48.
CTU-Yale STAR Workshop 2025 Laura
Updated on Wed, 2025-06-11 02:03. Originally created by prozorov on 2025-06-11 02:03.S&C Management Meeting
Updated on Tue, 2025-06-10 23:00. Originally created by geurts on 2025-06-10 23:00., at 15:30 (GMT), duration : 01:00
S&C Management Meeting
Updated on Tue, 2025-06-10 23:00. Originally created by geurts on 2025-06-10 23:00., at 15:30 (GMT), duration : 01:00
S&C Management Meeting
Updated on Tue, 2025-06-17 19:38. Originally created by geurts on 2025-06-10 23:00., at 15:30 (GMT), duration : 01:00
Agenda
- Production and calibration status
- FWD software production readiness
- Embedding
- Software status: 32->64b readiness
- NPPS/SDCC news/announcements
- open SDCC tickets
- AOB
S&C Management Meeting
Updated on Tue, 2025-06-10 23:00. Originally created by geurts on 2025-06-10 23:00., at 15:30 (GMT), duration : 01:00
S&C Management Meeting
Updated on Tue, 2025-06-10 23:00. Originally created by geurts on 2025-06-10 23:00., at 15:30 (GMT), duration : 01:00
S&C Management Meeting
Updated on Tue, 2025-06-10 23:04. Originally created by geurts on 2025-06-10 23:00., at 15:30 (GMT), duration : 01:00
Agenda
- Production and calibration status
- FWD software production readiness
- Embedding
- Software status: 32->64b readiness
- NPPS/SDCC news/announcements
- open SDCC tickets
- AOB
FXT 5.75GeV embedding vs data comparison
Updated on Tue, 2025-06-10 15:46. Originally created by petrchal on 2025-06-10 15:46.Talk time : 09:00, Duration : 00:20
K*0 meson directed flow in Au + Au Collisions at 3, 4.5 and 7.7 GeV
Updated on Wed, 2025-06-11 06:10. Originally created by gyz on 2025-06-10 09:35.
Kaon HBT FXT 2nd GPC meeting slides
Updated on Tue, 2025-06-10 05:18. Originally created by lazhang on 2025-06-10 05:18.
D0-jets Prague-Yale conference contribution
Updated on Tue, 2025-06-10 02:06. Originally created by lomicond on 2025-06-10 01:51.