Cu+Cu 200 GeV possible issues

Speaker : Yuri Fisyak ( BNL )


Talk time : 12:10, Duration : 00:10

Year6 p+p (TPC) calibration status

Speaker : Gene Van Buren ( BNL )


Talk time : 12:00, Duration : 00:10

BeamLine Constraint

  • Data from days 73-130 processed (includes first longitudinal polarization period,
    and transverse polarization period, but not second longitudinal period).

  • Studied and verified validity of triggers I used.
  • Identified some problem fills, like:
    1. Fill 7697 (day 93): removing some of the data makes point drop back down; will use
      calib from previous fill

    2. Fill 7712 (day 97): that's all the statistics we have; will use
      calib from next fill

    3. Fill 7786 (day 117): two independent subsets of the data show similar calibs;
      will use the calib found for that fill
  • Discussed volatility during transverse running with a RHIC operator,
    seems not unexpected.

  • Processing of other May longitudinal data progress.

SpaceCharge & GridLeak

  • Calibrations using the May longitudinal polarization dataset is done (without using
    BeamLine Constraint) and is in the DB.
    More details are available pp2006: longitudinal polarization.

  • Distortion is so large without any calibration that tracking is being affected
    (tracks are being split at the gap between inner and outer TPC sectors).

  • Performed checks that BeamLine Constraint does not affect SpaceCharge calibrations,
    and that SpaceCharge does not affect BeamLine calibration.

  • Very close to finishing transverse polarization calibration (one more iteration).
  • Will need to re-calibrate with different beam polarizations/energies

Short in TPC IFC East

  • As You do not have access to view this node, there is a distortion due to an
    electrical short in the TPC IFC East

  • Excess current continues to rise and has exceeded the amount which can be
    explained by bridging a 2 MOhm resistance gap, which most probably isolates it
    to one of the patched 3 MOhm resistance gaps.

  • Jim Thomas and I have discussed how to handle this varying distortion and
    will work on implementing it in the coming weeks.

  • Distortion is not large enough to prevent moving forward with a dEdx calibration.

Gene Van Buren

gene@bnl.gov

Review charges reminder, logistic

Speaker : Myself ( BNL )


Talk time : 17:00, Duration : 00:10
On 5/27/2006 14:50, Timothy Hallman wrote:
Dear STAR Collaborators,

The email concerns an upcoming planning exercise related to
STAR's inner tracking detectors. The review, which will take place
just before the Collaboration meeting (July 7-8) at BNL, will place
particular emphasis on understanding how a plan which optimizes our
physics program in the next few years (including planned upgrades
of STAR's capability) informs the question of future utilization of
the SVT and when it should be taken out of the STAR set-up.

The draft charge for the SVT Review Committee is attached below.
The agenda and the membership of the review panel will be announced
in the coming week.

As a final comment, I would like to thank, in advance, Jerome Lauret,
and Spiros Margetis for organizing the necessary effort for this review, as
well as all the members of the STAR software and SVT analysis teams who
have been working steadily behind the scenes for close to a year now to
produce the necessary understanding to inform this important
discussion.



                               Sincerely,

                               Tim Hallman
Charge to the SVT Review Panel: The charge to the committee is to comment on how a plan which optimizes the scientific output of the STAR Collaboration in the next 3-5 years influences the issue of whether and when the STAR Silicon Vertex Tracker should be removed.

The core physics goals of the STAR Collaboration in the next 3-5 years include:

Planned analysis and who is going to make presentations

Speaker : All ( All )


Talk time : 17:20, Duration : 00:30
It is rather important to both know where people are, if there are problems seen, have a general status and make an assessment of what we can __really__ do/present and the intent from people to do what analysis. Concrete is needed with for objective to draw an agenda.

Comments / questions:

Data set status and location summary

Speaker : Lidia Didenko ( BNL )


Talk time : 17:10, Duration : 00:10

SVT/SSD Review Coordination meeting 7

-00-00
Thursday, 1 January 1970
, at 00:00 (GMT), duration : 00:00
Previous meetings are available at
  1. [node:1297]
  2. [node:1540]
  3. [node:1568]
  4. [node:2299]
  5. [node:2298]
  6. [node:2300]
Attendance: Jamie, Lidia, Gene, Maxim, Rene, Christina, Yuri, Victor and Thomas
Phone: Spiros



TimeTalkPresenter
17:00Review charges reminder, logistic ( 00:10 ) 0 filesMyself (BNL)
17:10Data set status and location summary ( 00:10 ) 0 filesLidia Didenko (BNL)
17:20Planned analysis and who is going to make presentations ( 00:30 ) 0 filesAll (All)

Job tracker progress

Speaker : Valeri Fine ( BNL )


Talk time : 15:30, Duration : 00:10

AOB

Speaker : All ( All )


Talk time : 15:40, Duration : 00:10

Site status

Speaker : All ( All )


Talk time : 15:20, Duration : 00:10
  • PDSF
  • BNL
  • WSU
  • SPU

Follow-ups

Speaker : All ( All )


Talk time : 15:00, Duration : 00:20
  • PDSF "module load" issue
    Discussion on using STAR more specific site_pre_setup.csh and site_post_setup.csh from GROUP_DIR/
  • SRM issues - FZD file transfer failed
    • Did we tested this at WSU
    • Did globus-url-copy worked??
  • BNL add-on to GUMS (Wayne)

Pedestals / Status Tables

Under:

Code for the calculation of the BTOW & BSMD status tables has been made publicly accessible. BTOW status code is in StRoot/StEmcPool/CSMStatusUtils.

Calibrations

Under:

Here you'll find links to calibration studies for the BEMC:

BTOW

2006

SH decomposition in proton-antiproton

Speaker : Hania Gos ( Warsaw University Of Technology, SUBATECH )


Talk time : 15:40, Duration : 00:10

The studies of asymmetry in proton-antiproton correlations

Speaker : Hania Gos ( Warsaw University Of Technology, SUBATECH )


Talk time : 15:30, Duration : 00:10

200412

Topics were
  • Review of run preparation issues and action items
  • Electronic ShiftLog improvements
  • ITTF issue: Action plan to converge fast and efficiently
  • ITTF opened issues seen by all, opinion gathering

200509

Topics were
  • Vacation days issue (overdues and penalties when not declared)
  • Hiring and budget situation
  • Purchase justifications
  • Safety issues at BNL
  • Cyber-security
  • Quality of our data, general QA issues

200510

Agenda was:
  • Feedback on new appraisal Web-based system
  • CHEP06 preparation and who wants to go (or should go)
  • Gene's overview of the TIME05 conference
  • ITD service evaluation survey

200604

Topics were:
  • Team effort reminder - BugTracking use and need to follow up
  • Software and computing papers / publications issues
  • Praveeen farewell party, what does it mean
  • Reactions as per our iterim director

200605

Topic discussed:
  • Summary of past meeting action item status
  • Result from last polls
  • Discussion on paper publication policies
  • UEC voting. Overview and scope.
  • Engaging in outside activity. BNL regulation.

How do you find the frequency of the internal group meeting ?

Adequate
100% (9 votes)
Less often would be best
0% (0 votes)
More often would be good
0% (0 votes)
Total votes: 9