Cu+Cu 200 GeV possible issues
Updated on Wed, 2006-06-07 10:33. Originally created by testadmin on 2006-06-07 10:32.Speaker : Yuri Fisyak ( BNL )
Talk time : 12:10, Duration : 00:10
Year6 p+p (TPC) calibration status
Updated on Wed, 2006-06-07 11:02. Originally created by testadmin on 2006-06-07 10:31.Speaker : Gene Van Buren ( BNL )
Talk time : 12:00, Duration : 00:10
BeamLine Constraint
- Data from days 73-130 processed (includes first longitudinal polarization period,
and transverse polarization period, but not second longitudinal period).
- Studied and verified validity of triggers I used.
- Identified some problem fills, like:
- Fill 7697 (day 93): removing some of the data makes point drop back down; will use
calib from previous fill - Fill 7712 (day 97): that's all the statistics we have; will use
calib from next fill - Fill 7786 (day 117): two independent subsets of the data show similar calibs;
will use the calib found for that fill
- Fill 7697 (day 93): removing some of the data makes point drop back down; will use
- Discussed volatility during transverse running with a RHIC operator,
seems not unexpected. - Processing of other May longitudinal data progress.
SpaceCharge & GridLeak
- Calibrations using the May longitudinal polarization dataset is done (without using
BeamLine Constraint) and is in the DB.
More details are available pp2006: longitudinal polarization. - Distortion is so large without any calibration that tracking is being affected
(tracks are being split at the gap between inner and outer TPC sectors). - Performed checks that BeamLine Constraint does not affect SpaceCharge calibrations,
and that SpaceCharge does not affect BeamLine calibration. - Very close to finishing transverse polarization calibration (one more iteration).
- Will need to re-calibrate with different beam polarizations/energies
Short in TPC IFC East
- As You do not have access to view this node, there is a distortion due to an
electrical short in the TPC IFC East - Excess current continues to rise and has exceeded the amount which can be
explained by bridging a 2 MOhm resistance gap, which most probably isolates it
to one of the patched 3 MOhm resistance gaps. - Jim Thomas and I have discussed how to handle this varying distortion and
will work on implementing it in the coming weeks. - Distortion is not large enough to prevent moving forward with a dEdx calibration.
Gene Van Buren
gene@bnl.gov
Review charges reminder, logistic
Updated on Tue, 2006-06-06 12:57. Originally created by jlauret on 2006-06-06 12:50.Speaker : Myself ( BNL )
Talk time : 17:00, Duration : 00:10
Dear STAR Collaborators, The email concerns an upcoming planning exercise related to STAR's inner tracking detectors. The review, which will take place just before the Collaboration meeting (July 7-8) at BNL, will place particular emphasis on understanding how a plan which optimizes our physics program in the next few years (including planned upgrades of STAR's capability) informs the question of future utilization of the SVT and when it should be taken out of the STAR set-up. The draft charge for the SVT Review Committee is attached below. The agenda and the membership of the review panel will be announced in the coming week. As a final comment, I would like to thank, in advance, Jerome Lauret, and Spiros Margetis for organizing the necessary effort for this review, as well as all the members of the STAR software and SVT analysis teams who have been working steadily behind the scenes for close to a year now to produce the necessary understanding to inform this important discussion. Sincerely, Tim HallmanCharge to the SVT Review Panel: The charge to the committee is to comment on how a plan which optimizes the scientific output of the STAR Collaboration in the next 3-5 years influences the issue of whether and when the STAR Silicon Vertex Tracker should be removed.
The core physics goals of the STAR Collaboration in the next 3-5 years include:
Planned analysis and who is going to make presentations
Updated on Tue, 2006-06-06 14:03. Originally created by jlauret on 2006-06-06 09:37.Speaker : All ( All )
Talk time : 17:20, Duration : 00:30
Comments / questions:
Data set status and location summary
Updated on Tue, 2006-06-06 12:49. Originally created by didenko on 2006-06-06 09:32.Speaker : Lidia Didenko ( BNL )
Talk time : 17:10, Duration : 00:10
SVT/SSD Review Coordination meeting 7
-00-00
Thursday, 1 January 1970
, at 00:00 (GMT), duration : 00:00
, at 00:00 (GMT), duration : 00:00
Previous meetings are available at
Phone: Spiros
- [node:1297]
- [node:1540]
- [node:1568]
- [node:2299]
- [node:2298]
- [node:2300]
Phone: Spiros
Time | Talk | Presenter |
---|---|---|
17:00 | Review charges reminder, logistic ( 00:10 ) 0 files | Myself (BNL) |
17:10 | Data set status and location summary ( 00:10 ) 0 files | Lidia Didenko (BNL) |
17:20 | Planned analysis and who is going to make presentations ( 00:30 ) 0 files | All (All) |
Job tracker progress
Updated on Mon, 2006-06-05 21:24. Originally created by jeromel on 2006-06-05 21:24.AOB
Updated on Mon, 2006-06-05 21:25. Originally created by testadmin on 2006-06-05 21:24.Site status
Updated on Mon, 2006-06-05 21:23. Originally created by jeromel on 2006-06-05 21:22.Reference
Speaker : All ( All )
Talk time : 15:20, Duration : 00:10
- PDSF
- BNL
- WSU
- SPU
Follow-ups
Updated on Mon, 2006-06-05 21:24. Originally created by jeromel on 2006-06-05 21:15.Reference
Speaker : All ( All )
Talk time : 15:00, Duration : 00:20
- PDSF "module load" issue
Discussion on using STAR more specific site_pre_setup.csh and site_post_setup.csh from GROUP_DIR/ - SRM issues - FZD file transfer failed
- Did we tested this at WSU
- Did globus-url-copy worked??
- BNL add-on to GUMS (Wayne)
Pedestals / Status Tables
Updated on Mon, 2009-09-21 07:43 by mattheww. Originally created by kocolosk on 2006-06-03 19:23. Under:Code for the calculation of the BTOW & BSMD status tables has been made publicly accessible. BTOW status code is in StRoot/StEmcPool/CSMStatusUtils.
Calibrations
Updated on Wed, 2009-06-10 15:15. Originally created by kocolosk on 2006-06-03 18:34. Under:Here you'll find links to calibration studies for the BEMC:
BTOW
2006
SH decomposition in proton-antiproton
Updated on Fri, 2006-06-02 08:22. Originally created by hbtuser on 2006-06-02 08:22.Reference
Speaker : Hania Gos ( Warsaw University Of Technology, SUBATECH )
Talk time : 15:40, Duration : 00:10
The studies of asymmetry in proton-antiproton correlations
Updated on Fri, 2006-06-02 08:21. Originally created by hbtuser on 2006-06-02 08:21.Reference
Speaker : Hania Gos ( Warsaw University Of Technology, SUBATECH )
Talk time : 15:30, Duration : 00:10
200412
Topics were
- Review of run preparation issues and action items
- Electronic ShiftLog improvements
- ITTF issue: Action plan to converge fast and efficiently
- ITTF opened issues seen by all, opinion gathering
200509
Topics were
- Vacation days issue (overdues and penalties when not declared)
- Hiring and budget situation
- Purchase justifications
- Safety issues at BNL
- Cyber-security
- Quality of our data, general QA issues
200510
Agenda was:
- Feedback on new appraisal Web-based system
- CHEP06 preparation and who wants to go (or should go)
- Gene's overview of the TIME05 conference
- ITD service evaluation survey
200604
Topics were:
- Team effort reminder - BugTracking use and need to follow up
- Software and computing papers / publications issues
- Praveeen farewell party, what does it mean
- Reactions as per our iterim director
200605
Topic discussed:
- Summary of past meeting action item status
- Result from last polls
- Discussion on paper publication policies
- UEC voting. Overview and scope.
- Engaging in outside activity. BNL regulation.
How do you find the frequency of the internal group meeting ?
Adequate
100% (9 votes)
Less often would be best
0% (0 votes)
More often would be good
0% (0 votes)
Total votes: 9