Run 9 BSMD Calibration

Under:

Parent page for BSMD Run 9 Calibration

Run 8 BPRS Calibration

Under:

Parent for Run 8 BPRS Calibration done mostly by Jan

Preliminary Cross Section Plot

 The proposed final version of the cross section plot would look like this.

 

Run 9 BPRS Calibration

Under:

Parent for Run 9 BPRS Calibration

Run 9 BTOW Calibration

Under:

Parent page for BTOW 2009 Calibrations

Run9 BTOW HV Mapping Analysis - Summary

This page outlines all the towers that have been swapped in the Run9 BTOW HV Mapping analysis (cellID->softID mapping).

PID v_2 and v_4 from Au+Au Collisions at 200GeV at RHIC

Correcting for Z-Vertex Variation in Two Particle Number Correlations

Speaker : Larry Tarini ( Wayne State )


Talk time : 10:00, Duration : 00:20

J/psi  production in minimum-bias d+Au collisions at sNN =200 GeV in STAR

Speaker : Chris Powell ( LBL )


Talk time : 17:00, Duration : 00:20

Rho0 vector meson production in CuCu collisions@200 & 62.4 GeV data at RHIC

Speaker : Prabhat Pujahari ( IITB )


Talk time : 16:40, Duration : 00:20

Phi meson production and Cronin effect in d+Au collisions

Speaker : Chitrasen Jena ( LBL/IOPB )


Talk time : 16:20, Duration : 00:20

Phi meson measurements via K+K- and e+e- decays in run8 d+Au 200GeV collisions

Speaker : Xiaoping Zhang


Talk time : 16:00, Duration : 00:20

Coffee break

STAR's Near Future Physics Program

Quark-Gluon Plasma in QCD, at RHIC, and in String Theory

Speaker : Krishna Rajagopal


Talk time : 14:00, Duration : 01:00

Lunch and Post doc panel

Local Polarimetry at STAR


Talk time : 00:00, Duration : 00:00

Physics  in Ultra Peripheral Collisions at STAR


Talk time : 00:00, Duration : 00:00

The STAR W Program


Talk time : 00:00, Duration : 00:00

Coffee break


Talk time : 00:00, Duration : 00:00