IST electronics

Speaker : G.Visser ( IUCF )


Talk time : 12:10, Duration : 00:30

The Intermediate Silicon Tracker

Speaker : Gerrit van Nieuwenhuizen ( MIT )


Talk time : 11:40, Duration : 00:30

Inner support cylinder

Speaker : E.Anderssen ( LBNL )


Talk time : 11:20, Duration : 00:20

Break


Talk time : 11:10, Duration : 00:10

pixel electronics

Speaker : L.Greiner ( LBNL )


Talk time : 10:30, Duration : 00:40

pixel mechanics

Speaker : H.Wieman ( LBNL )


Talk time : 09:50, Duration : 00:40

Beam Pipe

Speaker : Dana Beavis ( BNL )


Talk time : 09:30, Duration : 00:20

Overview, layout and requirements

Speaker : H.G.Ritter ( LBNL )


Talk time : 09:00, Duration : 00:30

HFT design review; internal

2009-03-25 00:00
Etc/GMT-5
Wednesday, 25 March 2009
BNL- physics department 2-84, at 04:00 (GMT), duration : 00:00

  

09:00            20+10            Overview, layout, Requirements                                                HG Ritter

09:30            10+10            Beam Pipe                                                                                    D. Beavis

09:50            30+10            Pixel mechanics                                                                        H. Wieman

10:30            30+10            Pixel electronics                                                                        L. Greiner

11:10            Break

11:20            10+10            Inner Support Cylinder                                                            E. Anderssen

11:40            20+10            IST Mechanics                                                                        G vanNieuwenhuisen           

12:10            20+10            IST Electronics                                                                        G. Visser

12:40            Lunch

 

14:00            20+10            SSD Mechanics                                                                        E. Anderssen

14:30            20+10            FGT, Requirements and Mechanics                                           J. Kelsey

15:00            20+10            Cone replacement structures                                                    J. Kelsey

15:30            20+10            Low mass services for SSD and FGT                                          G. Visser

16:00            Break

16:20            30+10            SSD Electronic                                                                          M. Levine & C.Renard

17:00            40+10            Integration and assembly overview                                            E. Anderssen         

17:50            adjourn

TimeTalkPresenter
09:00Overview, layout and requirements ( 00:30 ) 1 fileH.G.Ritter (LBNL)
09:30Beam Pipe ( 00:20 ) 1 fileDana Beavis (BNL)
09:50pixel mechanics ( 00:40 ) 1 fileH.Wieman (LBNL)
10:30pixel electronics ( 00:40 ) 1 fileL.Greiner (LBNL)
11:10Break ( 00:10 ) 0 files
11:20Inner support cylinder ( 00:20 ) 1 fileE.Anderssen (LBNL)
11:40The Intermediate Silicon Tracker ( 00:30 ) 1 fileGerrit van Nieuwenhuizen (MIT)
12:10IST electronics ( 00:30 ) 1 fileG.Visser (IUCF)
12:40LUNCH ( 01:20 ) 0 files
14:00SSD Mechanics ( 00:30 ) 1 fileE. Anderssen
14:30FGT requirements ( 00:30 ) 1 fileJ. Bessuille
15:00Cone Replacement ( 00:20 ) 1 fileJ.kelsey (MIT)
15:30Low Mass Service for SSD and FGT ( 00:30 ) 1 fileG.Visser
16:00Break ( 00:20 ) 0 files
16:20SSD electronics ( 00:40 ) 2 filesM. LeVine/C. Renard
17:00Integration and assembly overview ( 00:50 ) 1 fileE.Anderssen

Trigger Bias Redux

  1. Calculate MC asymmetry for reconstructed tracks matched to GEANT pions in events passing MB trigger.

  2. Do the same for events passing JP2 trigger.

mktxt2005.txt

Under:
#!/bin/csh

set sdir = ./StarDb/Calibrations/rhic
set tdir = ./txt
set files = `ls -1 $sdir/*.C`
set vs = (x0 err_x0 y0 err_y0 dxdz err_dxdz dydz err_dydz stats)
set len = 0
 

queryNevtsPerRun.txt

Under:
-- N evts per run, where N is the numerator at the end of the last line

select floor(bi.blueFillNumber) as fill,
sum(ts.numberOfEvents/ds.numberOfFiles) as gdEvtPerFile,
 

Run 5

2005 Beamline Calibration

Information about how this calibration is done, and links to other years, can be found You do not have access to view this node.

Run 6 (pp)

 

Run 4 (pp)

 

Run 2 (200 GeV pp)

Finding primary vertex seeds

What is done to find the seeds

Pass 1

In this pass, the seed finding was done on a per-run basis.

Run 3 (200 GeV dAu and pp)