Slides for P. Pile Meeting, Tuesday, April 07, 2009

  Slides for P. Pile Meeting, Tuesday, April 07, 2009

 

Analyzing ZDC Data after Spin Rotator Changes

Introduction

 

scheduler tricks

  1.  To see full details of the job que do:
    • condor_q -long -submitter balewski
  2. To

TPC QA, 500 GeV pp

  1. TPC performance. L2W-tagged events, day 92,93,94. Only primary vertex, only prim tracks.

New endcap tower FEE ped4 files (4/6/09)

I have created new endcap tower FEE ped4 files using the L2ped output from run 10095057.

BTOW Calibration Uncertainty Update

Summary

AOB

Speaker : everyone


Talk time : 11:55, Duration : 00:05

Optimum Geometry of the ladders on the cone

Speaker : Howard M.


Talk time : 11:45, Duration : 00:10

Action Items from the review

Speaker : Howard M.


Talk time : 11:35, Duration : 00:10
  1. Leakage current as a function of time and temperature

Impressions on the HFT review

Speaker : Everyone


Talk time : 11:25, Duration : 00:10

RDO board status

Speaker : Micheal L.


Talk time : 11:15, Duration : 00:10

Ladder board status

Speaker : Christophe R.


Talk time : 11:05, Duration : 00:10

News

Speaker : Howard M.


Talk time : 11:00, Duration : 00:05

SSD biweekly meeting 1-510-486-7333

2009-04-08 11:00
2009-04-08 12:00
Etc/GMT-4
Wednesday, 8 April 2009
, at 15:00 (GMT), duration : 01:00
TimeTalkPresenter
11:00News ( 00:05 ) 0 filesHoward M.
11:05Ladder board status ( 00:10 ) 0 filesChristophe R.
11:15RDO board status ( 00:10 ) 0 filesMicheal L.
11:25Impressions on the HFT review ( 00:10 ) 0 filesEveryone
11:35Action Items from the review ( 00:10 ) 0 filesHoward M.
11:45Optimum Geometry of the ladders on the cone ( 00:10 ) 0 filesHoward M.
11:55AOB ( 00:05 ) 0 fileseveryone
12:03When did the Capacitors Failed ( 00:20 ) 0 filesVi Nham

Towards run9 Production and Analysis

This is an expanded list of duties/commitments to  that should be performed in order to expedite the production and analysis of this year's data.

Spin Physics PWG meeting

2009-04-02 12:00
2009-04-02 13:30
Etc/GMT-4
Thursday, 2 April 2009
phone 877-674-0006 1 077795# 1, at 16:00 (GMT), duration : 01:30

 Agenda may be found here

 

03 periodic summary of all acquired events

Under:

att 1) all W-events for ~300K from days 76-89

att 2) one fill from day 83, 34K W-events, I think BPRS peds were not subtracted for some runs, page 7 

BPRS QA, pp 500 run, 2009

 Loose notes about BPRS, 2009 run, pp 500 

  1. Inclusive ADC spectra for BPRS, only L2W-triggered events (2x2 cluster ET>13 GeV) are

2009 500GeV Luminosity Calculation

I ran over a runlist provided by Jan:
/star/u/balewski/2009-march-bnl/4bernd/d76-89.runsOnly (attached below)

Slides for P. Pile Meeting, Tuesday, March 31, 2009

  Slides for P. Pile Meeting, Tuesday, March 31, 2009