Embedding opened requests and problem summary
Updated on Wed, 2009-07-15 09:24 by testadmin. Originally created by jeromel on 2009-07-15 09:23.Speaker : Andrew Rose ( LBNL )
Talk time : 12:00, Duration : 00:20
Software and Computing phone meeting
1-189, EVO, at 16:00 (GMT), duration : 01:00
Time | Talk | Presenter |
---|---|---|
12:00 | Embedding opened requests and problem summary ( 00:20 ) 0 files | Andrew Rose (LBNL) |
12:20 | TRS tuning, status and path forward ( 00:10 ) 0 files | Yuri Fisyak (BNL) |
12:30 | Simulation issues ( 00:10 ) 0 files | Victor Perevoztchikov (BNL) |
12:40 | Review of production space, data samples and cleanup ( 00:10 ) 0 files | Lidia Didenko (BNL) |
12:50 | AOB ( 00:10 ) 0 files | All (All) |
Cluster analysis Progress
Updated on Tue, 2009-07-14 16:51. Originally created by aschille on 2009-07-14 16:51.
Physics parameters set in MC
Updated on Wed, 2009-07-15 14:34. Originally created by jwebb on 2009-07-14 12:36.Call GPHYSI()
* Special TPAR for TMED 12 ECAL_CPOLYSTYREN *
* ------------------------- *
2009 Spin QA: 200GeV
Updated on Wed, 2009-08-26 13:35. Originally created by pagebs on 2009-07-13 17:45.2009 Spin QA: 200GeV
Joint session with lfspectra to discuss the embedding status
Updated on Mon, 2009-07-13 16:42. Originally created by dongx on 2009-07-13 16:42.Reference
Speaker : All ( all )
Talk time : 10:45, Duration : 01:30
STAR Management Meeting
BNL, 50-Orange Room, at 15:00 (GMT), duration : 01:00
EVO: Title: STAR Management Meeting // Community: STAR // Password: star
Phone Bridge: +1 626 395 2112 (CA) / +1 631 344 6100 (NY) // ID: 923442 // Password: 0952
Time: 11am - 12noon EDT
* --===================================================================--*
Agenda:
1) NPE and e-h Results, publications - Huan, Bedanga, ...
2) The next STAR Decadal Plan - Nu
3) AOB
* --====================================================================--*
Brief Summary: 0) Attendency: Olga, Jerome, Jamie, Flemming, Helen, Xin, Nu, Bedanga
1) NPE issues: (i) The management feels there more issues to be addressed by the task force. Based on the discussion and Huan's report at the last
Analysis Meeting, the management will send a note to the task force. A list of specific checks will be included in the note. (ii) WIll send a message to
Editor at PRL regarding STAR paper "Charmed hadron production at low transverse momentum in Au+Au collisions at RHIC" submitted on May
4th, 2008, 0805.0364. Inform the Editor that we are doing internal cross-checks and the process may take sometime to complete.
2) S&T review issues: (i) Timely funding and scheduling for R&D at RHIC. RHIC performance for polarized pp collisions, we will request 30 cryo-weeks for
future runs; (ii) TPC: operation team including software issue. Jim should be part of the solution; (iii) FTPC team: A student from India group (VECC),
with the help of Terry, J. Syboth and P. Syboth; (iv) Future upgrade scheduling and integrations.
3) QM09 Proceedigns: potential issues with the eta/s analysis (BulkCorr) and Jet reconstruction (JetCorr).
Notes:
1) STAR TPC Review (key= star2009), June 4,5, BNL. Ron Settler (chair). Review report.
2) NPE Committee, H. Huang (chair)
Future Meetings:
1) BNL Science and Technology Review, July 22-24, BNL
2) STAR ToF Closeout Review, Aug. 10-11, BNL
3) STAR Regional meeting: Sept. 25-26, Rio, Brazil
4) SQM2009: Sept. 27-Oct. 2, Buzios, Brazil
5) STAR Collaboration meeting, Oct. 5-10, Berkeley
6) DNP 2009, Oct. 13 - 17, Waikoloa
Strips With Very Few Entries
Updated on Fri, 2009-07-10 13:29. Originally created by wleight on 2009-07-10 10:34.Some strips in module 103p have very few entries, e.g. strip 15407p:
Figure 1: Strip 15407p
AOB & Discussion
Updated on Thu, 2009-07-09 21:11. Originally created by videbaks on 2009-07-09 21:11.Reference
Speaker : All
Talk time : 11:00, Duration : 00:20
SSD/FGT cable interface
Updated on Fri, 2009-07-10 08:09 by matis. Originally created by videbaks on 2009-07-09 21:10.Reference
Speaker : Howard Matis
Talk time : 10:40, Duration : 00:20
FGT status - Assembly and installation schedule - Needs at BNL
Updated on Fri, 2009-07-10 09:15 by surrow. Originally created by videbaks on 2009-07-09 21:09.Reference
Speaker : Bernd Surrow
Talk time : 10:20, Duration : 00:20
Cones, models and analysis
Updated on Fri, 2009-07-10 08:11 by matis. Originally created by videbaks on 2009-07-09 21:07.Reference
Speaker : Jason Bessuilie
Talk time : 10:00, Duration : 00:20
Plan for insertion and extract of pixel in HFT
Updated on Thu, 2009-07-09 21:05. Originally created by videbaks on 2009-07-09 21:05.Reference
Speaker : Howard Weiman
Talk time : 09:40, Duration : 00:20
Assembly plan for beampipe, cone and detectors
Updated on Thu, 2009-07-09 21:00. Originally created by videbaks on 2009-07-09 21:00.Reference
Speaker : Eric Anderssen
Talk time : 09:10, Duration : 00:30
introduction : HFT status & schedule
Updated on Fri, 2009-07-10 08:07. Originally created by videbaks on 2009-07-09 20:58.Reference
Speaker : F.Videbaek
Talk time : 09:00, Duration : 00:10
Introduction : HFT status & schedule
Updated on Thu, 2009-07-09 20:54. Originally created by videbaks on 2009-07-09 20:54.Reference
Speaker : F.Videbaek
Talk time : 09:00, Duration : 00:05
QM09 proceeding, fourth version
Updated on Thu, 2009-07-09 10:05. Originally created by bbiritz on 2009-07-09 10:05.Hi All,
I have made the modifications to my QM09 proceeding recommended by Xin. Comments are suggestions are welcome.
Bertrand
J/psi from HLT
Updated on Wed, 2009-07-08 21:37. Originally created by dongx on 2009-07-08 21:37.Reference
Speaker : Hao Qiu ( IMP )
Talk time : 18:20, Duration : 00:20
Update on High xF J/psi
Updated on Wed, 2009-07-08 21:36. Originally created by dongx on 2009-07-08 21:36.Reference
Speaker : Chris Perkins ( UC Berkeley )
Talk time : 18:00, Duration : 00:20