STAR Collaboration Meeting (Fall 2009 LBL)
Updated on Fri, 2009-09-04 08:55. Originally created by sowinski on 2009-09-03 17:38.Lawrence Berkeley Laboratory
Hans Georg Ritter - Local Chair
Jim Sowinski - Chair program committee
Meeting of the Collaboration
Meeting website
vernier scan fit implementation
Updated on Thu, 2009-09-03 12:49. Originally created by rcorliss on 2009-09-03 12:23.My code as written is producing unrealistically small cross sections, so I wanted to explicitly write out the way I'm performing the fit:
2009 Walgo data results
Updated on Fri, 2009-09-04 09:26. Originally created by seelej on 2009-09-03 10:13.Uber-preliminary run9 results
Discussion on documents and issues for CD-1
Updated on Wed, 2009-09-02 18:39. Originally created by videbaks on 2009-09-02 18:39.Reference
Speaker : All
Talk time : 15:00, Duration : 02:00
Discussion on Document status, cost& schedule, management as needed for CD-1 review documents.
HFT Physics
Updated on Tue, 2009-09-08 13:08 by margetis. Originally created by videbaks on 2009-09-02 18:36.Break
Updated on Wed, 2009-09-02 18:33. Originally created by videbaks on 2009-09-02 18:33.Reference
Talk time : 10:30, Duration : 00:20
Pixel detector
Reference
Speaker : Howard Wieman ( LBL )
Talk time : 09:45, Duration : 00:45
Pixel detector sub-system:
mechanical and electric
Project Overview
Reference
Speaker : Flemming Videbaek ( BNL )
Talk time : 09:00, Duration : 00:45
Introduction to meeting;
Version 0 of CD-1 review talk
HFT meeting
room 3-192 Physics, BNL, at 13:00 (GMT), duration : 00:00
HFT pre-dry run.
The meeting will have a number of talks that matches those for the CD-1 review of the HFT project.
In addition there will be discussion on outstanding issues surrounding CDR, other document, cost and schedule.
A real dry-run will be scheduled in about one month; and the review likely in the week of November 9.
Time | Talk | Presenter |
---|---|---|
09:00 | Project Overview ( 00:45 ) 1 file | Flemming Videbaek (BNL) |
09:45 | Pixel detector ( 00:45 ) 1 file | Howard Wieman (LBL) |
10:30 | Break ( 00:20 ) 0 files | |
10:50 | SSD electronics Upgrade ( 00:45 ) 1 file | Micheal LeVine (BNL) |
11:35 | IST sub-system ( 00:45 ) 0 files | Bernd Surrow (MIT) |
13:30 | HFT Physics ( 00:45 ) 2 files | Nu Xu (LBL) |
14:15 | Global Support Structure, Assembly, and installation ( 00:45 ) 1 file | Eric Anderssen (LBL) |
15:00 | Discussion on documents and issues for CD-1 ( 02:00 ) 0 files | All |
Test of corrected EEMC geometry: pion reconstruction
Updated on Fri, 2009-09-04 14:19. Originally created by stevens4 on 2009-09-02 09:47.Test of Corrected EEMC geometry: Pion Reconstruction
Preview efficiencies from pre-production SL09b/W
Updated on Wed, 2009-09-02 09:14 by balewski. Originally created by jeromel on 2009-09-02 09:08.Speaker : Jan Balewski ( MIT )
Talk time : 12:40, Duration : 00:10
AOB
Updated on Wed, 2009-09-02 09:09 by testadmin. Originally created by jeromel on 2009-09-02 08:35.Speaker : All ( All )
Talk time : 12:50, Duration : 00:10
The last You do not have access to view this node
We will expand on it adding
Embedding progress overview, opened problems
Updated on Wed, 2009-09-02 09:38 by rfatemi. Originally created by jeromel on 2009-09-02 08:33.Speaker : Renee Fatemi ( UKY )
Talk time : 12:20, Duration : 00:20
Calibration progress and overview for Run 9
Updated on Wed, 2009-09-02 10:51 by genevb. Originally created by jeromel on 2009-09-02 08:32.Speaker : Gene Van Buren ( BNL )
Talk time : 12:00, Duration : 00:20
Software and Computing phone meeting
1-189, EVO, at 16:00 (GMT), duration : 01:00
Time | Talk | Presenter |
---|---|---|
12:00 | Calibration progress and overview for Run 9 ( 00:20 ) 1 file | Gene Van Buren (BNL) |
12:20 | Embedding progress overview, opened problems ( 00:20 ) 1 file | Renee Fatemi (UKY) |
12:40 | Preview efficiencies from pre-production SL09b/W ( 00:10 ) 1 file | Jan Balewski (MIT) |
12:50 | AOB ( 00:10 ) 0 files | All (All) |
First draft of bins for theory analysis of delta G projected data
Updated on Tue, 2009-09-01 23:33. Originally created by sowinski on 2009-09-01 23:33.attached is a file describing suggested bins for Werner Daniel et al
to set up for projected data sets in their global fitting code.
FGT safety review - electrical - 9/2/2009
Updated on Tue, 2009-09-01 21:05. Originally created by gvisser on 2009-09-01 21:05.Here is the presentation and a zipfile of documentation, for the electrical aspects of the FGT, to be presented 9/2/2009.