Year 2011 geometry status and production intents for Y11

Speaker : Jason Webb ( BNL )


Talk time : 12:20, Duration : 00:15
Simulation Requests
  • Requests in motion

Multi-site Data transfer project - status

Speaker : Michal Zerola ( NPI / ASCR )


Talk time : 12:00, Duration : 00:20

Software and Computing phone meeting

2010-12-15 12:00
2010-12-15 13:00
America/New York
Wednesday, 15 December 2010
1-189, EVO, at 17:00 (GMT), duration : 01:00
TimeTalkPresenter
12:00Multi-site Data transfer project - status ( 00:20 ) 1 fileMichal Zerola (NPI / ASCR)
12:20Year 2011 geometry status and production intents for Y11 ( 00:15 ) 0 filesJason Webb (BNL)
12:35Production status and stats ( 00:15 ) 0 filesJerome Lauret (BNL)
12:50AOB ( 00:10 ) 0 filesAll (All)

SSD Phone Meeting

2010-12-14 08:00
America/Los Angeles
Tuesday, 14 December 2010
1 510 486 7333 - 8 AM PST, at 13:00 (GMT), duration : 00:00

News   -   Howard

Ladder Board Testing and RDO FPGAs - Christophe

Ladder Board Assembly and RDO Board - Micheal

Cooling Cost and Schedule -  Jim

Project Cost and Schedule - Howard

Should Nu and/or Flemming visit SUBATECH?

Next meeting date

Run 11 preparation meeting #5

2010-12-10 14:00
2010-12-10 15:00
America/New York
Friday, 10 December 2010
1-189, at 19:00 (GMT), duration : 01:00

Attendees: Leve H., Dmitry A., Jérôme L., Wayne B., Gene V.B., Jeff L.

 

Minutes:

Databases [Dmitry]:

  • Conditions collectors started (all except beam information related ones)
    • Everything running appears to be OK and status can be checked from web
    • Beam info needs cdev, provided by C-AD once their operations get going for the Run (also includes magnetic field setting; expect data around the time we turn on the STAR magnet)
      • Absence of this data means RunLog does not finalize runs and information is not migrated to Offline, but this is expected to be OK for now for anyone doing online-only tests (requested to post a note to rts-hn about this)
    • No migration issues expected, but TPC anode voltage recording practices need to be ironed out in the context of the Run 11 data (discuss with Maxim)
  • Online DBs flushed
    • As expected, a few failed links and missing web pages were noted (by users too) and fixed
  • Once cdev is running, will be ready for turn on / testing of FastOffline

 

ShiftLog [Leve]:

  • As expected, excluded from and not affected by DB flush
  • Manual updated for instructions on changing run status (may receive further review & changes from Jerome)

 

Online nodes [Wayne]:

  • AFS has been stable on the newer evp machine since last Friday
    • Jeff's been using the machine (and AFS) without incident
    • Will likely switch OnlinePlots back to this machine (from evp2, the older machine) next week
      • Documentation requested for switching between these machines
  • Replacement of dean at the stage of OS installation on new hardware
    • Timeline for replacement should be well before Run starts, as disk space on the new machine has been requested for online use
  • Trigger commissioning is a high priority part of the request for online node resources (Wayne will contact Pibero directly)
  • Nothing to report on OS upgrades

 

Online QA - jevp demo [Jeff]:

  • Code
    • Subsystems have an xxxBuilder class (e.g. tpcBuilder, eemcBuilder, etc.) which inherits from a jevp base class for plots
    • Plot objects can have multiple histograms added to them, as well as other graphical objects like lines and circles (as long as they are of some "component" type?)
  • Configuration
    • Editor allows hierarchical arrangement of plots into tabs and sub-tabs, under larger Sets (e.g. Shift, 2009, ESMD)
      • Features drag & drop for re-arrangement
    • Tabs can have collective properties for all plots underneath (such as setting all to have the same maximum)
    • Plots can have individual properties (such as log y scale)
  • Running
    • One server starts up several builders as separate processes
    • Data is sent to the builders from a file or an event pool
    • Presenter runs separately to display plots
      • Similar basic look & feel to current OnlinePlots presenter
      • Clicking on a plot brings up a reference side-by-side
        • Drag & drop to add new reference, or select a different reference from panel of choices
        • Suggested: tag references with run from which they're made, and timestamp (already includes a comment)
        • Deleting references is simple, but not so simple as to be done accidentally
        • Mild concerns to be wary of reference bloat and organization as things evolve at the experiment (including collision species/energies change)
    • PDFs generated and uploaded to RunLog DB for each Set
      • Include table of contents
      • Concerns of space this will consume on the onldb server and redundancy of plots
        • Run 10 PDFs used more than half the available disk space, and it is reasonable to expect a doubling (or more) of the required space for Run 11
        • Wayne & Dmitry will assess the current storage on onldb [post-meeting statement that space may be fine; follow up next week]
        • Requirements still need to be more accurately defined
          • Will depend on what gets axed/kept from review by subsystems & trigger board
          • Would be helped by real data, but that's a bit late

Next week: demo of Offline QA for AutoQA with reference histograms [Gene]

StV0TofCorrection Class

Speaker : Patrick Huck


Talk time : 10:40, Duration : 00:10

TOF vs TPC PID in BES fluctuations

Speaker : Hui Wang / Terry Tarnoswky


Talk time : 10:20, Duration : 00:20

 Slides from BES meetings:

http://drupal.star.bnl.gov/STAR/system/files/STAR_Collab_Meeting_Nov_2010.pdf

TOF PID study

Speaker : Masa Wada


Talk time : 10:00, Duration : 00:20

See  http://drupal.star.bnl.gov/STAR/blog/masayuki/2010/dec/08/tof-time-resolution-model

 

http://www.star.bnl.gov/protected/lfspectra/yfzhang/hft/upgr15/cd2/QA/

Speaker : Yifei Ds QA


Talk time : 14:50, Duration : 00:20

QA of the new Ds production

Speaker : Gang Wang


Talk time : 14:30, Duration : 00:20

HFT Software

2010-12-10 13:30
America/New York
Friday, 10 December 2010
510-4867333, at 18:30 (GMT), duration : 00:00
TimeTalkPresenter
14:30QA of the new Ds production ( 00:20 ) 1 fileGang Wang
14:50http://www.star.bnl.gov/protected/lfspectra/yfzhang/hft/upgr15/cd2/QA/ ( 00:20 ) 0 filesYifei Ds QA

AOB

Speaker : All ( All )


Talk time : 12:35, Duration : 00:20

 

Production status

Speaker : Lidia Didenko ( BNL )


Talk time : 12:20, Duration : 00:15

                              Production Sta

Summary of the h+/h- meeting

Speaker : Grant Webb ( UKY )


Talk time : 12:00, Duration : 00:20

See You do not have access to view this node

 

Software and Computing phone meeting

2010-12-08 12:00
2010-12-08 13:00
America/New York
Wednesday, 8 December 2010
1-189, EVO, at 17:00 (GMT), duration : 01:00
TimeTalkPresenter
12:00Summary of the h+/h- meeting ( 00:20 ) 0 filesGrant Webb (UKY)
12:20Production status ( 00:15 ) 0 filesLidia Didenko (BNL)
12:35AOB ( 00:20 ) 0 filesAll (All)

Adjourn


Talk time : 17:40, Duration : 00:00

Integration Technical

Speaker : Eric Anderssen


Talk time : 17:20, Duration : 00:20

SSD technical

Speaker : Micheal LeVine


Talk time : 17:00, Duration : 00:20

IST technical

Speaker : Gerrit van Nieuwenhuizen


Talk time : 16:40, Duration : 00:20

PXL technical

Speaker : Leo Greiner


Talk time : 16:20, Duration : 00:20