pp2pp analysis

2011-10-19 10:00
2011-10-19 12:00
America/New York
Wednesday, 19 October 2011
1-189 Physics, at 14:00 (GMT), duration : 02:00
TimeTalkPresenter
09:00Crossing angle from y vs x ( 00:20 ) 1 fileWlodek
09:20follow-up on position vs angle at RP's plots ( 00:20 ) 1 filePhil Pile

pp2pp analysis

2011-10-12 10:00
2011-10-12 12:00
America/New York
Wednesday, 12 October 2011
1-189 Physics, at 14:00 (GMT), duration : 02:00
TimeTalkPresenter
10:00Crossing angle ( 00:30 ) 1 fileWlodek
10:30follow-up on angle-position study at RP4 for Blue Beam ( 00:20 ) 0 filesPhil Pile

pp2pp analysis

2011-10-05 10:00
2011-10-05 12:00
America/New York
Wednesday, 5 October 2011
1-189 Physics, at 14:00 (GMT), duration : 02:00
TimeTalkPresenter
10:00Final re-alignment... ( 00:20 ) 0 filesIgor
10:20Fiducial cuts revisited ... ( 00:20 ) 1 fileKin Yip
10:40End game ( 00:20 ) 0 filesAll

pp2pp analysis

2011-09-28 10:00
2011-09-28 12:00
America/New York
Wednesday, 28 September 2011
1-189 Physics, at 14:00 (GMT), duration : 02:00

pp2pp analysis

2011-10-26 10:00
2011-10-26 12:00
America/New York
Wednesday, 26 October 2011
1-189 Physics, at 14:00 (GMT), duration : 02:00

Title: pp2pp

Description: pp2pp analysis meeting
Community: STAR
Password: elasticpp

Meeting Access Information:
- Meeting URL

http://evo.caltech.edu/evoNext/koala.jnlp?meeting=eseieIvnveauaaIua8Is

- Password: elasticpp
- Phone Bridge
ID: 11 0521
Password: 5158

TimeTalkPresenter
10:00Results with latest alignment and crossing angle ( 00:40 ) 1 fileKin
10:40Crossing angle vs offset at the RP ( 00:20 ) 1 fileWlodek
11:00Naive alignment considerations ( 00:05 ) 1 fileIgor Alekseev (ITEP)

pp2pp analysis

2011-09-21 10:00
2011-09-21 12:00
America/New York
Wednesday, 21 September 2011
1-189 Physics, at 14:00 (GMT), duration : 02:00
TimeTalkPresenter
10:00Updates on field strength and more... ( 00:30 ) 1 filePhil
10:30Crossing angle effect ( 00:20 ) 1 fileWlodek
10:50Estimating overall systematic uncertainties ( 00:20 ) 1 fileJH
11:10Updates ( 00:20 ) 1 fileKin Yip

pp2pp analysis

2011-09-14 10:00
2011-09-14 12:00
America/New York
Wednesday, 14 September 2011
1-189 Physics, at 14:00 (GMT), duration : 02:00

Minutes


Talk time : 12:35, Duration : 00:20

rho meson embedded in zerobias data UPC studies

Request TypeSimulated background embedding (generator with real data as background for noise / pile-up studies)
Description

Rho mesons generated with starlight embedded in zerobias data events from run 10 Au+Au at 200 GeV

General Information
Request ID20113601
Priority: EC0
Priority: pwgNormal
StatusClosed
Physics Working GroupPeripheral collisions
Requested byramdebbe and janet seger
Contact email(s)debbe@rcf.rhic.bnl.gov
Contact phone(s)631 344 4571
PWG email(s)starupc-hn@www.star.bnl.gov
Assigned Deputy: Not assigned
Assigned Helper: Not assigned
Global Simulation Settings
Request type:Simulated background embedding (generator with real data as background for noise / pile-up studies)
Number of events1000000 = 1000 K
Magnetic FieldFull-Field
Collision Typeauau 200GeV
Centralityperipheral
BFC tags
ProductionP10ik
Geometry: simuy2010b
Geometry: recoy2010a
Library---- SELECT STAR LIBRARY ----
Vertex option---- SELECT VERTEX OPTION ----
Pileup optionNo
Detector Set
Data Sources
Real Data
File lookupzerobias run 10 Au+Au 200GeV preferably low multiplicity events.
Single Particle MC
ParticleAlpha
Particle settingsdalitz
Particles per event1
Vertex Z, cm-30 < Vertex < 30
Gaussian sigma in X,Y,Z (cm), if applicable0, 0, 0
Vertex offset: x, mm0
Vertex offset: y, mm0
Φ (phi), radian0 < Φ < 6.29
η (eta)-0.5 < η < 0.5
Pt, GeV0 < Pt < 30

print out of minimc file

Speaker : jonathan


Talk time : 12:30, Duration : 00:05
  1. generalities about minimc files : here 

HFT Software

2011-09-09 13:30
America/New York
Friday, 9 September 2011
510-4867333, at 17:30 (GMT), duration : 00:00

* Software-day is September-26 @ BNL

*  Preparation work for the Software meeting

* AOB

TimeTalkPresenter
12:30print out of minimc file ( 00:05 ) 4 filesjonathan
12:35Minutes ( 00:20 ) 1 file

Turtle-Data Yellow DRAFT

Speaker : Phil Pile


Talk time : 10:00, Duration : 00:20

pp2pp special

2011-09-07 10:00
2011-09-07 12:00
America/New York
Wednesday, 7 September 2011
1-189, at 14:00 (GMT), duration : 02:00

1. Explanation and discussion of Igor's alignment - Igor + all

2. TURTLE comparison - Phil

3. The next step, reconcile the two - All

The Evo booking is below, as is the Drupal link in case you wanted to post something
 

Title: pp2pp special
Description:
Community: STAR
Password: pp2ppweekly

Meeting Access Information:
- Meeting URL
http://evo.caltech.edu/evoNext/koala.jnlp?meeting=MMMeMn2v2aDIDs9D98D29M

- Password: pp2ppweekly
- Phone Bridge
ID: 397 0344
Password: 3964

Eastern Daylight Time (-0400)
Start 2011-09-07  10:00
End   2011-09-07  12:00

EVO Phone Bridge Telephone Numbers:
---------------
- USA (Caltech, Pasadena, CA)
+1 626 395 2112

 
TimeTalkPresenter
10:00Turtle-Data Yellow DRAFT ( 00:20 ) 1 filePhil Pile

Summer 2011 BNL local group presentations #10: FMS-EEMC azimuthal correlations in pp and dAu

2011-09-07 15:00
2011-09-07 16:00
America/New York
Wednesday, 7 September 2011
2-160, at 19:00 (GMT), duration : 01:00

Presenter: Xuan Li, Shandong University

 

Summer 2011 BNL local group presentations #9, Measurement of J/psi Elliptic Flow @ STAR

2011-08-31 15:00
2011-08-31 16:00
America/New York
Wednesday, 31 August 2011
2-160, at 19:00 (GMT), duration : 01:00

Presenter: Hao Qiu, Institute of Modern Physics

slides for 4) Evaluation scheme.

Speaker : jonathan


Talk time : 13:45, Duration : 00:20

 HFT hits in minimc : here

Tracking Eval meeting #2

2011-09-02 08:42
America/New York
Friday, 2 September 2011
1-189, at 12:42 (GMT), duration : 00:00

In general, we should review the progresses and discuss the below:

  • CA - plan for evaluation (do we need additional help as offered by our GSI colleagues)
  • Geometry integration - were are we + plan forward (discussed with Jason and re-iterated the FGT goal)
  • Stv - progress and code readiness for evaluation
  • Vertex integration (previous thread on PPVF) - plan

 

Pxl Survey Plan


Talk time : 13:40, Duration : 00:05

WBS1.6 part in the project


Talk time : 13:35, Duration : 00:05

Meeting Notes

Speaker : Renee Fatemi


Talk time : 12:03, Duration : 00:20