Ivan's Update

Speaker : Ivan Koralt


Talk time : 10:00, Duration : 00:20

 

PXL detector geometry correction DB

Under:

eSTAR meeting

2013-03-05 12:00
2013-03-05 13:00
America/New York
Tuesday, 5 March 2013
EVO/SeeVogh - ID 14 3853, at 17:00 (GMT), duration : 01:00

eSTAR meeting

2013-03-19 13:00
2013-03-19 14:00
America/New York
Tuesday, 19 March 2013
EVO/SeeVogh - ID 14 3853, at 17:00 (GMT), duration : 01:00

eSTAR meeting

2013-04-02 13:00
2013-04-02 14:00
America/New York
Tuesday, 2 April 2013
EVO/SeeVogh - ID 14 3853, at 17:00 (GMT), duration : 01:00

eSTAR meeting

2013-02-19 12:00
2013-02-19 13:00
America/New York
Tuesday, 19 February 2013
EVO/SeeVogh - ID 14 3853, at 17:00 (GMT), duration : 01:00

Trigger Board Run13

2013-03-18 11:30
America/New York
Monday, 18 March 2013
BNL, at 15:30 (GMT), duration : 00:00
2013 Mar 18 (Monday) 11:30-12:30 (EDT) 1-187 at BNL or SeeVogh, EVO or Phone Bridge ID: 15 3955 (344-6100)
  • Status (RHIC, STAR, trigger, scalers, FGT, MTD, others)
Previous Meeings: 11/05, 11/19, 12/10 , 12/17, 1/07, 1/14, 1/28, 2/04, 2/25, 3/04, 3/11

software update

Speaker : Jonathan/Mike


Talk time : 13:30, Duration : 00:20

 some news :
1) Thomas Ullrich changed some parts of StEventUtilities and StPxlHit for tracking with PXL hits

FGT SW meeting

2013-03-13 12:30
2013-03-13 13:30
America/New York
Wednesday, 13 March 2013
Evo phone ID 14 8465, pwd: 2589, at 16:30 (GMT), duration : 01:00

AOB

Speaker : All ( All )


Talk time : 12:35, Duration : 00:15

Run 12 p+p 500 GeV SC and GL updates

Speaker : Gene V. Buren ( BNL )


Talk time : 12:15, Duration : 00:20
 

News from the Run

Speaker : L. Eun ( LBNL )


Talk time : 12:00, Duration : 00:15

Software and Computing Meeting

2013-03-13 12:00
2013-03-13 13:00
America/New York
Wednesday, 13 March 2013
1-189, SRN, at 16:00 (GMT), duration : 01:00
TimeTalkPresenter
12:00News from the Run ( 00:15 ) 0 filesL. Eun (LBNL)
12:15Run 12 p+p 500 GeV SC and GL updates ( 00:20 ) 1 fileGene V. Buren (BNL)
12:35AOB ( 00:15 ) 0 filesAll (All)

Trigger Board Run13

2013-03-11 11:30
America/New York
Monday, 11 March 2013
BNL, at 15:30 (GMT), duration : 00:00
2013 Mar 11 (Monday) 11:30-12:30 (EST) 1-187 at BNL or SeeVogh, EVO or Phone Bridge ID: 15 3955 (344-6100)
  • Status (RHIC, STAR, trigger, scalers, FGT, MTD, others)
Previous Meeings: 11/05, 11/19, 12/10 , 12/17, 1/07, 1/14, 1/28, 2/04, 2/25, 3/04

2012 W A_L in pp500

Request TypeSimulated background embedding (generator with real data as background for noise / pile-up studies)
DescriptionThis request will be used to estimate reconstruction efficiencies and background yields from electroweak processes for the Run 12 W analyses.  MC events from Pythia will be embedding in zerobias data from Run 12. 

Target lumi = 1000 pb-1 (roughly 10x Run 12 integrated luminosity)

Channels:
110K  :  W+ ->e+neutrino
110K  :  W+ -> tau+neutrino
35K    :  W- -> e+neutrino
35K    :  W- -> tau+neutrino
25K    :  Z/gamma*-> e+ e-

Embedding into events from zerobia files and sampled prorportionally to lumi
General Information
Request ID20131001
Priority: EC0
Priority: pwgNormal
StatusClosed
Physics Working GroupSpin
Requested byrfatemi
Contact email(s)rfatemi@pa.uky.edu, pibero@tamu.edu,balewski@mit.edu,jrsteven@mit.edu
Contact phone(s)
PWG email(s)starspin-hn@www.star.bnl.gov
Assigned Deputy: Not assigned
Assigned Helper: Not assigned
Global Simulation Settings
Request type:Simulated background embedding (generator with real data as background for noise / pile-up studies)
Number of events315000 = 315 K
Magnetic FieldReversed Full-Field
Collision Typepp 500GeV
Centrality---- SELECT CENTRALITY ----
BFC tagsDbV20130502, pp2012b, Sti, btof, fmsDat, VFPPVnoCTB, beamline, BEmcChkStat, Corr4, OSpaceZ2, OGridLeak3D, -hitfilt
ProductionP13ib
Geometry: simuy2012a
Geometry: recoy2012a
LibrarySL13b
Vertex optionLeave vertex to be reconstructed vertex, and use VFPPVnoCTB with beamline
Pileup optionNo
Detector SetTPC, BTOW, ETOW, ESMD
Data Sources
Real Data
File lookupA zerobias daq file from each run used in the 2012 analysis was pulled from HPSS and a subset of those events was used in the embedding production.  The HPSS request file showing the full path to each daq file is attached below.
Single Particle MC
ParticleAlpha
Particle settingsdalitz
Particles per event1
Vertex Z, cm-30 < Vertex < 30
Gaussian sigma in X,Y,Z (cm), if applicable0, 0, 0
Vertex offset: x, mm0
Vertex offset: y, mm0
Φ (phi), radian0 < Φ < 6.29
η (eta)-0.5 < η < 0.5
Pt, GeV0 < Pt < 30

makers and so on update

Speaker : Hao Qiu


Talk time : 13:50, Duration : 00:20

 

Calibrations


Talk time : 13:30, Duration : 00:20

 

FGT Commissioning Meeting

2013-03-08 15:00
2013-03-08 17:00
America/New York
Friday, 8 March 2013
STAR Conference Room, at 20:00 (GMT), duration : 02:00
Agenda:  

 
LINK TO: Commissioning plan


(1) Summary of commissioning activities / status : Bernd

Done:
  • Documentation for shift crew (Mapping / Gas / HV)
  • APV parameter scans
  • HV scan data
  • Pedestal stability vs. HV status
To-Do:
  • Prepare new HV file to equalize response 
  • Take test run (Fri./Sat.) and interate at least once
  • Switch to 6 time-bins next week on 03/15/13
  • Request 15 time-bin operation for W trigger at the start of PHYSICS, i.e. between 03/08/13 and 03/15/13
  • Participate in physics running with W trigger on 03/08/13 and with full trigger set on 03/15/13
     


(3) APV parameter scan status:

(4) Switch to 6 time bins: Akio
(5) Pedestal stability vs. HV : Devika

(6) Plans for next overnight collision shift: ALL

  

EVO-------------------------------------------------------------------------------------------

People can connect via EVO (use the following link):

http://evo.caltech.edu/evoNext/koala.jnlp?meeting=MMMeMn292BDIDB9D9uD29

The password is fgtin2011 

You can also connect via phone.  Phone bridge numbers can be found at:

http://evo.caltech.edu/evoGate/Documentation/telephone.jsp

The meeting ID is 637 5313 and password 9215.  

You can also connect via Skype by adding "evo.phone" (without the

quotes) to your buddy list and calling that contact.  Meeting ID and

password are the same as above.

EVO------------------------------------------------------------------------------------------- 

FGT Commissioning Meeting

2013-03-07 15:00
2013-03-07 17:00
America/New York
Thursday, 7 March 2013
STAR Conference Room, at 20:00 (GMT), duration : 02:00
Agenda:  

 
LINK TO: Commissioning plan


(1) Summary of commissioning activities

(2) Review of APV chip / APV assembly performance incl. discussion of potential fix / repair

(I will discuss some of these items before with Gerard in the morning!)


- Latency? Are we agreeing on 84 for 15 time bins?
- Phase parameter scan status?
- VFP (Rise time) / VFS (Decay time) / ISHA (Gain)

(4) HV scan status and HV equalization of quarter section response

(5) Switch to 7 time bins 

- Need for latency 'scan' or rather confirmation

(6) Plans for overnight collision shift Thu./Fri. 

  

EVO-------------------------------------------------------------------------------------------

People can connect via EVO (use the following link):

http://evo.caltech.edu/evoNext/koala.jnlp?meeting=MMMeMn292BDIDB9D9uD29

The password is fgtin2011 

You can also connect via phone.  Phone bridge numbers can be found at:

http://evo.caltech.edu/evoGate/Documentation/telephone.jsp

The meeting ID is 637 5313 and password 9215.  

You can also connect via Skype by adding "evo.phone" (without the

quotes) to your buddy list and calling that contact.  Meeting ID and

password are the same as above.

EVO------------------------------------------------------------------------------------------- 

Trigger Board Run13

2013-03-04 11:30
America/New York
Monday, 4 March 2013
BNL, at 16:30 (GMT), duration : 00:00
2013 Mar 4 (Monday) 11:30-12:30 (EST) 1-187 at BNL or SeeVogh, EVO or Phone Bridge ID: 15 3955 (344-6100) Previous Meeings: 11/05, 11/19, 12/10 , 12/17, 1/07, 1/14, 1/28, 2/04, 2/25