HFT Software

2013-12-27 13:30
America/New York
Friday, 27 December 2013
510-4867333, at 18:30 (GMT), duration : 00:00
TimeTalkPresenter
02:30Alignment Study with Zero-field Simulation Data ( 00:20 ) 1 file
02:50Geometry update ( 00:20 ) 2 filesFlemming Videbæk

HFT Software

2014-01-03 13:30
America/New York
Friday, 3 January 2014
510-4867333, at 18:30 (GMT), duration : 00:00
 Agenda
(even though not all might be discussed I put the links to talks here for completion)

0) Geometry modeling: see files below but also last week's post by Flemming and Jonathan
1) UPC electrons in zero magnetic field - latest results  
2) DCA-Alignment: see file below but also last week's simulations
3) Online/Offline HFT QA preparations

TimeTalkPresenter
02:30Alignment Update ( 00:20 ) 1 fileXin Dong
02:50geometry update ( 00:20 ) 1 fileFlemming Videbæk
02:50SSD geometry update ( 00:20 ) 1 filejonathan
03:10sensor efficiency ( 00:20 ) 1 fileLong Ma
03:30Minutes ( 00:20 ) 0 files

HFT Software

2014-01-10 13:30
America/New York
Friday, 10 January 2014
510-4867333, at 18:30 (GMT), duration : 00:00
 
1) QA work. Daniel sent to a few of us some ideas. He might want to circulate them
    to the group (including Xin's comments) but we need a unified approach to this
   by all subsystems.

2) Run preparation. This in view of the join meeting with the S&C group next week.
    What/where we need help, where we stand exactly in each subsystem for both
     data taking and also integration into production. This is not to be done by the meeting 
      time but in the next few days before next Wednesday.

***NEW (Xin)*** For each subsytem the responsible person will need to write down, in a couple of slides or email,
the commission plan in terms of software/calibration. 

     - DAQ reader, and offline data flow chain (many of them are under review, meaning not in standard lib yet, what is the plan to reconstruct data for the following studies)

     - DB tables and plan to populate the calibration/geometry parameters. We touched this before Christmas. I think it is the time to ask each subsystem to upload the survey tables and ideal geometry tables for simulation asap. Then need also plans for calibration tables, masking, ped/gain etc and timelines.

     - QA plan (first need to finalize the QA histograms for each subsytem, do we have responsible persons for each one? Then we need to have a plan involving many other volunteers to do the rotating QA checks through the commission and the physics run. Several students from Warsaw show the interest and I think they can help here with no much difficulty)

     - Alignment plan for the whole HFT including all subsystems. plan to use the cosmic ray data and plan to use the low luminosity beam data. (...in the works)


3) AOB
TimeTalkPresenter
13:30ssd geometry update ( 00:20 ) 1 filejonathan
13:50QA email by Daniel ( 00:20 ) 0 files
14:10Minutes ( 00:20 ) 0 files

HFT Software

2014-01-17 13:30
America/New York
Friday, 17 January 2014
510-4867333, at 18:30 (GMT), duration : 00:00
 Agenda

1) Run14 preparations. We need to see if critical tasks need attention. I will post a modified version of a brief summary that was posted on S&C meeting [but not discussed].

https://drupal.star.bnl.gov/STAR/system/files/SC-Jan2014.pdf

2) QA and Simulations updates

3) AOB
TimeTalkPresenter
13:30Run14 Status ( 00:20 ) 1 file
13:50IST software status ( 00:20 ) 2 filesYaping
14:10Minutes ( 00:20 ) 0 files

HFT Software

2014-01-24 13:30
America/New York
Friday, 24 January 2014
510-4867333, at 18:30 (GMT), duration : 00:00
 
1) Cosmic simulations: Amilkar prepared some events and Xin reconstructed them. Mike and I will look at them. No misalignments were introduced.

2) SSD Readout test...Update?

3) IST recent pulser events...

4) PXL/BNL crew update

TimeTalkPresenter
12:30IST Status and Plans ( 00:20 ) 1 fileYaping
13:10SSD geometry update ( 00:20 ) 1 filejonathan
13:30Minutes ( 00:20 ) 0 files

HFT Software

2014-01-31 13:30
America/New York
Friday, 31 January 2014
510-4867333, at 18:30 (GMT), duration : 00:00
 Agenda

1) Commissioning [this meeting becomes one of 3 weekly meetings for commissioning and run ops coordination].
The other two happen over EVO on Mondays 4:00-5:30 and Wednesday 1:30-3:00.

2) Software [Reviews, moves to dev and other official places, Breaks (inevitable)]. Oral report or a couple of 
slides to summarize the many activities would be fine. New SSD/IST pages are up [very nice]; linked from 
subsystem pages.

We broke DEV for a couple of days. This is a NO NO. It raises huge flags and a flood of complaints.
The BEST practice is to checkout a fresh copy from CVS and test the code before moving it to the red zone.
In case of accidents we should react immediately and go back to a working version

Jerome asked me whether we NEED to give karma to more people than in the list below:

> avail |margetis,bouchet,qiuh,smirnovd |StRoot/StPxlDbMaker
> avail |margetis,bouchet,qiuh,smirnovd |StRoot/StPxlSimMaker
> avail |margetis,bouchet,qiuh,smirnovd |StRoot/StPxlUtil 

He also asked me for bi-weekly updates on activities in the S&C meeting. The presenter should be the
most relevant one with the help [slides, corrections] from the rest.

 

3) Simulation issues [cosmics]  and AOB

 

TimeTalkPresenter
12:30IST_COSMIC_TEST ( 00:20 ) 1 fileYaping
12:50SSD offline/online news ( 00:20 ) 1 fileJonathan/Long
13:10Minutes ( 00:20 ) 0 files

HFT Software

2014-02-07 13:30
America/New York
Friday, 7 February 2014
510-4867333, at 18:30 (GMT), duration : 00:00
 Agenda

1) Cosmic run/commissioning updates

2) There was a close-interaction meeting of few people with the S&C group
    yesterday at BNL. Very useful. Minutes are here:
https://drupal.star.bnl.gov/STAR/event/2014/02/06/hft-software-coordination-meeting

We will touch upon some action items noted there.

3) Gene is coordinating the calibration requests. His summary page is here:
https://drupal.star.bnl.gov/STAR/comp/calib/prepRunXIV

4) We have two talks at the Collab. meeting. One on HFT Software  by me [last time we talk
about it probably in these generic terms as the project concludes] and one on commissioning
by Flemming[?]. We might also want to get together at BNL...Wednesday' commissioning meeting
might be a possible time.
TimeTalkPresenter
13:30SSD pedestal subtraction ( 00:20 ) 1 fileJonathan & Long
13:50Alignment and masking updates ( 00:20 ) 1 fileMichael Lomnitz
14:10Minutes ( 00:20 ) 0 files

HFT Software

2013-12-13 13:30
America/New York
Friday, 13 December 2013
510-4867333, at 18:30 (GMT), duration : 00:00

QA report


Talk time : 10:30, Duration : 00:20

Embedding QA


Talk time : 12:00, Duration : 00:20

AOB

Speaker : All ( All )


Talk time : 12:40, Duration : 00:20

Stv progress & status

Speaker : J. Webb & V. Perevoztchikov ( BNL )


Talk time : 12:30, Duration : 00:10

Calibrations Status

Speaker : Gene Van Buren ( BNL )


Talk time : 12:10, Duration : 00:20

 

TPC Twist & T0

Speaker : John Campbell ( OSU )


Talk time : 12:00, Duration : 00:10

https://drupal.star.bnl.gov/STAR/blog/campbell/2013/dec/12/tpc-twistt0-final-chapter

Software and Computing Meeting

2013-12-18 12:00
2013-12-18 13:00
America/New York
Wednesday, 18 December 2013
1-189, SRN, at 17:00 (GMT), duration : 01:00
TimeTalkPresenter
12:00TPC Twist & T0 ( 00:10 ) 0 filesJohn Campbell (OSU)
12:10Calibrations Status ( 00:20 ) 1 fileGene Van Buren (BNL)
12:30Stv progress & status ( 00:10 ) 2 filesJ. Webb & V. Perevoztchikov (BNL)
12:40AOB ( 00:20 ) 0 filesAll (All)

Beam structure in run 2009. Simulation of pp2pp setup (with triggering system) in 2009.

Speaker : Rafal Sikora ( AGH UST Cracow )


Talk time : 11:30, Duration : 00:30

 

Alignment 2009

Speaker : Bogdan Pawlik ( INP PAS )


Talk time : 11:10, Duration : 00:20

Alignment 2009 remake

Particle production in SDD

Speaker : Lukasz Fulek ( AGH-UST )


Talk time : 10:50, Duration : 00:20

 

Rho Analysis report

Speaker : R. Debbe


Talk time : 10:30, Duration : 00:20

W A_L God Parent Committee: Code QA

starver SL11d
cvs co -d psn0597 offline/paper/psn0597
cd psn0597/

export WANA_DIR=/star/u/smirnovd/psn0597
export WANA_RESULTS_DIR=/star/data05/scratch/smirnovd/psn0597