HFT Software
Updated on Fri, 2013-12-20 10:27. Originally created by margetis on 2013-12-20 10:27.510-4867333, at 18:30 (GMT), duration : 00:00
Time | Talk | Presenter |
---|---|---|
02:30 | Alignment Study with Zero-field Simulation Data ( 00:20 ) 1 file | |
02:50 | Geometry update ( 00:20 ) 2 files | Flemming Videbæk |
HFT Software
Updated on Fri, 2014-01-03 13:05. Originally created by margetis on 2013-12-20 10:27.510-4867333, at 18:30 (GMT), duration : 00:00
(even though not all might be discussed I put the links to talks here for completion)
0) Geometry modeling: see files below but also last week's post by Flemming and Jonathan
1) UPC electrons in zero magnetic field - latest results
2) DCA-Alignment: see file below but also last week's simulations
3) Online/Offline HFT QA preparations
Time | Talk | Presenter |
---|---|---|
02:30 | Alignment Update ( 00:20 ) 1 file | Xin Dong |
02:50 | geometry update ( 00:20 ) 1 file | Flemming Videbæk |
02:50 | SSD geometry update ( 00:20 ) 1 file | jonathan |
03:10 | sensor efficiency ( 00:20 ) 1 file | Long Ma |
03:30 | Minutes ( 00:20 ) 0 files |
HFT Software
Updated on Fri, 2014-01-10 13:25. Originally created by margetis on 2013-12-20 10:27.510-4867333, at 18:30 (GMT), duration : 00:00
1) QA work. Daniel sent to a few of us some ideas. He might want to circulate them
to the group (including Xin's comments) but we need a unified approach to this
by all subsystems.
2) Run preparation. This in view of the join meeting with the S&C group next week.
What/where we need help, where we stand exactly in each subsystem for both
data taking and also integration into production. This is not to be done by the meeting
time but in the next few days before next Wednesday.
***NEW (Xin)*** For each subsytem the responsible person will need to write down, in a couple of slides or email,
the commission plan in terms of software/calibration.
- DAQ reader, and offline data flow chain (many of them are under review, meaning not in standard lib yet, what is the plan to reconstruct data for the following studies)
- DB tables and plan to populate the calibration/geometry parameters. We touched this before Christmas. I think it is the time to ask each subsystem to upload the survey tables and ideal geometry tables for simulation asap. Then need also plans for calibration tables, masking, ped/gain etc and timelines.
- QA plan (first need to finalize the QA histograms for each subsytem, do we have responsible persons for each one? Then we need to have a plan involving many other volunteers to do the rotating QA checks through the commission and the physics run. Several students from Warsaw show the interest and I think they can help here with no much difficulty)
- Alignment plan for the whole HFT including all subsystems. plan to use the cosmic ray data and plan to use the low luminosity beam data. (...in the works)
3) AOB
Time | Talk | Presenter |
---|---|---|
13:30 | ssd geometry update ( 00:20 ) 1 file | jonathan |
13:50 | QA email by Daniel ( 00:20 ) 0 files | |
14:10 | Minutes ( 00:20 ) 0 files |
HFT Software
Updated on Fri, 2014-01-17 12:36 by bouchet. Originally created by margetis on 2013-12-20 10:27.510-4867333, at 18:30 (GMT), duration : 00:00
1) Run14 preparations. We need to see if critical tasks need attention. I will post a modified version of a brief summary that was posted on S&C meeting [but not discussed].
https://drupal.star.bnl.gov/STAR/system/files/SC-Jan2014.pdf
2) QA and Simulations updates
3) AOB
Time | Talk | Presenter |
---|---|---|
13:30 | Run14 Status ( 00:20 ) 1 file | |
13:50 | IST software status ( 00:20 ) 2 files | Yaping |
14:10 | Minutes ( 00:20 ) 0 files |
HFT Software
Updated on Fri, 2014-01-24 11:55. Originally created by margetis on 2013-12-20 10:27.510-4867333, at 18:30 (GMT), duration : 00:00
1) Cosmic simulations: Amilkar prepared some events and Xin reconstructed them. Mike and I will look at them. No misalignments were introduced.
2) SSD Readout test...Update?
3) IST recent pulser events...
4) PXL/BNL crew update
Time | Talk | Presenter |
---|---|---|
12:30 | IST Status and Plans ( 00:20 ) 1 file | Yaping |
13:10 | SSD geometry update ( 00:20 ) 1 file | jonathan |
13:30 | Minutes ( 00:20 ) 0 files |
HFT Software
Updated on Mon, 2014-02-03 13:05. Originally created by margetis on 2013-12-20 10:27.510-4867333, at 18:30 (GMT), duration : 00:00
1) Commissioning [this meeting becomes one of 3 weekly meetings for commissioning and run ops coordination].
The other two happen over EVO on Mondays 4:00-5:30 and Wednesday 1:30-3:00.
2) Software [Reviews, moves to dev and other official places, Breaks (inevitable)]. Oral report or a couple of
slides to summarize the many activities would be fine. New SSD/IST pages are up [very nice]; linked from
subsystem pages.
We broke DEV for a couple of days. This is a NO NO. It raises huge flags and a flood of complaints.
The BEST practice is to checkout a fresh copy from CVS and test the code before moving it to the red zone.
In case of accidents we should react immediately and go back to a working version
Jerome asked me whether we NEED to give karma to more people than in the list below:
> avail |margetis,bouchet,qiuh,smirnovd |StRoot/StPxlDbMaker
> avail |margetis,bouchet,qiuh,smirnovd |StRoot/StPxlSimMaker
> avail |margetis,bouchet,qiuh,smirnovd |StRoot/StPxlUtil
He also asked me for bi-weekly updates on activities in the S&C meeting. The presenter should be the
most relevant one with the help [slides, corrections] from the rest.
3) Simulation issues [cosmics] and AOB
Time | Talk | Presenter |
---|---|---|
12:30 | IST_COSMIC_TEST ( 00:20 ) 1 file | Yaping |
12:50 | SSD offline/online news ( 00:20 ) 1 file | Jonathan/Long |
13:10 | Minutes ( 00:20 ) 0 files |
HFT Software
Updated on Fri, 2014-02-07 10:39. Originally created by margetis on 2013-12-20 10:27.510-4867333, at 18:30 (GMT), duration : 00:00
1) Cosmic run/commissioning updates
2) There was a close-interaction meeting of few people with the S&C group
yesterday at BNL. Very useful. Minutes are here:
https://drupal.star.bnl.gov/STAR/event/2014/02/06/hft-software-coordination-meeting
We will touch upon some action items noted there.
3) Gene is coordinating the calibration requests. His summary page is here:
https://drupal.star.bnl.gov/STAR/comp/calib/prepRunXIV
4) We have two talks at the Collab. meeting. One on HFT Software by me [last time we talk
about it probably in these generic terms as the project concludes] and one on commissioning
by Flemming[?]. We might also want to get together at BNL...Wednesday' commissioning meeting
might be a possible time.
Time | Talk | Presenter |
---|---|---|
13:30 | SSD pedestal subtraction ( 00:20 ) 1 file | Jonathan & Long |
13:50 | Alignment and masking updates ( 00:20 ) 1 file | Michael Lomnitz |
14:10 | Minutes ( 00:20 ) 0 files |
HFT Software
Updated on Fri, 2013-12-20 10:27. Originally created by margetis on 2013-12-20 10:27.510-4867333, at 18:30 (GMT), duration : 00:00
QA report
Updated on Wed, 2013-12-18 15:16. Originally created by ramdebbe on 2013-12-18 15:16.Reference
Talk time : 10:30, Duration : 00:20
Embedding QA
Updated on Wed, 2013-12-18 11:01. Originally created by ramdebbe on 2013-12-18 11:01.Reference
Talk time : 12:00, Duration : 00:20
AOB
Updated on Wed, 2013-12-18 10:32. Originally created by jeromel on 2013-12-18 10:32.Speaker : All ( All )
Talk time : 12:40, Duration : 00:20
Stv progress & status
Speaker : J. Webb & V. Perevoztchikov ( BNL )
Talk time : 12:30, Duration : 00:10
Calibrations Status
Updated on Wed, 2013-12-18 11:56 by genevb. Originally created by jeromel on 2013-12-18 10:28.Speaker : Gene Van Buren ( BNL )
Talk time : 12:10, Duration : 00:20
TPC Twist & T0
Updated on Wed, 2013-12-18 11:57 by jwebb. Originally created by jeromel on 2013-12-18 10:28.Speaker : John Campbell ( OSU )
Talk time : 12:00, Duration : 00:10
https://drupal.star.bnl.gov/STAR/blog/campbell/2013/dec/12/tpc-twistt0-final-chapter
Software and Computing Meeting
1-189, SRN, at 17:00 (GMT), duration : 01:00
Time | Talk | Presenter |
---|---|---|
12:00 | TPC Twist & T0 ( 00:10 ) 0 files | John Campbell (OSU) |
12:10 | Calibrations Status ( 00:20 ) 1 file | Gene Van Buren (BNL) |
12:30 | Stv progress & status ( 00:10 ) 2 files | J. Webb & V. Perevoztchikov (BNL) |
12:40 | AOB ( 00:20 ) 0 files | All (All) |
Beam structure in run 2009. Simulation of pp2pp setup (with triggering system) in 2009.
Updated on Wed, 2013-12-18 12:38. Originally created by rafal_s on 2013-12-18 10:23.Reference
Speaker : Rafal Sikora ( AGH UST Cracow )
Talk time : 11:30, Duration : 00:30
Alignment 2009
Reference
Speaker : Bogdan Pawlik ( INP PAS )
Talk time : 11:10, Duration : 00:20
Alignment 2009 remake
Particle production in SDD
Updated on Wed, 2013-12-18 10:20. Originally created by lukfulek on 2013-12-18 10:10.Reference
Speaker : Lukasz Fulek ( AGH-UST )
Talk time : 10:50, Duration : 00:20
Rho Analysis report
Updated on Wed, 2013-12-18 07:14. Originally created by ramdebbe on 2013-12-18 07:14.W A_L God Parent Committee: Code QA
Updated on Wed, 2013-12-18 12:13. Originally created by smirnovd on 2013-12-16 11:30.starver SL11d
cvs co -d psn0597 offline/paper/psn0597
cd psn0597/
export WANA_DIR=/star/u/smirnovd/psn0597
export WANA_RESULTS_DIR=/star/data05/scratch/smirnovd/psn0597