Vertex finder in second embedding request
Updated on Wed, 2014-09-17 09:12. Originally created by ramdebbe on 2014-09-17 09:12.Minutes
Updated on Mon, 2014-09-15 10:29. Originally created by margetis on 2014-09-15 10:29.EVO info
Updated on Mon, 2014-09-15 09:59. Originally created by margetis on 2014-09-15 09:59.SSD geometry update
Updated on Mon, 2014-09-15 08:07. Originally created by bouchet on 2014-09-15 08:07.Reference
Speaker : jonathan
Talk time : 10:00, Duration : 00:20
news for :
- remaining overlaps fixed
- DB tables, BFC option
tracking study
Updated on Thu, 2014-09-11 13:58. Originally created by qiuh on 2014-09-11 13:58.Speaker : Hao
Talk time : 14:00, Duration : 00:20
HFT soft effort steering meeting
BNL 1-165, at 19:00 (GMT), duration : 01:00
ID: 1096183
EVO Phone Bridge Telephone Numbers:
---------------
- USA (BNL, Upton, NY)
+1 631 344 6100
- USA (Caltech, Pasadena, CA)
+1 626 395 2112
______________
Time | Talk | Presenter |
---|---|---|
14:00 | tracking study ( 00:20 ) 1 file | Hao |
STAR Management Meeting
Updated on Wed, 2014-10-08 10:59. Originally created by xzb on 2014-09-10 18:44.SeeVogh# 100 7671, BNL room 1-189, at 15:00 (GMT), duration : 01:30
1) upgrade recap:
agenda: https://drupal.star.bnl.gov/STAR/conference/timetable/talk/31071
proposal for future timeline and priorities
https://drupal.star.bnl.gov/STAR/system/files/STAR_future_plan_UIC.pdf
a) iTPC management and plans
https://drupal.star.bnl.gov/STAR/system/files/iTPC%20status.pdf
Project Manager: Flemming Vidaebek
Technical Director: Jim Thomas
b) run16 discussions at upgrade workshop
pp510 vs AA 62 (PAC requested both collaborations consider both cases)
FMS vs HCAL (I proposed to setup a committee to look into this)
c) forward upgrade (FCS+FTS in 2020+)
need a team for proposal in a few months.
2) action items from BES workshop at LBL
i) dN/dy vs rapidity for PID spectra in BES I
ii) strangeness ratio ( e.g. (K-/K+)/(pbar/p) ratio) from STAR for Lattice QCD comparison
currently, theorists took our data and calculated ratios by themselves, sys. errors are
not propogated correctly.
iii) 14.6 GeV production and analyses (HIGH PRIORITY)
iv) TPC+TOF proton Kurtosis and alsowith different rapidity windows
v)preparing new panel plots for BES II
Fig.19 in https://drupal.star.bnl.gov/STAR/system/files/BES_WPII_ver6.9_Cover.pdf
is more a summary from BES I, which is good.
but we need a summary panel (similar) clearly presenting our need for BES II.
vi) figure out a way to study baryon stopping and how the fluctuation in stopping impacts
Kurtosis analysis
(Volker's closing remarks:
https://docs.google.com/viewer?a=v&pid=sites&srcid=bGJsLmdvdnxiZXNpaTIwMTR8Z3g6NGNmMDk0ODI5NzFiYTBjMA
)
talks available:
http://besii2014.lbl.gov/Program/bes-ii-talk-files
3) collaboration meeting (agenda, tshirts, council chair election):
https://drupal.star.bnl.gov/STAR/meetings/star-collaboration-meeting-november-3-7
4) run15 preparations
start forming the trigger board group
6) postpone run15 to start in Feb. 2015?
7) APS site visit and survey
We should start with survey?
See link from the comment line:
8) STAR publication policy (forward suggestions from the committee)
STAR Management Meeting
Updated on Wed, 2014-09-10 18:44. Originally created by xzb on 2014-09-10 18:44.SeeVogh# 100 7671, BNL room 1-189, at 15:00 (GMT), duration : 01:30
STAR Management Meeting
SeeVogh# 100 7671, BNL room 1-189, at 15:00 (GMT), duration : 01:30
1) FMS refurbishing progress
https://drupal.star.bnl.gov/STAR/blog/videbaks/progress-reports-run-15-upgrades
2) Town Meeting talks, summary, feebacks
https://phys.cst.temple.edu/qcd/
Hot QCD executive summary
https://www.dropbox.com/sh/zapoaw908wqfwkx/AAAsOecQoB4uSvXZgsqROSBsa?dl=0
BNL rehearsals:
https://drupal.star.bnl.gov/STAR/blog/psoren/town-meeting-rehearsals
Spin related summary and wp:
https://drupal.star.bnl.gov/STAR/system/files/RHIC.Spin_.WP_.LRP2014.pdf
https://drupal.star.bnl.gov/STAR/system/files/pretown2014.pdf
https://indico.bnl.gov/conferenceDisplay.py?confId=866
4) Delta_G paper status
news draft story
https://drupal.star.bnl.gov/STAR/system/files/2014SpinUpdateV7FINAL.pdf
5) other items
6) Years with most PRL: 2004 and 2014 (we are 3/4 through the year)!

TUFF PCB cam layers sep_10_2014
Updated on Wed, 2014-09-10 11:03. Originally created by protected on 2014-09-10 11:03.
PWGC Meeting
, at 14:00 (GMT), duration : 01:30
1) PWGC preview on the direct virtual photon paper. More details can be found at the following link:
http://www.star.bnl.gov/protected/lfspectra/chiyang/dilepton/DirectPhotonPaperProposal/DirectPhoton.htm
2) November Collaboration Meeting: PWG reports, highlights
3) AOB
Description: PWGC conveners' weekly meeting
Community: STAR
Password: starpwgc
Meeting type: Open Meeting (Round Table)
Meeting Access Information:
- Meeting URL
SeeVogh R.N.
http://research.seevogh.com/join?meeting=3D3D3D3D3D3D3D3DMaMDMt222uDvD89D9iDI9a
EVO International
http://evo.caltech.edu/evoNext/koala.jnlp?meeting=3D3D3D3D3D3D3D3DMaMDMt222uDvD89D9iDI9a
- Password: starpwgc
- Phone Bridge
ID: 100 3600
Password: 8682
SeeVogh Research Network Phone Bridge Telephone Numbers:
---------------
- USA (Caltech, Pasadena, CA)
+1 626 395 2112
- USA (BNL, Upton, NY)
+1 631 344 6100
TUFF PCB cam layers sep_08_2014
Updated on Mon, 2014-09-08 17:48. Originally created by protected on 2014-09-08 17:48.
TUFF PCB cam layers sep_08_2014
Updated on Mon, 2014-09-08 17:46. Originally created by protected on 2014-09-08 17:46.
Town Meeting Rehearsals
Updated on Tue, 2014-09-09 16:53. Originally created by psoren on 2014-09-08 13:35.The meeting agenda is as follows:
1:00-2:00
ist-gain calibration
Updated on Mon, 2014-09-08 09:47. Originally created by huangbc on 2014-09-08 09:47.update on SSD geom.
Updated on Mon, 2014-09-08 08:38. Originally created by bouchet on 2014-09-08 08:38.Reference
Speaker : jonathan
Talk time : 10:20, Duration : 00:20
1) from last week's SC-HFt meeting (related to the overlaps) : https://drupal.star.bnl.gov/STAR/system/files/20140904
tracking study
Updated on Mon, 2014-09-08 02:15. Originally created by qiuh on 2014-09-08 02:14.HFT Software
Updated on Mon, 2014-09-15 10:00. Originally created by margetis on 2014-09-07 10:03.510-4867333, at 15:00 (GMT), duration : 00:00
1) Update from S&C-HFT meeting from Thursday and action items
https://drupal.star.bnl.gov/STAR/event/2014/09/11/hft-soft-effort-steering-meeting
2) Run14 calibration update
- PXL
- IST
- Alignment
- SSD (+Jonathan's update on SSD geometry)
3) AOB (Daniel's update)
https://drupal.star.bnl.gov/STAR/system/files/VertexFinderCheck_2014_09_15.pdf
Time | Talk | Presenter |
---|---|---|
10:00 | SSD geometry update ( 00:20 ) 1 file | jonathan |
10:20 | EVO info ( 00:10 ) 0 files | |
10:30 | Minutes ( 00:08 ) 0 files | |
10:38 | Vertex finder performance check ( 00:20 ) 1 file | Daniel Kikola |
High-Level Trigger (HLT) status
Updated on Fri, 2014-10-03 13:54 by kehw. Originally created by xzb on 2014-09-05 16:25.
Reference
Speaker : Hongwei Ke ( BNL )
Talk time : 17:10, Duration : 00:20