run 14 : offline cuts studies + hot chip tables

Speaker : jonathan


Talk time : 16:50, Duration : 00:20

 

run 15 ZF

Speaker : jonathan


Talk time : 16:30, Duration : 00:20

 

2009 jet luminosity discussion - round 2

 

Heavy Flavor publication plan

IST operation_2_9

 

STAR General Overview

Run 15 timing scans, etc.

  Attached are initial Run 15 pp 200 GeV crate level plts/nominal running phases with
caveats (these are from auto_scan run #16039029):

d+Au Ridge: Fit Gaus for Yields

This page is to support http://www.star.bnl.gov/protected/bulkcorr/yili/dAuRidge/dAuridgepaper.html

KFParticle Vertex Finder Production Request

In order to test the effectiveness of the KVParticle Vertex Finder, a W and jet analysis will be performed by Jinlong Zhang and Zilong Chang. The main observables are

Dijet Analysis - Plots - ZVertex vs Run

Trigger Board Meeting for Run15

2015-02-09 12:30
2015-02-09 14:00
America/New York
Monday, 9 February 2015
BNL Physics 1-224 and SeeVogh (ID 100 9853), at 17:30 (GMT), duration : 01:30
 

SSD Meeting

2015-02-09 16:30
America/New York
Monday, 9 February 2015
EVO, at 21:30 (GMT), duration : 00:00
 
TimeTalkPresenter
16:30run 15 ZF ( 00:20 ) 2 filesjonathan
16:50run 14 : offline cuts studies + hot chip tables ( 00:20 ) 1 filejonathan
17:10SSD software update ( 00:20 ) 1 fileLong

Run12 & Run13 different time period

Run 13 W analysis group meetings : Analysis updates [Data BG discripancy]

W Cross Section Ratio: Spin Comments and Forward Progress

Speaker : Matt Posik


Talk time : 10:00, Duration : 00:20

 

W AL -- pre-preliminary

******* W(eta) summary for charge=P  INPUT=Run13 P14ia *********
lumi-corrections:  0.993, 0.998, 1.000, 1.009,  applied

Background estimation with Fitting QCD

 Slides for Feb 6 W meeting. 

W/Z 2013 Analysis Meeting

2015-02-06 10:00
2015-02-06 11:00
America/New York
Friday, 6 February 2015
, at 15:00 (GMT), duration : 01:00

Agenda:

1) AL analysis:

- Overview of period 1 status
- Discussion on BEMC / EEMC calibration - scale 
- Overview of period 2 status
- Discussion on embedding period 2
- Next steps needed for prelim. result release

2) Cross-ection ratio analysis:

- Review of recent questions
- Next steps needed for prelim. result release


SeeVogh —————————————————————————————————————————————


Title: W/Z 2013 Analysis Meeting
Description:
Community: STAR
Password: wsin2013
Meeting type: Open Meeting (Round Table)

Meeting Access Information:
SeeVoghRN Application       http://research.seevogh.com/joinSRN?meeting=MDMaM82v2nD2DB9D9lD99D
WebStart (Java)             http://research.seevogh.com/join?meeting=MDMaM82v2nD2DB9D9lD99D
Mobile App :  Meeting ID: 100 7121   or  Link: http://research.seevogh.com/join?meeting=MDMaM82v2nD2DB9D9lD99D

- Phone Bridge
 ID: 100 7121
 Password: 3434

Eastern Daylight Time (-0400)
Start 2014-09-05  09:30
End   2014-09-05  12:30

SeeVogh —————————————————————————————————————————————
TimeTalkPresenter
10:00W Cross Section Ratio: Spin Comments and Forward Progress ( 00:20 ) 2 filesMatt Posik

Event filtering

For the 200 GeV Au+Au data taken in Run14, the MTD group is proposing a two-pass reconstruction scheme for events that are

checks required last meeting

Speaker : Hao Qiu


Talk time : 15:00, Duration : 00:20

 https://www.star.bnl.gov/protected/heavy/qiuh/HFT/software/tracking_150120.pdf