change (proposal) to the SSD code for run 14-15

Speaker : jonathan


Talk time : 16:50, Duration : 00:20

 

update on chip masking

Speaker : jonathan


Talk time : 16:30, Duration : 00:20

 

BTOW 2009-2013 calibr w/ e, W, Z

Attempt to relate current e, W, Z BTOW calibration info:
see draft "btow_2009-2013_calibr_combo_ver.1.pptx"

IST Run14 Data QA

Speaker : Guannan


Talk time : 12:20, Duration : 00:20

 

IST calibration status check

Speaker : Yaping


Talk time : 12:00, Duration : 00:20

IST operation

Speaker : Xiaozhi


Talk time : 12:00, Duration : 00:20

 

OSU EPD Testbench, BES meeting March9 2015

 

pcb binding practice

 

Trigger Board Meeting for Run15

2015-03-09 12:30
2015-03-09 14:00
America/New York
Monday, 9 March 2015
BNL Physics 1-224 and SeeVogh (ID 100 9853), at 16:30 (GMT), duration : 01:30
 

AnalysisRun16066027

The detailed analysis of triggers for this run follows

GPC Editorial Board

2015-03-10 11:00
2015-03-10 12:30
America/New York

  --- Editorial Board Agenda  March 10, 2015 ---

pp2pp draft

Background estimation with slope ptbalance cut

 

Scaler rates first transverse fill

 

pp2pp figures

Documentation for Performing BEMC Gain Calibration

 The attached PDF gives instructions for running all of the code to peform a gain calibration on the BEMC.

Partonic pT plots - first look

The first plot is for partonic pt of 2-3 in one file in one run.

The second plot is for the partonic pt of 2-3 in all the files in all the runs.

detector efficiency and space charge simulation, tracking parameter

Speaker : Hao Qiu


Talk time : 15:20, Duration : 00:20

 

Track Quality vs Number of Bad HFT Hits in minbias and central AuAu simulations

Speaker : Jason Webb


Talk time : 15:00, Duration : 00:20

HFT soft effort steering meeting

2015-03-05 15:00
2015-03-05 16:00
America/New York
Thursday, 5 March 2015
1-189, at 20:00 (GMT), duration : 01:00
- Phone Bridge
ID: 1096183

EVO Phone Bridge Telephone Numbers:
---------------
- USA (BNL, Upton, NY)
+1 631 344 6100

- USA (Caltech, Pasadena, CA)
+1 626 395 2112


______________

Agenda:
  • BaseQA with central events [Jason]
  • QA of 3-HFT-hit tracks [Jason]
  • HFT hit combination track populations [Victor, Gene]
  • Tracking parameter studies [Hao, Michael]
  • AOB

TimeTalkPresenter
15:00Track Quality vs Number of Bad HFT Hits in minbias and central AuAu simulations ( 00:20 ) 2 filesJason Webb
15:20detector efficiency and space charge simulation, tracking parameter ( 00:20 ) 1 fileHao Qiu