HFT Software meeting

2015-12-09 11:00
America/New York
Wednesday, 9 December 2015
, at 16:00 (GMT), duration : 00:00
 
1) Run15 Calibration updates

- Sanshiro/Guannan sector #7 re-alignment after re-survey.
- Subsystems updates

2) SSD Run14 million event pre-production: libraries

3) Geometry updates [anything not in the library/known by Jason]

Meeting Minutes


1) Sanshiro

  New survey of sector 7, with re-alignment, new residuals look better than previous one. Will integrate the new tables into DB.

  We will finalize the geometry tables and do a clean verification production for all zero-field data again and confirm these tables.

 

2) SSD

  Run15, SSD masking table, some runs remain to be done in pplong2

  Now a bit limited by the available CPU resources at RCF.  We discussed that some other people can help (will follow up offline).

 

  Run14 software is being assembled.

  hit error - simulation test for 30 vs. 100, no difference was seen. One suggestion is to look at the data to have a realistic evaluation. Will need some bit statistics to get sufficient high pT tracks on which the MCS effect should not be dominant.

 

3) Run16 DB initialization

   no geometry change needed as far as everyone in the meeting recalls. Suggest to each subsystem to do

   i) ideal DB table entries (including geometry and calibration tables) with 2015-12-10 timestamp

   ii) real DB table entries with 2016-01-01 timestamp

       - for IST/SSD, they can be copied from Run15

       - for PXL, new survey tables need to be put in as well as some initial values for misalignment parameters.

 

4) IST chain

   Reviewer agreed on the structure, Bingchu will update this.

        rawHitMaker – one week, then ready for real data production.

        slowSimMaker – a few weeks





TimeTalkPresenter
11:00Run15 alignment update ( 00:20 ) 1 fileSanshiro Mizuno
11:20SSD masking table status ( 00:20 ) 1 filejonathan
11:402) SSD Run14 million event pre-production: libraries ( 00:20 ) 0 filesjonathan

HFT Software meeting

2015-12-16 11:00
America/New York
Wednesday, 16 December 2015
, at 16:00 (GMT), duration : 00:00
 
1) Run15 Calibs
- Mustafa/Xin: first look at TPC-HFT alignment in p-p data
- Subsystems updates

2) Pileup 'future' protection settings: impact on HFT data quality/rate

3) Run16 preps
- Db geometry timestamp initialization
- Hardware status/Cosmics [1/12]
- Fast Calibs for Offline/HLT-tests

4) Run14 with SSD pre-prod checks

5) AOB


----------------
EVO ID: 101 6659

http://research.seevogh.com/joinSRN?meeting=M2MvMB2a2iD9Di9v98DM92

TimeTalkPresenter
11:004) Run14 with SSD pre-prod checks [follow up of last week] ( 00:20 ) 1 filejonathan
11:20Run15 alignment ( 00:20 ) 2 files

HFT Software meeting

2015-12-23 11:00
America/New York
Wednesday, 23 December 2015
, at 16:00 (GMT), duration : 00:00
 

 

1) Calibration pass for run15 

2) Remaining tasks before run15 production

3) Pre-collaboration HFT meeting at BNL

4) AOB (future protection, pp vertex finder)
TimeTalkPresenter
11:00Minutes ( 00:20 ) 0 files

HFT Software meeting

2015-12-30 11:00
America/New York
Wednesday, 30 December 2015
, at 16:00 (GMT), duration : 00:00

HFT Software meeting

2016-01-06 11:00
America/New York
Wednesday, 6 January 2016
EVO, at 16:00 (GMT), duration : 00:00
 

— Calibration run15 summary by subsystem

 * Remaining items

-- Pileup Studies [HFT performance vs Luminosity] Guannan, Xin, Hao

-- SSD Internal busy setting study, Long Zhou

-- BNL HFT and Collab. meeting



----------------
EVO ID: 101 6659 

http://research.seevogh.com/joinSRN?meeting=M2MvMB2a2iD9Di9v98DM92

TimeTalkPresenter
11:002015Jan3_VPD5_PileUp_Study ( 00:20 ) 0 filesGuannan Xie
11:20SSD Internal busy study ( 00:20 ) 0 filesLong Zhou
11:40calibration run by run (SST) ( 00:20 ) 0 filesjonathan
12:00Minutes ( 00:20 ) 0 files

HFT Software meeting

2016-01-13 11:00
America/New York
Wednesday, 13 January 2016
, at 16:00 (GMT), duration : 00:00
 

— News from the front: Cosmics [see Xin's email]

-- Automated QA

-- Test production with SSD 

-- (BNL) HFT and Collab. meeting
    ->Mike will give the S&C HFT talk



----------------
EVO ID: 101 6659 

http://research.seevogh.com/joinSRN?meeting=M2MvMB2a2iD9Di9v98DM92

TimeTalkPresenter
11:00IST Calibrations Run15 ( 00:20 ) 1 fileYaping
11:20HFT session at S&C ( 00:20 ) 0 filesMichael L
11:40SST run 15 calibration status ( 00:20 ) 1 filejonathan

HFT Software meeting

2016-01-20 11:00
America/New York
Wednesday, 20 January 2016
, at 16:00 (GMT), duration : 00:00
 
1) Workshop agenda

2) Brief reports on status of analyses, calibs etc

----------------
EVO ID: 101 6659 

http://research.seevogh.com/joinSRN?meeting=M2MvMB2a2iD9Di9v98DM9


TimeTalkPresenter
11:00Workshop Agenda ( 00:20 ) 1 file
11:202016 HFT Alignment first pass ( 00:20 ) 1 fileSanshiro
11:40run14 preproduction with SSD ( 00:20 ) 1 filejonathan

HFT Software meeting

2016-01-27 11:00
America/New York
Wednesday, 27 January 2016
, at 16:00 (GMT), duration : 00:00

HFT Software meeting

2016-02-03 11:00
America/New York
Wednesday, 3 February 2016
, at 16:00 (GMT), duration : 00:00
 
1) Subsystems in Fast offline in Run16. 

2) Run15 pre-production checks: Tracking/Vertex

3) Embedding




----------------
EVO ID: 101 6659 

http://research.seevogh.com/joinSRN?meeting=M2MvMB2a2iD9Di9v98DM92

TimeTalkPresenter
11:00run-14 SST production (follow up) ( 00:20 ) 1 filejonathan

HFT Software meeting

2015-12-02 11:00
America/New York
Wednesday, 2 December 2015
, at 16:00 (GMT), duration : 00:00
 
Instead of a new agenda: action items from last week's meeting [new Minutes in bold]

*** Run14 [1 Million +SSD]
- Save MuDst only. Xin will check space on LBL-prod disk. 
 LBL-prod has about 1 Tb free space. Should be enough to hold the MuDst of 1 Million events.
- Need to setup library [SL15c+SSD patch]. Jonathan will notify Gene/Jerome of plans [complicated since SST doesn't exist in SL15c]
Mike and Jonathan both find SL15k more appropriate [Mike did his efficiency studies with simulation with this libarary]

 

*** Run15 Calibs
- PXL upload masking on Db. Hao is back and will take care of this.
   Then Guannan will do a test before we ask S&C for the calibration scan.

- IST Bingchu to follow up with S&C on code updates [he did and process is in progress].
   
We can ask Dmitri to move the Data part, which is ready to dev [needed for production]
- SSD magnet-ON cosmics tables in Db. Jonathan produced Hijing/BFC SSD data with 30/100microns resolution in tracking r-phi. Will contact Jason to do evaluation. [he did, waiting response]
- He is currently analyzing p+Au for masking and threshold check [5 adc cut of pp good here too?]. This is done and if anything the cut should be lower than 5 adc. Some details here:
https://drupal.star.bnl.gov/STAR/system/files/ssdmeeting_20151130_0.pdf
  [SSD masking for pAu,pAl is finished and need to put in Db]. pp-long3 data set is with no cooling in IST, ignore.

*** Daniel to run some Run14 data+SSD in fast-offline environment [to check readiness][Jonathan send an email with SSD info]
  After some output is obtained we need to check if other info/histos is needed to be added 




-----------------
EVO ID: 101 4815
http://research.seevogh.com/joinSRN?meeting=MsMiMI2n2vDlDI9999Dt9s 

Progress in PID using TOF

It seems that most of the problems are gone.

Zimanyi School '15 - v4

Zimanyi School '15 - v4

Run-11 Transverse Jets: dE/dx PID Plots

The following plots show nσ(K,p,e) plots for events passing the "standard" 2011 nσ(π) cuts (-1.5 to +2.5) in comparison to a potential set of new cuts

Zimanyi School '15 - v3

Zimanyi School '15 - v3

chip mask table status ; look at pAu vs. pp vs. offline threshold

Speaker : jonathan


Talk time : 16:30, Duration : 00:20

 

200 GeV IFF APS talk

 

Zhenyu Ye's FTS Simulation Studies with EICROOT

2015/12/01 10:30pm EICROOT Built on 2015/11/25
https://drupal.star.bnl.gov/STAR/system/files/yezhenyu_FTS_20151201.pdf
 

EVO info


Talk time : 09:00, Duration : 00:01

 

 

Title: Tracking Focus Group

Tracking Focus Group BNL meeting

2015-12-10 09:00
2015-12-11 12:00
America/New York
Thursday, 10 December 2015
BNL- Rm 2-78 and EVO, at 14:00 (GMT), duration : 03:00
 BNL: Dec 10 2015, Rm 2-78

Agenda

 

Dec. 10th

 

--- Morning ---

o. HLT status review (Hongwei Ke)

o. MTD trigger in HLT (Rongrong Ma)

o. HFT and IST calibration in HLT (Zhengqiao Zhang)

o. KFParticle (Maksym Zyzak)

o. Primary vertex finder (Valentina Akishina, remotely)

 

o. Combined barrel and forward tracking (Mykhailo Pugach, remotely)

 

--- Afternoon, with S&C presence ---

o. CA track finder with HFT (Grigory Kozlov)

o. Optimization of Altro chip ADC threshold. (Irakli Chakaberia)

o. StiCA (Yuri Fisyak)

o. [Possible contribution] KFV work (Dmitri)

o. [Round Table] Refine future tasks/work for this group 

 

Dec. 11th [it is possible that time permitting one or more of these talks are going to move to Thursday]

 

--- Morning ---

o. Theoretical description and online extraction of medium properties in heavy-ion collisions.(Volodymyr Vovchenko)

o. Reconstruction of Sigma- (Pavel Kisel)

 

TimeTalkPresenter
09:00EVO info ( 00:01 ) 0 files
09:00HLT status review ( 00:25 ) 1 fileHongwei Ke
09:30MTD trigger in HLT ( 00:25 ) 1 fileRongrong Ma
10:00HFT and IST calibration in HLT ( 00:25 ) 1 fileZhengqiao Zhang
10:30KFParticle ( 00:25 ) 1 fileMaksym Zyzak
11:00Primary vertex finder ( 00:25 ) 1 fileValentina Akishina
11:30Combined barrel and forward tracking ( 00:25 ) 1 fileMykhailo Pugach ( remotely )
12:00Lunch ( 01:30 ) 0 files
13:30CA track finder with HFT ( 00:25 ) 1 fileGrigory Kozlov
14:00Optimization of Altro chip ADC threshold. ( 00:25 ) 2 files Irakli Chakaberia
14:30StiCA ( 00:25 ) 3 filesYuri Fisyak and Hongwei Ke
15:00Theoretical description and online extraction of medium properties in heavy-ion collisions. ( 00:25 ) 1 fileVolodymyr Vovchenko
15:30Reconstruction of Sigma- ( 00:25 ) 1 filePavel Kisel
16:00KFV work ( 00:30 ) 1 file Dmitri Smirnov
16:30Refine future tasks/work for this group [Round table discussion] ( 00:20 ) 0 files

Run14 data+SSD in fast-offline environment

  1. some updates have been done to the SST code over the last 2 weeks (StSstDaqMaker, StSstUtil)