Trigger Efficiency for 151202 MTD Phone Meeting
Updated on Wed, 2015-12-02 06:13. Originally created by liuyf on 2015-12-02 06:13.Efficiency Correction for Net-Proton Higher Moment
Updated on Sat, 2016-01-30 00:31. Originally created by tnonaka on 2015-12-02 02:07.
Jet Meeting - Dec 16
Updated on Thu, 2015-12-17 09:51. Originally created by sra233 on 2015-12-02 02:04.HFT Software meeting
Updated on Wed, 2015-12-09 12:54 by margetis. Originally created by dongx on 2015-12-01 20:32., at 16:00 (GMT), duration : 00:00
1) Run15 Calibration updates
- Sanshiro/Guannan sector #7 re-alignment after re-survey.
- Subsystems updates
3) Geometry updates [anything not in the library/known by Jason]
Meeting Minutes
1) Sanshiro
New survey of sector 7, with re-alignment, new residuals look better than previous one. Will integrate the new tables into DB.
We will finalize the geometry tables and do a clean verification production for all zero-field data again and confirm these tables.
2) SSD
Run15, SSD masking table, some runs remain to be done in pplong2
Now a bit limited by the available CPU resources at RCF. We discussed that some other people can help (will follow up offline).
Run14 software is being assembled.
hit error - simulation test for 30 vs. 100, no difference was seen. One suggestion is to look at the data to have a realistic evaluation. Will need some bit statistics to get sufficient high pT tracks on which the MCS effect should not be dominant.
3) Run16 DB initialization
no geometry change needed as far as everyone in the meeting recalls. Suggest to each subsystem to do
i) ideal DB table entries (including geometry and calibration tables) with 2015-12-10 timestamp
ii) real DB table entries with 2016-01-01 timestamp
- for IST/SSD, they can be copied from Run15
- for PXL, new survey tables need to be put in as well as some initial values for misalignment parameters.
4) IST chain
Reviewer agreed on the structure, Bingchu will update this.
rawHitMaker – one week, then ready for real data production.
slowSimMaker – a few weeks
Time | Talk | Presenter |
---|---|---|
11:00 | Run15 alignment update ( 00:20 ) 1 file | Sanshiro Mizuno |
11:20 | SSD masking table status ( 00:20 ) 1 file | jonathan |
11:40 | 2) SSD Run14 million event pre-production: libraries ( 00:20 ) 0 files | jonathan |
HFT Software meeting
Updated on Tue, 2015-12-15 15:58 by margetis. Originally created by dongx on 2015-12-01 20:32., at 16:00 (GMT), duration : 00:00
1) Run15 Calibs
- Mustafa/Xin: first look at TPC-HFT alignment in p-p data
- Subsystems updates
2) Pileup 'future' protection settings: impact on HFT data quality/rate
3) Run16 preps
- Db geometry timestamp initialization
- Hardware status/Cosmics [1/12]
- Fast Calibs for Offline/HLT-tests
4) Run14 with SSD pre-prod checks
5) AOB
----------------
EVO ID: 101 6659
http://research.seevogh.com/joinSRN?meeting=M2MvMB2a2iD9Di9v98DM92
Time | Talk | Presenter |
---|---|---|
11:00 | 4) Run14 with SSD pre-prod checks [follow up of last week] ( 00:20 ) 1 file | jonathan |
11:20 | Run15 alignment ( 00:20 ) 2 files |
HFT Software meeting
Updated on Wed, 2015-12-23 10:54 by videbaks. Originally created by dongx on 2015-12-01 20:32., at 16:00 (GMT), duration : 00:00
1) Calibration pass for run15
2) Remaining tasks before run15 production
3) Pre-collaboration HFT meeting at BNL
4) AOB (future protection, pp vertex finder)----------------
EVO ID: 101 6659
http://research.seevogh.com/joinSRN?meeting=M2MvMB2a2iD9Di9v98DM92
Time | Talk | Presenter |
---|---|---|
11:00 | Minutes ( 00:20 ) 0 files |
HFT Software meeting
Updated on Tue, 2015-12-01 20:32 by margetis. Originally created by dongx on 2015-12-01 20:32., at 16:00 (GMT), duration : 00:00
HFT Software meeting
Updated on Wed, 2016-01-06 11:17 by margetis. Originally created by dongx on 2015-12-01 20:32.EVO, at 16:00 (GMT), duration : 00:00
— Calibration run15 summary by subsystem
* Remaining items
-- SSD Internal busy setting study, Long Zhou
-- BNL HFT and Collab. meeting
----------------
EVO ID: 101 6659
http://research.seevogh.com/joinSRN?meeting=M2MvMB2a2iD9Di9v98DM92
Time | Talk | Presenter |
---|---|---|
11:00 | 2015Jan3_VPD5_PileUp_Study ( 00:20 ) 0 files | Guannan Xie |
11:20 | SSD Internal busy study ( 00:20 ) 0 files | Long Zhou |
11:40 | calibration run by run (SST) ( 00:20 ) 0 files | jonathan |
12:00 | Minutes ( 00:20 ) 0 files |
HFT Software meeting
Updated on Wed, 2016-01-13 10:05 by margetis. Originally created by dongx on 2015-12-01 20:32., at 16:00 (GMT), duration : 00:00
— News from the front: Cosmics [see Xin's email]
-- Automated QA
-- (BNL) HFT and Collab. meeting
->Mike will give the S&C HFT talk
----------------
EVO ID: 101 6659
http://research.seevogh.com/joinSRN?meeting=M2MvMB2a2iD9Di9v98DM92
Time | Talk | Presenter |
---|---|---|
11:00 | IST Calibrations Run15 ( 00:20 ) 1 file | Yaping |
11:20 | HFT session at S&C ( 00:20 ) 0 files | Michael L |
11:40 | SST run 15 calibration status ( 00:20 ) 1 file | jonathan |
HFT Software meeting
Updated on Tue, 2016-01-19 22:15 by margetis. Originally created by dongx on 2015-12-01 20:32., at 16:00 (GMT), duration : 00:00
2) Brief reports on status of analyses, calibs etc
----------------
EVO ID: 101 6659
http://research.seevogh.com/joinSRN?meeting=M2MvMB2a2iD9Di9v98DM9
Time | Talk | Presenter |
---|---|---|
11:00 | Workshop Agenda ( 00:20 ) 1 file | |
11:20 | 2016 HFT Alignment first pass ( 00:20 ) 1 file | Sanshiro |
11:40 | run14 preproduction with SSD ( 00:20 ) 1 file | jonathan |
HFT Software meeting
Updated on Tue, 2015-12-01 20:32 by margetis. Originally created by dongx on 2015-12-01 20:32., at 16:00 (GMT), duration : 00:00
HFT Software meeting
Updated on Wed, 2016-02-03 10:51 by margetis. Originally created by dongx on 2015-12-01 20:32., at 16:00 (GMT), duration : 00:00
1) Subsystems in Fast offline in Run16.
2) Run15 pre-production checks: Tracking/Vertex
3) Embedding
----------------
EVO ID: 101 6659
http://research.seevogh.com/joinSRN?meeting=M2MvMB2a2iD9Di9v98DM92
Time | Talk | Presenter |
---|---|---|
11:00 | run-14 SST production (follow up) ( 00:20 ) 1 file | jonathan |
HFT Software meeting
Updated on Thu, 2015-12-03 09:04 by margetis. Originally created by dongx on 2015-12-01 20:32., at 16:00 (GMT), duration : 00:00
Instead of a new agenda: action items from last week's meeting [new Minutes in bold]
*** Run14 [1 Million +SSD]
- Save MuDst only. Xin will check space on LBL-prod disk.
LBL-prod has about 1 Tb free space. Should be enough to hold the MuDst of 1 Million events.
- Need to setup library [SL15c+SSD patch]. Jonathan will notify Gene/Jerome of plans [complicated since SST doesn't exist in SL15c]
Mike and Jonathan both find SL15k more appropriate [Mike did his efficiency studies with simulation with this libarary]
*** Run15 Calibs
- PXL upload masking on Db. Hao is back and will take care of this.
Then Guannan will do a test before we ask S&C for the calibration scan.
- IST Bingchu to follow up with S&C on code updates [he did and process is in progress].
We can ask Dmitri to move the Data part, which is ready to dev [needed for production]
- SSD magnet-ON cosmics tables in Db. Jonathan produced Hijing/BFC SSD data with 30/100microns resolution in tracking r-phi. Will contact Jason to do evaluation. [he did, waiting response]
- He is currently analyzing p+Au for masking and threshold check [5 adc cut of pp good here too?]. This is done and if anything the cut should be lower than 5 adc. Some details here:
https://drupal.star.bnl.gov/STAR/system/files/ssdmeeting_20151130_0.pdf
[SSD masking for pAu,pAl is finished and need to put in Db]. pp-long3 data set is with no cooling in IST, ignore.
*** Daniel to run some Run14 data+SSD in fast-offline environment [to check readiness][Jonathan send an email with SSD info]
After some output is obtained we need to check if other info/histos is needed to be added
-----------------
EVO ID: 101 4815
http://research.seevogh.com/joinSRN?meeting=MsMiMI2n2vDlDI9999Dt9s
Progress in PID using TOF
Updated on Tue, 2015-12-01 13:03. Originally created by rafal_s on 2015-12-01 10:39.Zimanyi School '15 - v4
Updated on Tue, 2015-12-01 05:41. Originally created by siejka on 2015-12-01 05:41.Zimanyi School '15 - v4
Run-11 Transverse Jets: dE/dx PID Plots
Updated on Tue, 2015-12-01 22:52. Originally created by drach09 on 2015-11-30 23:02.The following plots show nσ(K,p,e) plots for events passing the "standard" 2011 nσ(π) cuts (-1.5 to +2.5) in comparison to a potential set of new cuts
Zimanyi School '15 - v3
Updated on Mon, 2015-11-30 18:27. Originally created by siejka on 2015-11-30 18:15.Zimanyi School '15 - v3
chip mask table status ; look at pAu vs. pp vs. offline threshold
Updated on Mon, 2015-11-30 16:04. Originally created by bouchet on 2015-11-30 16:04.200 GeV IFF APS talk
Updated on Mon, 2015-11-30 15:45. Originally created by klandry on 2015-11-30 15:45.
Zhenyu Ye's FTS Simulation Studies with EICROOT
Updated on Tue, 2015-12-01 23:39. Originally created by yezhenyu on 2015-11-30 14:26.
2015/12/01 10:30pm EICROOT Built on 2015/11/25
https://drupal.star.bnl.gov/STAR/system/files/yezhenyu_FTS_20151201.pdf