SpinQA Update 4
Updated on Mon, 2016-04-11 10:49. Originally created by bsumma on 2016-04-11 02:22.Update on spin QA status
STAR BUR writing committee 2016
Updated on Mon, 2016-04-11 14:38. Originally created by xzb on 2016-04-10 08:21. 2016-04-11 15:00
2016-04-11 16:30
America/New York
Monday, 11 April 2016
https://bluejeans.com/333205157, at 19:00 (GMT), duration : 01:30
https://bluejeans.com/333205157, at 19:00 (GMT), duration : 01:30
Agenda:
1) run 17 and run 18
see my email to the BUR committee and Council
what is the strategy here?
Default run 17 cryo-weeks are still:
24, 19 (baseline) and 15
default run 18 weeks: 10 physics weeks
2) discussed action items:
a) pp510 luminosity
b) Roman Pot physics projections
c) dileptons in Isobar
d) 27 GeV or others?
3) detectors/upgrades needed for these programs
1) run 17 and run 18
see my email to the BUR committee and Council
what is the strategy here?
Default run 17 cryo-weeks are still:
24, 19 (baseline) and 15
default run 18 weeks: 10 physics weeks
2) discussed action items:
a) pp510 luminosity
b) Roman Pot physics projections
c) dileptons in Isobar
d) 27 GeV or others?
3) detectors/upgrades needed for these programs
Strict Eta Cut Reproduction
Updated on Fri, 2016-04-22 12:45. Originally created by pagebs on 2016-04-09 22:16. Comparison of dijet quantities using the two different eta cut criteria ...
A look on Run16 Au+Au 200 GeV space charge
Lumonisity has been kept approximately constant throughout fills in run16. We were wondering if the space charge has a strong intensity depedence.
Run 9 Pi0: Embedding Real Comparison
Updated on Fri, 2016-04-08 12:23. Originally created by wsolyst on 2016-04-08 11:01.
Run 9 Pi0: Partonic pT cut on Embedding
Updated on Fri, 2016-04-15 10:35. Originally created by wsolyst on 2016-04-08 10:53.
Trigger Board Meeting for Run16
Updated on Fri, 2016-04-08 10:34. Originally created by jhlee on 2016-04-08 10:34. 2016-04-11 13:00
America/New York
Monday, 11 April 2016
BNL Physics 1-224 and SeeVogh (ID 101 6255), at 17:00 (GMT), duration : 00:00
BNL Physics 1-224 and SeeVogh (ID 101 6255), at 17:00 (GMT), duration : 00:00
Time | Talk | Presenter |
---|---|---|
13:00 | projections vs goals ( 00:20 ) 1 file |
Software and Computing : Helpful tips to use pdsf @ nersc server
Updated on Thu, 2016-04-28 15:33. Originally created by devika on 2016-04-07 15:05. Helpful tips to use pdsf @ nersc server
XtendedTracks
Updated on Tue, 2016-07-26 14:38. Originally created by perev on 2016-04-07 14:45.Jul26., 2016
========================================================================================================
Almost finished version.
Upsilon->ee in AuAu 200 GeV Run14 (BHT2)
Updated on Mon, 2016-09-19 18:49 by kunsu. Originally created by marr on 2016-04-07 10:46.SIMULATION REQUEST for year 2011
Updated on Thu, 2017-05-04 07:34. Originally created by mriganka on 2016-04-07 10:00.Files : Locations / how to run /
/star/u/mriganka/FMSSim/
[run in stardev]
-----------------------------------------------------------------------------
Back to Run 15 Abort Gap background and East BBC dependence
Updated on Thu, 2016-04-07 10:00. Originally created by heppel on 2016-04-07 10:00.
Vertex Fitting
Updated on Thu, 2016-04-07 14:24 by smirnovd. Originally created by jwebb on 2016-04-07 08:17.StiCA Update
Updated on Thu, 2016-04-07 14:54 by ikisel. Originally created by jwebb on 2016-04-07 08:15.Draft Requirements Document
Updated on Thu, 2016-04-07 06:50 by akio. Originally created by lisa on 2016-04-07 00:02.Reference
Speaker : Mike Lisa
Talk time : 15:10, Duration : 00:20
late, I know.
STAR Management Meeting
Updated on Fri, 2016-04-15 10:06 by xzb. Originally created by sichterm on 2016-04-06 21:15. 2016-04-15 12:00
2016-04-15 13:00
America/New York
Friday, 15 April 2016
Meeting ID: 260125137, BNL room 1-189, at 16:00 (GMT), duration : 01:00
Meeting ID: 260125137, BNL room 1-189, at 16:00 (GMT), duration : 01:00
agenda:
1) Sti/StiCA status (Aihong et al.)
2) run status, schedule
3) BUR and iTPC scheduling
4) EPD report
https://drupal.star.bnl.gov/STAR/system/files/EPD%20review%20report%20final.docx
5) Post shower review
6) collaboration meeting program committee
7) run15 HFT report
8) Newsletter
1) Sti/StiCA status (Aihong et al.)
2) run status, schedule
3) BUR and iTPC scheduling
4) EPD report
https://drupal.star.bnl.gov/STAR/system/files/EPD%20review%20report%20final.docx
5) Post shower review
6) collaboration meeting program committee
7) run15 HFT report
8) Newsletter
STAR Management Meeting
Updated on Fri, 2016-04-08 10:23 by xzb. Originally created by sichterm on 2016-04-06 21:15. 2016-04-08 12:00
2016-04-08 13:00
America/New York
Friday, 8 April 2016
Meeting ID: 260125137, BNL room 1-189, at 16:00 (GMT), duration : 01:00
Meeting ID: 260125137, BNL room 1-189, at 16:00 (GMT), duration : 01:00
agenda:
1) FMS status and plan for run 17 (Stephen)
2) sti/stiCA status (Aihong et al.)
3) run status
4) run16 Au+Au request and discussion for next Tuesday
5) BUR (now we have run 17 and run 18)
6) production priority
7) other items
Bulkcorr third convenor, merging UPC/LFS
1) FMS status and plan for run 17 (Stephen)
2) sti/stiCA status (Aihong et al.)
3) run status
4) run16 Au+Au request and discussion for next Tuesday
5) BUR (now we have run 17 and run 18)
6) production priority
7) other items
Bulkcorr third convenor, merging UPC/LFS
Vertex Matching in Run12 pp500 Embedding
Updated on Wed, 2016-04-06 14:15. Originally created by zchang on 2016-04-06 13:38.In order to test the performance of the PPV with default parameters (nFit/nPoss = 0.7 and dcaR < 3), I produced a small test sample of 200 events in each of four partonic pT bins for three groups o
DIS 2016 W AL / Cross-section presentation
Updated on Sun, 2016-04-10 15:34. Originally created by surrow on 2016-04-06 13:28.DIS 2016 W AL / Cross-section ratio presentation:
Bad Chip Files
Updated on Thu, 2016-04-07 12:49. Originally created by bouchet on 2016-04-06 11:31. For run 16, Jim prepared several bad chip files where the online threshold has been increased :