Wilga proceedings v1
Updated on Mon, 2016-06-13 09:59. Originally created by siejka on 2016-06-13 09:59.Wilga proceedings v1
Trigger Board Meeting for Run16
Updated on Mon, 2016-06-13 09:12. Originally created by jhlee on 2016-06-13 09:12. 2016-06-13 13:00
America/New York
Monday, 13 June 2016
BNL Physics 1-224 and SeeVogh (ID 101 6255), at 17:00 (GMT), duration : 00:00
BNL Physics 1-224 and SeeVogh (ID 101 6255), at 17:00 (GMT), duration : 00:00
Time | Talk | Presenter |
---|---|---|
13:00 | dAu at 39 GeV ( 00:20 ) 1 file |
iTPC weekly meeting
Updated on Mon, 2016-06-13 08:47. Originally created by videbaks on 2016-06-13 08:46. 2016-06-13 09:45
America/New York
Monday, 13 June 2016
, at 13:45 (GMT), duration : 00:00
, at 13:45 (GMT), duration : 00:00
commnets from Jamie on teleconf with DOE NP
Missing a couple of things. Not a good connection between KPP's and science
performance (e.g. the statement "better resolution in both momentum and dE/dx for tracks of all momenta"
is missing numbers and is not explicitly connected in the text with the Technical
Performance Parameters.) Consider UPP's that need beam to be addressed.
Project controls table: who is in charge of what in terms of contingency. (Still don't have the example)
Brief statement on how the project is incorporating the recs from the task force
(e.g. commissioning time, software preparation ahead of time in order to make
commissioning time effective, etc.) Should be relatively
simple, since AFAIK you have already planned this in, just haven't stated it.
Also of course need an updated schedule.
The review in September will be a Technical, Cost, Schedule, and Management review.
Jet eta comparison for making underlying event trees
Updated on Sat, 2016-06-11 06:24. Originally created by sra233 on 2016-06-11 06:24.ICNFP - K+K- femtoscopy
Updated on Sun, 2016-06-12 11:41. Originally created by jlidrych on 2016-06-10 17:30.
RHIC-AGS Users Meeting Talk
Updated on Fri, 2016-06-10 05:28. Originally created by rfatemi on 2016-06-10 05:28.
HF-PWG minutes 2016/06/09
Updated on Thu, 2016-06-09 14:39. Originally created by marr on 2016-06-09 14:39.1) D0 v2 from 2PC using P16id data: good consistent with previsous preliminary results, as well as the EP method.
Run 16 EMC dAu 39 GeV Timing Scans
Updated on Thu, 2016-06-09 14:14. Originally created by wwjacobs on 2016-06-09 14:14.Off-line analysis from cal_scan run # 17161009
BTOW phase 120ns (was 119)
ETOW phase consistent with 103ns (was 102, analysis gives ~102.5)
Hot Quarks 2016
Updated on Wed, 2018-10-17 02:37. Originally created by shenghui on 2016-06-09 13:56.
nsigmae distribution from run14 AuAu 200 GeV
Updated on Thu, 2016-06-09 13:38. Originally created by shenghui on 2016-06-09 13:38.
Cell Cleaning Prototype
Updated on Wed, 2016-06-15 11:31. Originally created by bsumma on 2016-06-09 10:31.Note on edits: first Version had chi2 fit on less damaged cell also fit to empty bins, causing huge values
LED layout 10 KW design
Updated on Mon, 2016-06-20 17:25. Originally created by heppel on 2016-06-09 10:11.
StiCA Integration Status
Updated on Thu, 2016-06-09 09:39. Originally created by jwebb on 2016-06-09 09:39.Vertex Fitting
Updated on Thu, 2016-06-09 09:38. Originally created by jwebb on 2016-06-09 09:38.S&C Offline Software
Updated on Thu, 2016-06-09 09:37. Originally created by jwebb on 2016-06-09 09:37. 2016-06-09 16:00
2016-06-09 17:00
America/New York
Thursday, 9 June 2016
1-165, SRN, at 20:00 (GMT), duration : 01:00
1-165, SRN, at 20:00 (GMT), duration : 01:00
SRN ID: 1096183 EVO Phone Bridge Telephone Numbers: --------------- - USA (BNL, Upton, NY) +1 631 344 6100 - USA (Caltech, Pasadena, CA) +1 626 395 2112
Time | Talk | Presenter |
---|---|---|
16:00 | Vertex Fitting ( 00:20 ) 0 files | Dmitri |
16:20 | StiCA Integration Status ( 00:20 ) 0 files | All |
Grid Leak Dependence on Inner Sector Anode Voltage - GARFIELD Simulations
Updated on Wed, 2016-06-29 11:05. Originally created by iraklic on 2016-06-08 12:49.This study makes use of GARFIELD simulations to look at the dependence of the grid leak on the voltage of the anode wires.
Run12 Inclusive Jet A_LL -- embedding sample -- 4 (QA)
Updated on Wed, 2016-06-08 18:16. Originally created by zchang on 2016-06-08 12:26.v0.8 tune with exponent 0.213
v1.1 tune with exponent 0.12
pages:
1: jet pt
2: jet eta
3: jet phi
4: jet rt
5: jet paricle jt
News from the front
Updated on Wed, 2016-06-08 10:46 by yili. Originally created by testadmin on 2016-06-08 10:44.Speaker : L. Yi ( Yale )
Talk time : 12:00, Duration : 00:10