vped confusion - 2018

We want to find a way to check the mapping of the epd from the FEEs through the QT.  The idea is that if we change the vped setting in a given channel, we should see the pedestal shift.  The

North-East EPD

 Attached is a picture of the North side of the East EPD. It is to demonstrate the curvature in the fiber bundle attached to the Supersector in PP09.

Presentation to CME focus group

Below find my slides, to be shown on 13 feb 2018

comparison with standard method

 

Just some pictures for discussion


12 Feb 2018

Signals from Rx slot 18, channel 12 (Feb. 12, 2018)

Attached are scope traces of Rx slot 18, channel 12, with the trigger set at -10 mV. The largest signal that I saw after roughly 10 minutes of watching was about -15 mV.  

Strawman for isobar run

Speaker : Jeff


Talk time : 13:00, Duration : 00:20

https://online.star.bnl.gov/RTS/2018/newphp/triggerDefinition.php?run=19043001

EPD schedule

Here I keep some documents of the (much evolving) EPD schedule at the beginning of Run 2018

QA dAu 2016

 

Replies to referees

Attached are the responses to the referee,

EPD macros

The macros attached (with extensions of .txt that need to be changed to .C) can be used with some EPD functionality.

EPD 2018 scope traces


Trace 1

DSPIN17

NIMiTPC_V12

 

EPD work on Feb 08, 2018

Weekly Meeting (Feb. 8)

- Chong: pi0 mass distribution study

AOB


Talk time : 17:00, Duration : 00:20

Few additional items:

  • eTOF software effort is ramping up
    • Daniel is almost ready with a daq reader.  Next up for him is simulation...

iTPC Software Readiness

Towards an Embedding Library

Speaker : Jason


Talk time : 16:30, Duration : 00:10
TODO List for Embedding Library

Initial Look at Embedding Sample