Sort by:[Date]

DNP Talk (Preview)

The attached version of my talk for DNP does not include the full pAu data set that I plan to present.
The analysis is running and will complete in about 4 days.

Run 13 BEMC Calibration : Events counts of various trigger options

Run-13-period1

Run-list

Data production for Sti versus Sti+CA evaluation. Progress Report.

 http://www.usatlas.bnl.gov/~fisyak/star/CA/Data%20production%20for%20Sti+CA.pdf

Event Level Investigation

 

v3 squared from Frankfurt Hybrid Model

 

trigger bias without AJP and EHT0*JP1*L2Egamma

Images from Low-x presentation

 

ISMD - XLV talk

 

FMS Corrections LED Projected Calibration pp and pAu


See attached tar file for FMS corrections obtained with nearly daily LED callibration

FmsCorrW125.txt

FMS Simulation Request :