Sort by:[Date]

Calibration from Day132 dAu

 The results of calibration are linked here 

AgML Update -- Refactoring ROOT dictionary

The current implementation of AgML requires 647 separate ROOT dictionary entries in order to support the STAR geometry model.  This includes entries for each geometry module (e.g.

Run 16 notes

 5/12/2016

Investigation of what dAu rates can be run:
Comparing a standard auau HFT run with the test 70 kHz dAu zdc rate

Systematic Uncertainty 20160512

 

dAu Calibration Check

I have spent some time trying to calibrate the FMS during the recent Au-Au running (see previous drupal posts)

FMS Simulation Goals

 An update on current work on FMS simulation with a mind to future works

Run 16 EMC dAu timing scans

First analysis of d+Au timing scans taken
owl shift 11 May 2016 ... e.g., run #17132019

BTOW: the plots for crates 0x01-f and 0x10-e are appended below.

Run12 pp500 embedding QA

 

Run9 Dijet Endcap Jet Pt Correction for Jet Meeting

 

Run 13 W analysis : Study on mid rapidity "Eta-dip " - MC

 Why Eta-Dip is not seen [once W reconstrction cuts are applied] in run 13 Embedded MC [STI production] ?
During the presen