Sort by:[Date]

Max nmip and the correlation between the total nmip on the West and East side of EPD

 Mike improved the resolution of the event plane by putting a maximum constraint on t

New STAR Preliminary

Number of transported quarks in a net proton
https://www.star.bnl.gov/protected/bulkcorr/rexwg/flow/v1_62GeV_run10/Kaon/NewPrel_Ntrans.pdf

TPC tests using Vernier Scan

These are some TPC tests that need to be taken before Run 18 isobar operations end.

iTPC GridLeak wall voltage tests

Updated Midrapidity Collins Statistical Projections

Updated Collins asymmetries using final 2011 published data.

HFT effect on primary tracks in BHT2 lowmid AuAu14

 

HF minutes 2018/05/01

Lukas Kramarik:
Add TMWA technical plots instead of v2 results.

Sooraj Radhakrishnan:
slide 8 – extract and propagate correct errors on the ratio.

The STAR Mid-Rapidity Physics Program after the BES-II

 Upgrades that are currently underway to maximize the physics output from Beam

The STAR BES-II and Forward Rapidity Physics and Upgrades

 The second phase of the Beam Energy Scan at RHIC, BES-II, is scheduled for 2019-2020 and will explore with precision measurements

D0 v1 Preliminary Figures

 

Adding covariance matrix for KF Particle Finder